1.50 2.00 2.50 2.00 1.00 1.00 HASTA 2.50 METROS HASTA 2 METROS A. DEL TRAPECIO 3.75 2.5 EXCAVA. ZANJA 238.11
Views 121 Downloads 4 File size 115KB
1.50
2.00
2.50
2.00
1.00
1.00
HASTA 2.50 METROS
HASTA 2 METROS
A. DEL TRAPECIO
3.75
2.5
EXCAVA. ZANJA
238.114
EXCAVA. ZANJA
158.743
AREA 1
AREA 1
LONGITUD
3.75 3.75 63.497
2.50 2.50 63.497
EXCAVA. ZANJA
198.428
AREA 1
3.75 2.5 63.497
AREA 2
AREA 2 LONGITUD
TRMS
1 2 3 4 5 6 7 8 9
198.428 158.625 21..6 357.053
AREA 2 LONGITUD
103.246
M3
2.5 1.65 49.757
AREA 1 AREA 2 LONGITUD
1 2 3 4 5 6 7 8 9
131.756 131.756 103.246 366.758
10 11 12 13 14 15
10 11 12 13 14 15 352.553
362.258
1.50
1.20
1.50
1.00
1.00 HASTA 1.5 METROS
1.65 EXCAVA. ZANJA
5.7057
AREA 1
1.65 1.65 3.458
AREA 2 LONGITUD
21.6 3.75 1.65 8
AREA 1 AREA 2 LONGITUD
1 2 3 4 5 6 7 8 9
104.7701 26.133 99.007 99.007 106.4415 62.969 5.709 96.938 82.099
10 11 12 13 14 15
66 49.5 798.5736
782.0736
AREA DEL TRAPECIO FORMULA =
(AREA MAYOR + AREA MENOR) 2
X ALTURA
EXCAVACION DE ZANJA FORMULA ZANJA =
(AREA 1 + AREA 2) 2
X LONGITUD
METRO
HU.3.1 HU.3.1.1 HU.3.1.2 HU.3.1.3 HU.3.2 HU.3.2.1 HU.3.2.1.1 HU.3.2.1.1.1 HU.3.2.1.1.2 HU.3.2.1.2 HU.3.3 HU.3.3.1 HU.3.3.1.1 HU.3.3.1.2 HU.3.3.1.2.1 HU. 3.3.2 HU.3.3.2.1 HU.3.3.2.2 HU.3.3.3 HU.3.3.3.1 HU.3.4 HU.3.4.1 HU.3.4.1.1 HU.3.4.2 HU.3.4.2.1 HU.3.4.3 HU.3.4.3.1 HU.3.4.3.1.1 HU.3.4.4 HU.3.4.4.1 HU.3.5 HU.3.5.1 HU.3.5.2 HU.3.6 HU.3.6.1 HU.3.6.2 HU.3.6.3 HU.3.6.3.1 HU.3.6.3.2 HU.3.6.3.3 HU.3.7 HU.3.7.1 HU.3.7.2 HU.3.7.3
OBRAS PROVISIONALES OFICINA ALMACEN Y CASETA DE GUARDIANIA CARTEL DE OBRA TRANSPORTE DE MATERIAL Y EQUIPOS TRABAJOS PRELIMINARES TRAZO NIVELES Y REPLANTEO TRAZO NIVELES Y REPLANTO PRELIMINAR Y DURANTE LA OBRA PARA LA INSTALACION DE LINEAS, REDES DEPENDIENEDO DE LA ENVERGAD PARA CONEXIONES DOMICILIARIAS REPLANTO AL FINALZIAR LA OBRA SEGURIDAD Y SALUD PROTECCION DE SERVICIOS EXISTENTES, ENTIBADOS Y TABLAESTACADOS ENTIBADOS Y TABLAESTACADOS TABLAESTACADO CONTINUO PARA EXCAVACIONES DE ZANJAS SEÑALIZACION DEL TRANSITO VEHICULAR Y SEGURIDAD SEÑALIZACIONES, ILUMINACION NOCTURNA PASES TEMPORALES: VEHICULARES Y PEATONALES MEDIO AMBIENTE RIEGO DE LA ZONA DE TRABAJO POR CONTAMINACION DEL AIRE (POLVO) MOVIMIENTO DE TEIRRAS EXCAVACIONES EXCAVACIONES DE ZANJAS REFINE Y NIVELACION REFINE Y NIVELACION DE ZANJAS RELLENOS RELLENO Y COMPACTACION PARA ZANJAS RELLENO DEZANJA CON MATERIAL PROPIO ELIMINACION DEL DESMONTE Y/O DEL MATERIAL EXCEDENTE ELIMINACION DEL MATERIAL EXCEDENTE DE EXCAVACIONES DE ZANJAS TUBERIAS SUMINISTRO DE TUBERIAS INSTALACION DE TUBERIAS ACCESORIOS SUMINISTRO DE ACCESORIOS PARA TUBERIAS INSTALACION DE ACCESORIOS PARA TUBERIAS ANCLAJE Y DADOS DE CONCRETO PARA ACCESORIOS PAR ANCLAJES DE DISEÑO TIPICO O SIMILAR PARA EL CONCRETO PARA EL ENCOFRADO Y DESENCOFRADO VALVULAS GRIFOS Y MEDIDORES DE CAUDAL SUMINISTRO DE VALVULAS, GRIJOS Y MEDIDORES DE CAUDAL SUMINISTRO DE COMPONENTES DE INSTALACION HIDRAULICA PARA VALVUL MONTAJE EN CAMARA DE VALVULAS GRIFOS Y MEDIDORES DE CAUDAL
UND
UNIDAD M3 METRO UND
HU.3.7.3.1 HU.3.7.5 HU.3.7.5.1 HU.3.7.6 HU.3.8 HU.3.8.1 HU.3.9 HU.3.9.1 HU.3.9.2 HU.3.9.3 HU.3.9.4 HU.3.10 HU.3.11 HU.3.12 HU.3.13 HU.3.13.1 HU.3.15.1.1 HU.3.15.1.2 HU.3.17 HU.3.17.1 HU.3.18 HU.3.18.1 HU.3.18.2 HU.3.18.3 HU.3.18.4 HU. HU. HU. HU. HU. HU. HU. HU.
CUANDO SE TRATA DE COMPONENTES AGRUPADOS ELEMENTOS PARA CONEXCIONES DOMICILIARIAS SUMINISTRO DE ELEMENTOS DE CONEXION DOMICILIARIA DE ALCANTARILL INSTALACION DE ELEMENTOS DE CONEXION DOMICILIARIA DE ALCANTARIL CAMARAS PARA VALVULAS Y SIMILARES CONSTRUCCION DE CAMARAS PAR AVALVULAS DE AIRE, PURGA, CONTROL CAMARAS DE INSPECCION: BUZONES, BUZONETAS, CAJAS, CAMARAS DE RE PARA CAMARAS DE DISEÑO TIPICO O SIMILAR PARA EL CONCRETO PARA EL ENCOFRADO Y DESENCOFRADO PARA MARCOS Y TAPAS ESTACIONES DE BOMBEO, REBOMBEO PARA AGUA POTABLE Y AGUAS RESID ESTRUCTURAS DE ALMACENAMIENTO INSTALACIONES ELECTROMECANICAS INSTALACIONES HIDRAULICAS SUMINISTRO TRANSPORTE DE COMPONENETES DE INSTALACION HIDRAULIC PARA LAS VALVULAS, CODOS, TEES, MEDIDODRES, ETC. PARA TUBERIAS EMPALMES EMPALMES DE TUBERIAS DE AGUA POTABLE Y ALCANTARILLADO PRUEBAS HIDRAULICAS Y DE CALIDAD PRUEBA FINAL Y DESINFECCION DE TUBERIAS PRUEBA FINAL Y DESINFECCION DE ESTRUCTURAS HIDRAULICAS PRUEBA DE COMPACTACION DE SUELOS PRUEBA DE CALIDAD DE CONCRETO
DURANTE LA OBRA EPENDIENEDO DE LA ENVERGADURA DE LA OBRA
NTIBADOS Y TABLAESTACADOS
SEGURIDAD
AMINACION DEL AIRE (POLVO)
RIAL EXCEDENTE EXCAVACIONES DE ZANJAS
ORES DE CAUDAL CION HIDRAULICA PARA VALVULAS, GRIFOS Y MEDIDORES CAUDAL Y MEDIDORES DE CAUDAL
DOMICILIARIA DE ALCANTARILLADO DOMICILIARIA DE ALCANTARILLADO
AS DE AIRE, PURGA, CONTROL O SIMILAR NETAS, CAJAS, CAMARAS DE REUNION
AGUA POTABLE Y AGUAS RESIDUALES:
TES DE INSTALACION HIDRAULICA ODRES, ETC.
Y ALCANTARILLADO
TURAS HIDRAULICAS
METRADOS PROYECTO: PROPIETARIO: LUGAR: FECHA: TIPO DE SUELO: ARENA SUELTA = ARENA COMPACTA FE: 1.25% ITEM 1 1.1 1.1.1 1.1.1.1 1.1.1.2 2 POR TIPO DE 2.1 DIAMETRO NOMINAL, 2.1.1 TIPO DE TERRENO Y 2.1.2 PROFUNDIDAD 2.1.3 2.2 2.2.1 2.2.1.1 2.2.1.2 2.2.1.3 EL VOLUMEN DEL MATERIAL QUE SE CONSIDERE EN EL ANALISIS DE COSTO INCLUYE SU ESPONJAMIENTO
2.3 2.3.1 2.3.2 2.3.3 3 3.1 5 5.1 5.1.1 5.1.2 5.1.3 5.1.4 6
6.1 6.1.1 6.1.1.1 6.1.1.2 6.1.1.3 6.1.2 6.1.2.1 6.1.2.2 6.1.3
METRADOS PROYECTO: PROPIETARIO:
TIPO DE SUELO: ARENA SUELTA = ARENA COMPACTA FE: 1.25% DESCRIPCION TRABAJOS PRELIMINARES TRAZO NIVELES Y REPLANTEO TRAZO NIVELES Y REPLANTEO PRELIMINAR Y DURANTE LA OBRA PARA LA INSTALACION DE LINEAS, REDES PARA CONEXIONES DOMICILIARIAS MOVIMIENTO DE TIERRAS EXCAVACIONES EXCAVACIONES DE ZANJAS c/maquinaria HASTA 1.50M EXCAVACIONES DE ZANJAS c/maquinaria HASTA 2.00M EXCAVACIONES DE ZANJAS c/maquinaria HASTA 2.50M RELLENOS RELLENO Y COMPACTACION PARA ZANJAS RELLENO CON MATERIAL PROPIO HASTA 1.50M RELLENO CON MATERIAL PROPIO HASTA 2.00M RELLENO CON MATERIAL PROPIO HASTA 2.50M ELIMINACION ELIMINACION ELIMINACION ELIMINACION
DEL DEL DEL DEL
MATERIAL MATERIAL MATERIAL MATERIAL
EXCEDENTE EXCEDENTE DE EXCAVACION DE ZANJAS HASTA 1.50M EXCEDENTE DE EXCAVACION DE ZANJAS HASTA 2.00M EXCEDENTE DE EXCAVACION DE ZANJAS HASTA 2.50M
TUBERIAS INSTALACION DE TUBERIAS VALVULAS, GRIFOS Y MEDIDORES DE CAUDAL INSTALACION DEELEMENTOS DE CONEXIÓN DOMICILIARIA DE ALCANTARILLADO CACHIMBA DADO DE CONCRETO 30X30 TUBERIA CAJA DE REGISTRO BUZONES, BUZONETAS, CAJAS, CAMARAS DE REUNION
BUZONES PARA EL CONCRETO PARA CONCRETO SIMPLE FC 175 KG/CM2 PARA CONCRETO ARMADO FC 210 KG/CM2 ACERO PARA CONCRETO 210 PARA EL ENCOFRADO Y DESENCOFRADO PARA EL ENCOFRADO DE MADERA PARA EL ENCOFRADO METALICO PARA MARCOS Y TAPAS
P^2 = (A X B X L X 3.28) / 12
254
18 120 60.6
UNIDAD
M und
METRADO
731.888 82
M3 M3 M3 M3
1522.3846 1201.2 272.25 30
M3 M3 M3 M3
1496.885 782.074 362.258 352.553
M3 M3 M3 M3
31.8745 523.9075 -112.51 -403.19125
M
UND UND UND UND UND
731.888
82 82 82 82
117.4 8 47 14.5 26.7 14.7 23.5 704.4
3.5 98 39
140.5
844.9
833.4
851.75
cantidad de tuberia a utilizar en alcantarillado numero de casas para conexiones domiciliarias
346.5 48 394.5 1227.9 1239.4
M3 M3 KG M2 M2 KG UND
53.8 5.05 17.892
17
1.76715 AREA DE 1.50 DE DIAMETRO
cantarillado domiciliarias
1203.75
18
17
6 23
7 17 88
2 176
3 4 5 264 352 440
1.50
2.00
2.50
2.00
1.00
1.00
HASTA 2.50 METROS
HASTA 2 METROS
A. DEL TRAPECIO
3.75
2.5
EXCAVA. ZANJA
30
EXCAVA. ZANJA
146.75
AREA 1
AREA 1
LONGITUD
3.75 3.75 8
2.50 2.50 58.7
EXCAVA. ZANJA
198.428
AREA 1
3.75 2.5 63.497
AREA 2
AREA 2 LONGITUD
TRMS
1 2 3 4 5 6 7
AREA 2 LONGITUD
30
30
121.803
M3
2.5 1.65 58.7
AREA 1 AREA 2 LONGITUD
1 2 3 4 5 6 7
66.75 58.75 146.75 272.25
8 9 10 11 12 13 14 15
8 9 10 11 12 13 14 15 25.5
267.75
1.50
1.20
1.50
1.00
1.00
HASTA 1.5 METROS
^
1.65 EXCAVA. ZANJA
96.855
AREA 1
1.65 1.65 58.7
AREA 2 LONGITUD
158.49 3.75 1.65 58.7
AREA 1 AREA 2 LONGITUD
1 2 3 4 5 6 7
104.775 104.775 104.775 104.775 29.7 297.99 101.475
cama de apoyo diametro de tuberia area del triangulo area del cuadrado area sobre lomo de tub area total libre area total de la seccion diferencias de areas longitud
8 9 10 11 12 13 14 15
24.255 226.05 5.775 96.855 1201.2
√0.26
AREA DEL TRAPECIO
longitud total de tuberia FORMULA =
(AREA MAYOR + AREA MENOR) 2
X ALTURA
cama de apoyo reposa s se da como cama de apo EXCAVACION DE ZANJA FORMULA ZANJA =
ma de apoyo metro de tuberia
(AREA 1 + AREA 2) 2
X LONGITUD
CAMA DE APOYO RELENO SOBRE CLAVE DE TUBO
0.10 0.20
RELLENO SOBRE CLAVE DE TUBO
0.20
DIAMETRO DE TUBERIA
hasta 1.20
hasta 2.00
hasta 1.50 42.245
0.031416
0.031416
0.031416
a del triangulo
0.00825
0.025
0.015625
a del cuadrado
0.32
0.32
0.32
a sobre lomo de tub a total libre
0.04 0.4
0.04 0.4
0.04 0.4
a total de la seccion rencias de areas
0.40825 0.376834
0.425 0.393584
728
8
274.335152
3.148672
844.9 42.245 1.76715
0.415625 0.384209 108.9 41.8403601
394.5 1239.4 43.6542932 35.343
hasta 1.20 1201.2
gitud total de tuberia
1238.4
ma de apoyo reposa sobre la tuberia de un diametro de 0.2 da como cama de apoyo no a todo el ancho de la zanja sino a 0.5m de base de tubo
hasta 2.00
hasta 1.50 30 272.25
1503.45
excavaciones
METRADOS PROYECTO: PROPIETARIO: LUGAR: FECHA: TIPO DE SUELO: ARENA SUELTA = ARENA COMPACTA FE: 1.25% ITEM 1 1.1 1.1.1 1.1.1.1 1.1.1.2 2 2.1 2.1.1 2.1.2 2.1.3 2.2 2.2.1 2.2.1.1 2.2.1.2 2.2.1.3 2.3 2.3.1 2.3.2 2.3.3 3 3.1 5 5.1 5.1.1 5.1.2 5.1.3 5.1.4
6 6.1 6.1.1 6.1.1.1 6.1.1.2 6.1.1.3 6.1.2 6.1.2.1 6.1.2.2 6.1.3
METRADOS
ROYECTO: ROPIETARIO:
PO DE SUELO: ARENA SUELTA = ARENA COMPACTA FE: 1.25% DESCRIPCION TRABAJOS PRELIMINARES TRAZO NIVELES Y REPLANTEO TRAZO NIVELES Y REPLANTEO PRELIMINAR Y DURANTE LA OBRA PARA LA INSTALACION DE LINEAS, REDES PARA CONEXIONES DOMICILIARIAS MOVIMIENTO DE TIERRAS EXCAVACIONES EXCAVACIONES DE ZANJAS c/maquinaria HASTA 1.50M EXCAVACIONES DE ZANJAS c/maquinaria HASTA 2.00M EXCAVACIONES DE ZANJAS c/maquinaria HASTA 2.50M RELLENOS RELLENO Y COMPACTACION PARA ZANJAS RELLENO CON MATERIAL PROPIO HASTA 1.50M RELLENO CON MATERIAL PROPIO HASTA 2.00M RELLENO CON MATERIAL PROPIO HASTA 2.50M ELIMINACION ELIMINACION ELIMINACION ELIMINACION
DEL DEL DEL DEL
MATERIAL MATERIAL MATERIAL MATERIAL
EXCEDENTE EXCEDENTE DE EXCAVACION DE ZANJAS HASTA 1.50M EXCEDENTE DE EXCAVACION DE ZANJAS HASTA 2.00M EXCEDENTE DE EXCAVACION DE ZANJAS HASTA 2.50M
TUBERIAS INSTALACION DE TUBERIAS VALVULAS, GRIFOS Y MEDIDORES DE CAUDAL INSTALACION DEELEMENTOS DE CONEXIÓN DOMICILIARIA DE ALCANTARILLADO CACHIMBA DADO DE CONCRETO 30X30 TUBERIA CAJA DE REGISTRO
BUZONES, BUZONETAS, CAJAS, CAMARAS DE REUNION BUZONES PARA EL CONCRETO PARA CONCRETO SIMPLE FC 175 KG/CM2 PARA CONCRETO ARMADO FC 210 KG/CM2 ACERO PARA CONCRETO 210 PARA EL ENCOFRADO Y DESENCOFRADO PARA EL ENCOFRADO DE MADERA PARA EL ENCOFRADO METALICO PARA MARCOS Y TAPAS
UNIDAD
M und
METRADO
731.888 82
M3 M3 M3 M3
0 0 0
M3 M3 M3 M3
782.074 362.258 352.553
M3 M3 M3 M3
31.8745 -977.5925 -452.8225 -440.69125
M
UND UND UND UND UND
731.888
82 82 82 82
M3 M3 KG M2 M2 KG UND
53.8 5.05 17.892
17
area del cuadrado BUZONES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
1 2 3 4 5 15 16 17 6 12 13 14 7 18 19 20 8 9 10 11 BZ
2 3 4 5 6 16 17 6 7 13 14 7 8 19 20 8 9 10 11 EX
H BZ 1
H BZ 2 1.200 1.200 1.403 1.300 1.200 1.200 1.300 1.250 1.200 1.200 1.200 1.450 1.600 1.200 1.200 1.200 1.600 1.200 1.474 2.430
LONGITUD 1.200 1.403 1.300 1.200 1.200 1.300 1.250 1.200 1.600 1.200 1.450 1.600 1.600 1.200 1.200 1.600 1.200 1.474 2.430 1.690
LONGITUD NETA SIN BUZONES
63.500 63.500 63.500 63.500 18.000 60.600 60.000 60.000 14.700 47.000 14.500 26.700 23.500 39.000 49.000 49.000 3.500 58.700 58.700 8.000 844.900
1.5 62.000 62.000 62.000 62.000 16.500 59.100 58.500 58.500 13.200 45.500 13.000 25.200 22.000 37.500 47.500 47.500 2.000 57.200 57.200 6.500
DIFERENCIA DIFERENCIA DIFERENCIA S DE AREAS S DE AREAS S DE AREAS h=1.50 h=2.00 h=2.50 0.021 0.031 area de los triangulos base menor 1.083 1.167
0.050
1.250
0.5 Ø de tub. (M) 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031 0.031
A. cama de apoyo 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 42.245
area de relleno h=1.50
area mayor de zanja
0.439 0.1 1.2
1.650
area del buzon 1 area del buzon 2
1.320 1.320 1.543 1.430 1.320 1.320 1.430 1.375 1.320 1.320 1.320 1.813 2.000 1.320 1.320 1.320 1.760 1.320 1.843 3.645 422.450
area de relleno h=2.00 0.450 0.25 1.500
2.500
1.320 1.543 1.430 1.320 1.320 1.430 1.375 1.320 1.760 1.320 1.595 2.000 2.000 1.320 1.320 1.760 1.320 1.621 3.038 2.535
promedio de areas 1.320 1.432 1.487 1.375 1.320 1.375 1.403 1.348 1.540 1.320 1.458 1.906 2.000 1.320 1.320 1.540 1.540 1.471 2.440 3.090 32.003
volumen de excava 83.820 90.910 94.402 87.313 23.760 83.325 84.150 80.850 22.638 62.040 21.134 50.897 47.000 51.480 64.680 75.460 5.390 86.330 143.228 24.720 1283.526
relleno sobre clave de tuberia 27.244 27.244 27.244 27.244 7.250 25.970 25.706 25.706 5.800 19.993 5.712 11.336 9.896 16.478 20.872 20.872 0.879 25.135 25.731 3.046 359.358
relleno -25.924 -25.812 -25.757 -25.869 -5.930 -24.595 -24.303 -24.358 -4.260 -18.673 -4.255 -9.430 -7.896 -15.158 -19.552 -19.332 0.661 -23.664 -23.291 0.044 -327.356 -286.783 46.963 3.046
relleno en parte relleno en parte superior de tub. superior 70.785
PROMEDIO DE ALTURA DE ALTURAS ZANJA LIBRE
1.200 1.302 1.352 1.250 1.200 1.250 1.275 1.225 1.400 1.200 1.325 1.525 1.600 1.200 1.200 1.400 1.400 1.337 1.952 2.060
0.700 0.802 0.852 0.750 0.700 0.750 0.775 0.725 0.900 0.700 0.825 1.025 1.100 0.700 0.700 0.900 0.900 0.837 1.452 1.560
area de relleno h=2.50
VOLUMENDE LA TUBERIA
0.469
1.995
0.5 2.000
3.750
Base del trapecio mayor 1.083 1.083 1.083 1.083 1.083 1.083 1.083 1.083 1.083 1.083 1.083 1.167 1.167 1.083 1.083 1.083 1.083 1.083 1.167 1.250
area del trapecio par. Superior
0.799 0.915 0.972 0.856 0.799 0.856 0.885 0.828 1.028 0.799 0.942 1.367 1.467 0.799 0.799 1.028 1.028 0.956 1.936 2.535
AREA DE LA ZANJA hasta h= 1.50,2.00,2.50
1.320 1.432 1.487 1.375 1.320 1.375 1.403 1.348 1.540 1.320 1.458 1.906 2.000 1.320 1.320 1.540 1.540 1.471 2.440 3.090
81.825 88.915 92.407 85.318 21.765 81.330 82.155 78.855 20.643 60.045 19.139 48.902 45.005 49.485 62.685 73.465 3.395 84.335 141.233 22.725
VOLUMEN DE RELLENO SIN CLAVE DE TUB
49.548 56.733 60.272 53.088 13.186 50.604 51.760 48.421 13.563 36.362 12.244 34.440 32.267 29.969 37.960 48.806 2.055 54.659 110.739 16.478 813.155
VOL DE RELLENO
VOLUMEN DE EXCAVACION
56.576 63.666 67.158 60.069 16.510 57.355 58.444 55.144 16.838 42.047 15.421 39.561 37.104 35.002 43.808 54.588 4.511 61.195 117.497 21.674 924.168
83.820 90.910 94.402 87.313 23.760 83.325 84.150 80.850 22.638 62.040 21.134 50.897 47.000 51.480 64.680 75.460 5.390 86.330 143.228 24.720 1283.526
26.543
897.625
VOLUMEN FACTOR DE DE ESPONJAMIE ELIMINACIO NTO (1.10) N 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 1.995 39.898
2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 2.194 43.888
48.297 54.742 57.917 51.472 13.690 49.121 50.135 47.135 14.121 35.747 12.841 28.7069322 27.028901 29.663 37.269 47.069 3.362 52.688 88.1771442 12.965 618.234 143.912977
12.731328 12.731328
774.878
Consideraciones para poner buzones Longitud de los tramos max 65m Cambio de flujo Intersecciones de tuberia La tuberia siempre va uniforme
0.60 de radio borde
Que aseguren una pendente minima de 8 por mil. Se puede trabajAR con pendientes minimas y maximas0.60 x 0.20 (piso)
altura buzon 0.282744 AREA DE FIERRO FUNDIDO 1.76715 AREA DE TAPA 1.484406 5.0469804 0.005625 0.0176715
15CM 30CM
0.636174 DIFERENCIA DE AREAS 0.070686 0.282744 0.636174
peso de la avrilla de media 1.130976 0.2261952 3-Aug Ø 3/8
0.47124
Ø 1/2
1.5 BUZON
1.2
1.76715 1.130976
0.2
0.636174 VARIABLE
0.8
0.2261952
0.2 1.49 0.2144103
la avrilla de media
0.95 0.95 #VALUE!
2 0.94248 17 16.02216 1.29 19.19 0.30
CALCULO DE M3 DE CONCRETO EN BUZONES
8.946 13.280
11.61
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
CALCULO DE M3 DE CONCRETO EN TAPA DE BUZON
0.19268144 0.29688 17 BUZONES 0.14389951 5.04696 5.9376 0.28276253 concreto 210 0.30290846 0.14389951 0.14389951 0.14389951 0.15828946 0.14389951 0.21426636 0.14389951 0.18332797 0.3208959 0.21441026 0.14389951 0.14389951 0.14389951 3.16463797 53.7988455 concreto 175 56.0708343
volumen de tapa
0.30 m3
MEDIA CAÑA
area del buzon
1.76715 area del marco
h = 0.20
0.35343 h = 0.20
1.2 0.2
PARA EL METRADO Y EL DISEÑO ES A 3/4 DEL TUBO
0.3 0.2
0.5
0.2
0.5
0.15
1.2 CALCULO DE ACERO EN TAPA 2 Ø 1/2 1/2 peso longitud kg x 1 fierro kg x 2 fierros metrado en kg
0.994 9 8.946 17.892 17.892
CALCULO DE CONCRETO EN MEDIA CAÑA 0
0.20 1 SOLO SENTIDO 0.24 2 SENTIDOS 0.24 3 SENTIDOS
0.18 0.03 0.15 15
en tapa de buzones solo va acero longitudinal por 1 sentido tanto el acero perimetrico y la tapa se metra por unidad
1.130976 area interior 0.1696464 volumen de diseño 0.036 0.054 0.072 0.018 0.1336464 1 solo sentido 0.1156464 en 1 1/2 sentido 0.0976464 en 2 sentidos 0.1516464 en 1/2 sentido
13 2
1.7374032 0.2312928
2
0.3032928 2.2719888
0.2827 0.05654
1.48445 area 0.29689 volumen
0.24 1 SOLO SENTIDO 0.20 TOTAL 0.19 1 TRAMO 0.17 2 TRAMOS
63.9666667
A EL METRADO Y EL O ES A 3/4 DEL TUBO
0.1 0.2
0.031416
0.0376992 X LONGITUTOD TOTAL 0.015708 X 1 TRAMO 0.031416 X2 TRAMO 0.0534072 0.0691152
area del cuadrado altura de trapecio parte inferior BUZONES H BZ 1 H BZ 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Ø de tub. (M)
1 2 3 4 5 15 16 17 6 12 13 18 19 20 8 9 14 7 10 11 BZ EX
0.031
0.1 0.25 0.5
2 3 4 5 6 16 17 6 7 13 14 19 20 8 9 10 7 8 11
A. cama de apoyo 0.5 0.5 0.5
1.200 1.200 1.403 1.300 1.200 1.200 1.300 1.250 1.200 1.200 1.200 1.200 1.200 1.200 1.600 1.200 1.450 1.600 1.474 2.430
0.050
1.200 1.403 1.300 1.200 1.200 1.300 1.250 1.200 1.600 1.200 1.450 1.200 1.200 1.600 1.200 1.474 1.600 1.600 2.430 1.690
area de triangulo 2 2 2
area del cuadrado 0.5 LONGITUD 63.500 63.500 63.500 63.500 18.000 60.600 60.000 60.000 14.700 47.000 14.500 39.000 49.000 49.000 3.500 58.700 26.700 23.500 58.700 8.000 844.900
LONGITUD NETA SIN BUZONES 1.500 62.000 62.000 62.000 62.000 16.500 59.100 58.500 58.500 13.200 45.500 13.000 37.500 47.500 47.500 2.000 57.200 25.200 22.000 57.200 6.500
0.083 base mayor parte 0.166 inferior 0.250 #DIV/0! #DIV/0! #DIV/0!
area del buzon 1 1.320 1.320 1.543 1.430 1.320 1.320 1.430 1.375 1.320 1.320 1.320 1.320 1.320 1.320 1.760 1.320 1.813 2.000 1.843 3.645
area del buzon 2
promedio de VOUMEN DE areas EXAVACION
1.320 1.543 1.430 1.320 1.320 1.430 1.375 1.320 1.760 1.320 1.595 1.320 1.320 1.760 1.320 1.621 2.000 2.000 3.038 2.535
1.320 1.432 1.487 1.375 1.320 1.375 1.403 1.348 1.540 1.320 1.458 1.320 1.320 1.540 1.540 1.471 1.906 2.000 2.440 3.090
1.083 area del trapecio 1.166 de la clave de tub 1.250
0.521 0.542 0.563
83.820 90.910 94.402 87.313 23.760 83.325 84.150 80.850 22.638 62.040 21.134 51.480 64.680 75.460 5.390 86.330 50.897 47.000 143.228 24.720 1283.526
area del trapecio descontando cama y tubo
VOLUMEN volumen de DE RELLENO VOLUMEN relleno con EN CLAVE DE RELLENO tuberia DE TUBO 27.239 27.239 27.239 27.239 7.249 25.965 25.701 25.701 5.799 19.990 5.711 16.475 20.868 20.868 0.879 25.130 11.594 10.122 26.317 3.127 360.451
0.439 0.460 0.481
32.287 32.287 32.287 32.287 8.592 30.776 30.464 30.464 6.874 23.694 6.770 19.528 24.736 24.736 1.042 29.787 13.646 11.913 30.974 3.656 426.797 1194.776 area del trapecio encima de la clave
PROMEDIO DE ALTURA DE ALTURAS ZANJA LIBRE
51.534 58.623 62.116 55.026 volumen de 15.168 relleno total 52.549 53.686 1256.983 50.386 15.764 volumen de 38.346 eliminacion 14.364 31.952 26.5433784 39.944 50.724 factor de 4.349 esponja 1.10 56.543 29.1977162 37.251 35.087 112.254 21.064 856.729
1.142 1.021 1.281
area del trapecio superior
1.200 1.302 1.352 1.250 1.200 1.250 1.275 1.225 1.400 1.200 1.325 1.200 1.200 1.400 1.400 1.337 1.525 1.600 1.952 2.060
0.700 0.802 0.852 0.750 0.700 0.750 0.775 0.725 0.900 0.700 0.825 0.700 0.700 0.900 0.900 0.837 1.025 1.100 1.452 1.560
VOLUMEN DE RELLENO NETO 49.541 56.725 60.263 53.080 13.184 50.597 51.753 48.414 13.561 36.357 12.243 29.964 37.955 48.799 2.055 54.651 26.366 24.702 84.778 12.992 767.979 1128.430
155.097
MAYOR
DEDE LA MAYOR
COTA TAPA 1 COTA TAPA 2 LONGITUD PENDIENTE LONGITUD INTERMEDIA COTA TAPA INTERMEDIA
MAYOR
pendiente ideal
pendiente hallada por diferencias de cotas
COTA FONDO 1 COTA FONDO 2 longitud 0.008 0.012 0.015 0.02 0.007 0.006 0.004
10.291 9.91 38.000 0.0100 40.665 9.883
19.975 63.5
19.42509
DATO DATO DATO CALCULO A DETERMINAR A DETERMNAR
19.975 19.42509 63.5
0.00866 8.66
MAYOR
DEDE LA MAYOR
COTA TAPA 1 COTA TAPA 2 LONGITUD PENDIENTE LONGITUD INTERMEDIA COTA TAPA INTERMEDIA
MAYOR
pendiente ideal
pendiente hallada por diferencias de cotas
COTA FONDO 1 COTA FONDO 2 longitud 0.008 0.012 0.015 0.02
20.067 17.959 49.001 0.0100 16.505 9.883
DATO DATO DATO CALCULO A DETERMINAR A DETERMNAR
10.491 9.91 3.5
0.166
calculo de lontitudes a por la mitad 2 100.6733 50.33665
3 0
S = Δh/L Δ
4 0
166
Concreto f´c 140 kg/cm2 1.76715 area de buzon 1.130976 0.636174 0.5089392 10.178784
cuerpo h=080 1.41372 base de buzon h=0.20 0.35343 tapa b. h=0.2 0.35343
descontar acero 10.178784 7.0686
concreto f´c 175
base de buzon h=0.2
oncreto f´c 175
nume cuerpo de altura de ro de media caña concreto 210 volumen buzon 140 buzon buzon 0.509 1.200 1 4.511 0.35343 0.509 1.200 2 espacio de la tapa de buzon 0.638 1.403 3 0.0565488 0.573 1.300 4 volumen neta de techo de buzon 0.509 1.200 5 0.2968812 5.937624 0.509 1.200 15 cantidad de acero que entra en techo de b 0.573 1.300 16 0.541 1.250 17 0.509 1.200 6 0.509 1.200 12 0.509 1.200 13 0.509 1.200 18 0.509 1.200 19 0.509 1.200 20 0.763 1.600 8 0.509 1.200 9 0.668 1.450 14 0.763 1.600 7 0.683 1.474 10 1.291 2.430 11 12.092 19.160
0.031416 area de tuber 1.130976 area de caña
0.0376992 0.1696464
0.125664
1.130976 4.523904 0.2261952 4.523904
o de buzon
0.753984 volumen que ocupa la tuberia 3.392928 4.146912 0.47124 0.062832 0.0125664
4.5113376
e entra en techo de buzon 1.76715 area de techo 0.35343 volumen de techo 0.282744 area de tapa 0.0565488 volumen de tapa 1.484406 area de techo - tapa 0.2968812 volumen de techo neta 5.937624 volumen total neta de techo
pa la tuberia
Qi=
determinar caudal, velocidades 0.0015 y tension tractiva Q=v x A V = Q /A tensión = So= n= radio hidraulico peso especific gravedad
0.11684222 0.013 1000 9.81
N° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
bz 1
bz 2 1 2 3 4 5 15 16 17 6 12 13 18 19 20 8 9 14 7 10 11 BZ EX
H BZ 1 2 3 4 5 6 16 17 6 7 13 14 19 20 8 9 10 7 8 11
H BZ 2 1.350 1.200 1.403 1.300 1.200 1.200 1.300 1.250 1.200 1.200 1.200 1.200 1.200 1.200 1.600 1.200 1.450 1.600 1.474 2.430
LONGITUD cota 1.200 63.500 1.403 63.500 1.300 63.500 1.200 63.500 1.200 18.000 1.300 60.600 1.250 60.000 1.200 60.000 1.600 14.700 1.200 47.000 1.450 14.500 1.200 39.000 1.200 49.000 1.600 49.000 1.200 3.500 1.474 58.700 1.600 26.700 1.600 23.500 2.430 58.700 1.690 8.000
tapa 1 21.003 21.175 20.870 19.744 17.372 20.100 18.606 16.463 15.690 17.783 16.486 12.218 12.010 11.657 11.707 11.110 13.936 13.025 10.914 11.400
area de tub 0.195 cota tapa 2 cot fondo 1 cot fond 2 pendiente 21.175 19.653 19.975 0.00507 20.870 19.975 19.467 0.00800 19.744 19.467 18.444 0.01611 17.372 18.444 16.172 0.03578 15.690 16.172 14.490 0.09344 18.606 18.900 17.306 0.02630 16.463 17.306 15.213 0.03488 15.690 15.213 14.490 0.01205 13.025 14.490 11.425 0.20850 16.486 16.583 15.286 0.02760 13.936 15.286 12.486 0.19310 12.010 11.018 10.810 0.00533 11.657 10.810 10.457 0.00720 11.707 10.457 10.107 0.00714 11.110 10.107 9.910 0.05629 10.914 9.910 9.440 0.00801 13.025 12.486 11.425 0.03974 11.707 11.425 10.107 0.05609 11.400 9.440 8.970 0.00801 10.000 8.970 8.310 0.08250