Fatality Risk Management Critical controls Strategic Health and Safety Plan 2015-2017: Culture of Zero Harm Newmont Sa
Views 64 Downloads 2 File size 1MB
Fatality Risk Management Critical controls
Strategic Health and Safety Plan 2015-2017: Culture of Zero Harm Newmont Safety Journey
Health & Safety
June 2015
Leadership Coaching
Leadership
Safety Interactions
Fatality Prevention
Critical Control Effectiveness
Behaviors & Engagement
Employee Behaviors
Occupational Health & Wellness
Global Health and Safety
Employee Wellness
Exposure Reduction
2
June 2015
Global Health and Safety
3
Fatality Prevention - Focusing on Critical Risk Management Understand Identify Fatality & Health Risks
Control
Assess Risks (SQRA or HRA)
Select Critical Controls
Measure Critical Controls
Verify Compliance
Report Compliance
Embed Critical Controls
Leaders actively engaged in every step
Using the Layered Audit Process to confirm implementation and understanding of critical controls
Managers (CCMPs)
Owned by operational leaders – Evaluate CC’s to confirm effectiveness.
Supervisors (Field Verification Behaviors & Systems)
Operators (Checklists and Vital Behaviors) June 2015
Global Health and Safety
Owned by Supervisors – Verify CC’s controls are in place and functioning.
Owned by Operators – Implement critical controls via Vital behaviors 4
Fatal Risk Prioritization (SQRA/Bow-Tie Results)
40%
The top 7 risks represent approximately 81% of total priority score
35%
Priority Score
30%
25% 20% 15% 10% 5% 0%
June 2015
Global Health and Safety
6
¿Qué es un control?
Controles Críticos
Control Performance Criteria
June 2015
Global Health and Safety
10
Bow Tie
CC Performance criteria
Fatality Risks Comparison Newmont Risks 1.
Event During Confined Space Work
Yanacocha Risks 1.
VEHICULAR INCIDENT (NOT MINE)
2.
Uncontrolled Load During Crane & Lifting Activity
2.
INCIDENT WITH LOCAL COMMUNITIES
3.
Electric Shock / Arc Flash (Deferred)
3.
TRAPPED BY ACTIVITIES DURING THE LOAD LIFTING
4.
Uncontrolled Release of Stored Energy
4.
EXPOSURE TO SEVERE WEATHER
5.
Fall From Height
5.
6.
Fall of Ground - Surface Operations
6.
7.
Fall of Ground - UG Operations (Deferred)
8.
Single Vehicle Event - HV
9.
Collisions Involving Heavy Vehicles – On Site
10.
Mobile Equipment - Pedestrian Interaction Underground
INCIDENT DURING ACTIVITIES IN CONFINED SPACE VEHICULAR INCIDENT (MINE)
Fatality Prevention - Focusing on Critical Risk Management Understand Identify Fatality & Health Risks
Control
Assess Risks (SQRA or HRA)
Select Critical Controls
Measure Critical Controls
Verify Compliance
Report Compliance
Embed Critical Controls
Leaders actively engaged in every step
Using the Layered Audit Process to confirm implementation and understanding of critical controls
Managers (CCMPs)
Owned by operational leaders – Evaluate CC’s to confirm effectiveness.
Supervisors (Field Verification Behaviors & Systems)
Operators (Checklists and Vital Behaviors) June 2015
Global Health and Safety
Owned by Supervisors – Verify CC’s controls are in place and functioning.
Owned by Operators – Implement critical controls via Vital behaviors 14
Fatality Risk Responsible Individuals Newmont Risks
Responsible
1.
Event During Confined Space Work
Sergio Vicuña
2.
Uncontrolled Load During Crane & Lifting Activity
Javier Romero
3.
Electric Shock / Arc Flash
Manuel Vergara
4.
Uncontrolled Release of Stored Energy
Martín Gonzalez
5.
Fall From Height
6.
Fall of Ground - Surface Operations
Jhony Mamani
7.
Fall of Ground - UG Operations
Eduardo García
8.
Single Vehicle Event – HV
9.
Collisions Involving Heavy Vehicles – On Site
Yuri Saenz
10.
Mobile Equipment - Pedestrian Interaction - Underground
Tim Sirotec
Vidal Pinto
Iliam Aguirre
Action Plan Activity
Date
Explanation of the review process Fatality Risk Management at SLT
8/1/16
Define responsible for each risk
8/1/16
Performance Criteria review of each risk, performed by the group responsible
8/3/16
Presentation of Report to Isidro Oyola
8/4/16
Focus group with site subject matter experts to start process of 1st week of updating the Critical Control Management Plans October Development of new check list for layered audits with Critical Controls and Performance Criteria
3th week of October
Socialization with layered audit teams and other workers
11/15/16
Application of new layered audits
4th week of November
Thank you!