Page-15 XJ350 Workover Rig Operation and Maintenance Manual
Section II Technical parameters and performances 1. Technical parameters Servicing depth 2-7/8’’ tubing
4000m
Workover depth 2-7/8’’ drill pipe
3200m
Maximum hook load
900KN
Maximum lifting speed of hook
1.38m/s
Mast mode
Mast,
two
sections,
hydraulic raising/lowering and extending/retracting Mast clear height
31.7m
Max. hook load of mast
1020KN
Traveling system structure
4X3
Rope diameter
ĭ26mm
Draw works mode
Double
drum
with
MODEL
122
HYDROBRAKE The rated power of drawworks
350kW (476HP)
The lifting gear of draw works
5 forward 5 reverse
Maximum pulling force of fast line
180kN
Hydraulic system
Rated pressure MPa
14
Rated flow rate L/min
165
Oil tank capacity m3
1.0
Pressure MPa
0.833~0.93
Flow rate L/min
670
The capacity of main air cylinder
0.155
Air pressure system
Power transmission mode
Hydraulic mechanical
The rated power of engine HP/r/min
287kw/385HP/2100
Torque-converter mode
c/w
locking
hydraulic reducer
clutch,
Page-16 XJ350 Workover Rig Operation and Maintenance Manual Torque factors of transmission
2.08
Transmission
5 forward 1 reverse
Chassis mode
Special drilling rig chassis
Model of crown block
TC90
Max. static load
900KN
Driving mode
10×8
Steering mode
Hydraulic assist power
Steering axle
Front axles 1s,2nd axle
Driving axle
1st, 2nd, 3rd and 4th axle
Driven axle
5th axle
Maximum speed
km/h
63
Limited speed
km/h
45
Minimum turning radius
m
Operation
Maximum wind speed
environment
Temperature oC Relative humidity
Overall size m
Moving state
km/h
15 110 -19~50
%
95 18.7X3.1X4.28
(L×W×H) The weight of drilling rig Kg
46000
Page-17 XJ350 Workover Rig Operation and Maintenance Manual
2. Loading characteristics curve of hook Load characteristics curve of hook
䩽䋳㥋⡍ᗻ᳆㒓
1 gear hook load ḷ䩽䋳㥋 2 gear hook load 3 gear hook load ḷ䩽䋳㥋 4 gear hook load 5 gear hook load
ḷ䩽䋳㥋
䩽ᦤछ䋳㥋 kN
Lifting load of hook KN
ḷ䩽䋳㥋
ḷ䩽䋳㥋4
䩽ᦤछ䗳ᑺ m/s
Hook hoisting speed m/s
Page-18 XJ350 Workover Rig Operation and Maintenance Manual
II. Components section Section I Drawworks assembly Drawworks assembly has a double drum structure. Main drum is used to run drilling tool, lower casing and control bit pressure during drilling operations. I. Technical parameters List of technical parameters Model
JC-350
Type
Double drum
Rated power
350kW(476HP)
Technical parameters
Main drum (LEBUS
Sand drum
rope groove) Drum body
Brake rim
Diameter mm
ĭ429
ĭ324
Length mm
965
1016
Diameter mm
ĭ1070
ĭ1070
Width mm
310
210
Cooling method
Forced
Brake tape wrap angle
water
Pressure
spraying
circulation cooled
water cooled
345°
345°
Diameter, wire line
mm
ĭ26
ĭ14.5
Wire line capacity
m
500
3000
180 (2nd wrap)
115 (2nd wrap)
ATD-224H
ATD-124H
Pull of fast line Clutch
KN
(Pneumatic
push
disc) Auxiliary brake
MODEL HYDROBRAKE
(Pneumatic disc)
122
push