Shenzhen CLOU Electronics CO., LTD. CL730D22L Three phase CT connected meter Technical Specification CL730D22L - Smart
Views 109 Downloads 7 File size 2MB
Shenzhen CLOU Electronics CO., LTD.
CL730D22L Three phase CT connected meter Technical Specification
CL730D22L - Smart Energy Meter Technical Specification
Version
v03-11
Date
12st. July. 2017
Protection
All rights reserved
1
Shenzhen CLOU Electronics CO., LTD.
Revision History Date
Version
Author
Description of changes
2016-12-26
01-01
Ba Tao
First release
2017-01-03
01-02
Ba Tao
Update with IDIS feature
2017-03-10
03-01
Li Qiong
Update DLMS certificate to CTT3.0
2017-05-28
03-03
Ba Tao
Add the part of CL730D22L
2017-07-12
03-11
Qu Chong
Add default display list
CL730D22L - Smart Energy Meter Technical Specification
Affected Section
2
Shenzhen CLOU Electronics CO., LTD.
CONTENT Revision History ................................................................................................................................................ 2 1.
Abbreviations ....................................................................................................................................... 5
2.
General Introduction ......................................................................................................................... 7
3.
Standard and Certificate ................................................................................................................... 8 3.1.
Applicable standards.................................................................................................................. 8
3.2.
Function DLMS/COSEM .............................................................................................................. 8
3.3.
Approved certificate ................................................................................................................... 9
4.
Safety Information ........................................................................................................................... 10
5.
Technical Overview ......................................................................................................................... 11 5.1.
Electrical Parameters ............................................................................................................... 11
5.2.
Appearance .............................................................................................................................. 13
6.
Functional description ................................................................................................................... 14 6.1. Architecture ................................................................................................................................... 14 6.2. Metrology ...................................................................................................................................... 15 6.3. Demand and Maximum Demand .................................................................................................. 18 6.4. Real-Time Clock and Calendar ....................................................................................................... 21 6.5. Power off Operation ...................................................................................................................... 23 6.6. Profile / History Data ..................................................................................................................... 23 6.7. Firmware Upgrade......................................................................................................................... 26 6.8. (Dis-)Connection ............................................................................................................................ 26 6.9. Load Control .................................................................................................................................. 27 6.10. Anti-tamper ................................................................................................................................. 28 6.11. Event Log ..................................................................................................................................... 28 6.12. Security ........................................................................................................................................ 35 6.13. Push ............................................................................................................................................. 36 6.14. Meter registration using data notification .................................................................................. 38 6.15. Meter work mode ........................................................................................................................ 38
7.
Communication and Auxiliary Interface .................................................................................. 39 7.1.
Communication Interface......................................................................................................... 39
7.2.
Auxiliary Contact ...................................................................................................................... 40
7.3.
Optical port .............................................................................................................................. 40
7.4.
RS485 port................................................................................................................................ 40
7.5.
Interface for Remote Communication ...................................................................................... 40
7.6.
PLC interface ............................................................................................................................ 41
8.
9.
User Interface .................................................................................................................................... 42 8.1.
LCD display ............................................................................................................................... 42
8.2.
LED ........................................................................................................................................... 45
8.3.
Button ...................................................................................................................................... 46 Installation ......................................................................................................................................... 47
9.1. General Information ...................................................................................................................... 47 9.2. Meter Dimensions.......................................................................................................................... 47 9.3. Meter Fixings ................................................................................................................................. 47
CL730D22L - Smart Energy Meter Technical Specification
3
Shenzhen CLOU Electronics CO., LTD. 9.4. Meter Cabling ................................................................................................................................ 48 9.5. Meter Materials............................................................................................................................. 49 9.6. Dimensions of NIC box ................................................................................................................... 49 9.7. Tools and Materials Required ........................................................................................................ 49 9.8. Installation Checks ......................................................................................................................... 50 9.9. Cautions on Installation ................................................................................................................. 50 9.10. Battery Replacement ................................................................................................................... 50 9.11. Meter Sealing .............................................................................................................................. 51 9.12. Nameplate and barcode .............................................................................................................. 51 10.
Transport and Storage.................................................................................................................... 52
11.
Warranty ............................................................................................................................................. 52
12.
Meter Onsite Maintenance ............................................................................................................ 53
12.1. Meter trouble shooting................................................................................................................ 53 ANNEX 1 –Default setting for Display List.............................................................................................. 54
CL730D22L - Smart Energy Meter Technical Specification
4
Shenzhen CLOU Electronics CO., LTD.
1. Abbreviations Abbreviations
Explanation
AC
Alternating Current
ADC
Analogue to Digital Converter
AMI
Advanced Metering Infrastructure
ANSI
American National Standards Institute
AOI
Automated Optical Inspection. Automated process for inspection of assembled boards acc. to IPC criteria.
CE
European Conformity (Logo)
COSEM
Companion Specification for Energy Metering
CT
Current Transformer
DC
Direct Connection
DLMS
Device Language Message Specification
DST
Daylight Savings Time
EMC
Electro-Magnetic Compatibility
ESD
Electro Static Discharge, risk of damage for electronic components has to be minimized.
FIFO
First in First out
FMEA
Failure Mode and Effects Analysis. Quality management method for evaluation of potential failure and defining countermeasures.
GMT
Greenwich Mean Time
HHU
Hand-Held Unit
Ib
Basic current (for meter of Direct connection)
IHD
In-Home Display device
In
Nominal current / Rated current(for meter Connection through current transformer)
Ist
Starting current
MD
Maximum demand
MID
Measurement Instruments Directive (European Union)
MTBF
Mean Time Between Failure
NIC
Network Interface Card. Communication module, GPRS/3G/4GPLC/RF
NVM
Non-Volatile Memory
OBIS
Object Identification System
PCB
Printed Circuit Board
RTC
Real-Time Clock
SMT
Surface Mount Technology. Method of connecting components to the surface of printed circuit boards (PCB).
THT
Through Hole Technology. Method of connecting components by inserting the wire leads into metalized holes in the PCB.
TOU
Time-Of-Use
Un
Nominal voltage, Reference voltage
UTC
Coordinated Universal Time
CL730D22L - Smart Energy Meter Technical Specification
5
Shenzhen CLOU Electronics CO., LTD. VT
Voltage Transformer
WEEE
Waste Electrical and Electronic Equipment Directive (European Union)
SPC
Statistical process control, use of statistical methods to optimize production and service processes.
CL730D22L - Smart Energy Meter Technical Specification
6
Shenzhen CLOU Electronics CO., LTD.
2. General Introduction The CL730D22L three-phase CT operated smart energy meter is the latest developed products in CLOU's meter series. It is certificated with MID and DLMS/COSEM, it provides an excellent and stable accuracy and performance. The meter is equipped with a plug-and-play communication module such as PLC/RF/Cellular for AMI integration, so all the operations can be done remotely from the central server, including meter billing/configuration/alarm events upload etc. It keeps records of different tampers which can be configured to switch off the load supply when the tamper occurs. The CL730D22L meter provides TOU multi-tariffs, neutral current and maximum demand measurement. The meter is equipped with communications ports to support AMI applications, in accordance with the DLMS/COSEM standard. It is able to equip with an integrated relay enables the remote connection and disconnection of the external relay. The meter’s application software can be upgraded via local or remote communications. The meters are designed to conform to the latest standards and requirements of electricity utilities, providing a strong foundation for Smart Grid initiatives.
Figure 1.1 CL730D22L appearance
CL730D22L - Smart Energy Meter Technical Specification
7
Shenzhen CLOU Electronics CO., LTD.
3. Standard and Certificate 3.1. Applicable standards The CL730D22L smart meter complies with the following standards and regulations. IEC62052-11 Electricity metering equipment (AC) - General requirements, tests and test conditions, part 11: Metering equipment (equivalent to EN 50470-1) IEC62053-21 Electricity metering equipment(AC) - Particular requirements, part 21: Static meters for active energy (classes 1 and 2) (equivalent to EN 50470-3) IEC62053-22 Electricity metering equipment(AC) - Particular requirements, part 22: Static meters for active energy (classes 0.2 S and 0.5 S) (equivalent to EN 50470-3) IEC62053-23 Electricity metering equipment(AC) - Particular requirements, part 23: Static meters for reactive energy (classes 2 and 3) IEC62055-31 Electricity metering - Payment systems - Particular requirements – Static payment meters for active energy (classes 1 and 2) EN50470-1 Electricity metering equipment (A.C.) - Part 1: General requirements, tests and test conditions - Metering equipment (class indexes A, B and C) EN50470-3 Electricity metering equipment (A.C.) - Part 3: Particular requirements - Static meters for active energy (class indexes A, B and C) WELMEC 7.2 Software Guide (Measuring Instruments Directive 2014/32/EC)
3.2. Function DLMS/COSEM IEC62056-21 Electricity Metering – Data exchange for meter reading, tariff and load control Direct local data exchange (supersedes IEC61107) IEC62056-42 Electricity Metering – Data exchange for meter reading, tariff and load control, part 42: Physical layer services and procedures for connection-oriented asynchronous data exchange IEC62056-46 Electricity Metering – Data exchange for meter reading, tariff and load control, part 46: Data link layer using HDLC protocol IEC62056-47 Electricity Metering – Data exchange for meter reading, tariff and load control, part 47: COSEM transport layers for IPv4 networks IEC62056-53 Electricity Metering – Data exchange for meter reading, tariff and load control, part 53: COSEM Application layer IEC62056-61 Electricity Metering – Data exchange for meter reading, tariff and load control, part 61: Object identification system (OBIS) IEC62056-62 Electricity Metering – Data exchange for meter reading, tariff and load control, part 62: Interface classes
CL730D22L - Smart Energy Meter Technical Specification
8
Shenzhen CLOU Electronics CO., LTD.
3.3. Approved certificate
Certificate of CL730D22L
CL730D22L - Smart Energy Meter Technical Specification
9
Shenzhen CLOU Electronics CO., LTD.
4. Safety Information Meters shall be installed and maintained only by suitably-qualified personnel. The operator must read the following safety advice when performing installation or service work on meters. This technical manual is written for meter installers and for service departments of utilities. The End-user gets a quick reference guide, packed with each meter. In each chapter of this manual, various letter symbols and graphic symbols which are adopted to express danger according to different levels of danger will be explained. Please pay attention!
Warning!
Attention!
This sign is to remind of possible danger, which will possibly cause some sever hurt and damage to people and the equipment. This sign is to remind of possible unexpected situation, which might result in personal injury, equipment damage and data error.
Pay attention to product measured load capacity. Correct and reliable installation and connection. Pay attention to effective cross-sectional area of wire connection. Don’t touch bare wire or use bare wire to connect. Don’t use product in an explosive environment. Keep product surface clean. Don’t immerse meter with water and any chemical substance or use chemical substance to clean meter. Displays in the manual are all examples, which may have some difference from the real data in meters. Since it’s life-threatening to touch live components, power must be cut off before installation and replacement. Please obey local rules. Installation and replacing of meter only could be done by qualified person with specified technology. When installing meter, pay attention to meter’s safety. Meters that have appearance damaged or ever fallen down are not allowed to install. Washing meter with water are not allowed. The CLOU Standard applies to production and test in CLOU Electronics, not the standard for client test or acceptance. Only IEC standards apply to the client inspection and acceptance. Before installing or removing a meter, or removing the terminal cover for any reason, insulate the meter from the mains power supply. Always disconnect all measurement and auxiliary circuit connections from the meter before attempting to open the meter housing.
CL730D22L - Smart Energy Meter Technical Specification
10
Shenzhen CLOU Electronics CO., LTD.
5. Technical Overview The CL730D22L are both advanced bi-directional, 4-quadrant, multi-functional, static three phase revenue meter that is designed for residential and small commercial consumers. It contains the following main features. Active/reactive energy and demand measurement RTC and calendar management 4 tariff (TOU/TOD, Tier) Remote (dis-)connection with built in relay Event log / Alarm Tamper detection Remote firmware update Optical / RS485 for local communication Modularized design for remote communication of PLC/RF/Cellular
5.1. Electrical Parameters Table 5.1 Electrical characteristic Technical
CL730D22L
Connection wiring
3P4W L1L1-L2L2-L3L3-NN
Nominal voltage
110V ~ 230
Operating voltage range
80% ~ 120% Un
Basic current
1A or 5A
Operating current range
0.05 - 1(10)A or 0.25 - 5(6)A
Starting current
0.1‰Ib / 1mA
Frequency
50 Hz ± 5%
Accuracy kWh / kVarh
Class 0.5S / Class 2(IEC) Class C(MID)
Pulse constant
10000 imp/kWh; 10000 imp/kVarh
Power consumption voltage circuit