Examen 3 Gestion Diaz

Costo de Intervencion (*) (*) ITEM Rodamientos Turbina Vernier Lija Aceites Grasas Trapos Sellos Alicate CANTIDAD 8

Views 186 Downloads 6 File size 117KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Costo de Intervencion

(*)

(*)

ITEM Rodamientos Turbina Vernier Lija Aceites Grasas Trapos Sellos Alicate

CANTIDAD 8 1 1 25 12 0.5 11 2 1

P.U S/ 25 250 300 1 50 20 3 15 15 Total

C. Total S/200.00 S/250.00 S/25.00 S/600.00 S/10.00 S/33.00 S/30.00 S/1,148.00

(*) No se tendrán en cuenta en el costo de insumos y repuestos

TRABAJADORES Técnico Supervisor N° 2 1 Sueldo/mes S/1,500.0 S/3,000.0 Turnos 2 2 C. Total S/6,000.0 S/6,000.0

Costo de inversión = C. Mano de obra + C. Insumos, repuestos y mantenimiento = S/6000 + S/1148 = S/7148

+ S/1148 = S/7148

COSTOS FALLA

PRODUCCIÓN TIEMPO DE TRABAJO

1000ton/dia 24H/6d

CAPACIDAD PRODUCTIVA

41.67ton/h 9.9S

CP

FALLAS POR MANTENIMIENTO MP 276min Bombas 255min Comprensores 200min Maquinas y ajustes 335min 17.76hr

COSTOS PARCIAL COSTO FALLA TOTAL

80h S/117,225.38

17.7H

412.533s/h

20%

412.583s/h

117225.376

Costo de Almacenamiento Interés trimestral ITEM Rodamientos Turbina Vernier Lija Aceite Grasa Trapos Sellos Alicate

CANTIDAD 8 1 1 25 12 0.5 11 2 1

P.U. S/. 25 250 300 1 50 20 3 15 15

Costo de Repuesto 796.31 995.39 1791.69

3.9815

Costo global Total

1791.69

Pregunta 2

EQUIPO Bomba 01 Bomba 02 Bomba 03 Bomba 04 Bomba 05 Bomba 06 Bomba 07 Bomba 08 Bomba 09 Bomba 10 TOTAL

T.CALENDAR Manito No Manito Prog IO Prog 480.00 480.00 480.00 480.00 480.00 480.00 480.00 480.00 480.00 480.00 4800.00

30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 300.00

50.00 45.00 70.00 60.00 35.00 60.00 50.00 20.00 30.00 80.00 500.00

T.NETO 370.00 390.00 357.50 352.50 392.50 360.00 355.00 400.00 405.00 295.00 3677.50

T.Utilizable 450.00 465.00 457.50 442.50 457.50 450.00 435.00 450.00 465.00 405.00 4477.50

N° Paradas 6.00 4.00 7.00 3.00 4.00 5.00 4.00 3.00 5.00 8.00 49.00

Ao 82.22% 83.87% 78.14% 79.66% 85.79% 80.00% 81.61% 88.89% 87.10% 72.84% 82.13%

MTBF 61.67 97.50 51.07 117.50 98.13 72.00 88.75 133.33 81.00 36.88 75.05

MTTR 8.33 11.25 10.00 20.00 8.75 12.00 12.50 6.67 6.00 10.00 10.20

Ai 88.10% 89.66% 83.63% 85.45% 91.81% 85.71% 87.65% 95.24% 93.10% 78.67% 88.03%

Tenemos que el valor hallado para el MTTR tiene un valor muy alto en comparación con el Benchmarking por lo que se está perdiendo demasiado tiempo debido a las fallas que presentan las bombas, se sugiere que se debería gestionar mejor este tiempo realizando una mayor cantidad de mantenimientos preventivos de este modo podemos aumentar la disponibilidad inherente y disminuir el tiempo perdido en las bombas.