Presupuesto de Planta de Alimentos Balanceados

Excabacion A B 1.45 0.7 1 5.4 2.73 2 0.3 0.3 0.3 0.3 Muros de contencion A 1 2 3 h 1.45 0.7 1 4.2 2.1 14.01 7.4 5.19

Views 50 Downloads 0 File size 80KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Excabacion A

B 1.45 0.7 1 5.4 2.73 2 0.3 0.3 0.3 0.3

Muros de contencion A 1 2 3

h 1.45 0.7 1 4.2 2.1 14.01 7.4 5.19 4.14 5.5

B 5.4 14.02 2.73 0.3 0.3 0.3 0.3

V 2.2 2.2 2.2 5.32 6.63 2.25 0.5 0.5 0.5 0.5

h 4.2 2 2 7.4 5.19 4.14 5.5

A

26 9 5 1 1 1 1 1 1 1

120.263 9.702 11 120.6576 38.00979 63.045 1.11 0.7785 0.621 0.825 366.01189

54.665 4.41 5 22.68 5.733 28.02 2.22 1.557 1.242 1.65 127.177

0.2 0.2 0.2 0.15 0.15 0.15 0.15

24.6192 20.026 13.63596 1.488 1.05705 0.8523 1.1175 62.79601

123.096 100.13 68.1798 9.92 7.047 5.682 7.45 321.5048

t 5.23 2.25 6.63 0.5 0.5 0.5 0.5

Cimentaciones A 1 2 3

B 1.45 0.7 1

h 1.45 0.7 1

cantidad 0.7 0.4 0.45

26 9 5

38.2655 1.764 2.25 42.2795

2.2 2.2 2.2

26 9 5

11.583 4.0095 2.2275 17.82

0.2

74.0896

370.448

Columnas A 1 2 3

B 0.45 0.45 0.45

h 0.45 0.45 0.45

cantidad

Losas A

B 20.8

t 17.81

Columna Viga Viga Viga

W8x24 W6x9 W12x22 W8x18

13.074 2.6 2.6 2.6

27 102 10 68

Columnas Vigas Vigas Vigas Escaleras Columnas

HSS75x75x3mm HSS75x75x3mm HSS75x75x3mm HSS50x50x2.5mm HSS150x150x3mm HSS150x150x4

13.074 2.6 2.1 2.1 5.4 13.74

7 49 9 14 10 2

6.6 6.6 6.6 3.6 8.96 18.01

Columnas Vigas C Superio C Lateral

HSS150x150x4 W10x12 HSS150x50x2.5mm HSS150x150x3mm

7.93 5.76 20.83 20.83

5 10 8 3

18.01 714.0965 25.3 1457.28 7.73 1288.1272 13.67 854.2383 4313.742

0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 774.99753 774.99753 1588.88553 1588.88553

A SILO 01 SILO 02 SILO 03 SILO 04 SILO 05 SILO 06 SILO 07 SILO 08 SILO 09 SILO 10 SILO 11 SILO 12 SILO 13 SILO 14

h 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4

35.72 12609.0886 17.87 4739.124 38.69 1005.94 26.79 4736.472 23090.6246

t 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 2.4 2.4 6 6

Plancha estriada A

B 20.82 5.3 2.2 5.3 2.2 15.84

604.0188 840.84 124.74 105.84 483.84 494.9148 2654.1936

t 7.75 5.3 18.29 5.3 18.29 5.3

0.002 2533.2735 0.002 441.013 0.002 631.7366 0.002 441.013 0.002 631.7366 0.002 1318.0464

2.2 20.82

18.29 7.75

0.002 631.7366 0.002 2533.2735 9161.8292

A

B 0.32 0.25 0.25 0.1 0.133 0.165

t 0.32 0.25 0.25 0.15 0.207 0.31

0.022225 0.012 0.012 0.009 0.009 0.009

27 482.364288 9 52.9875 5 29.4375 204 216.189 136 264.52886 20 72.27495 1117.7821

24 18 24 36 102

16 12 16 24 68

Presupuesto Proyecto Sub Presupuesto Cliente Ubicacion Item Descripción

01.01

UnidadMetrado Precio

Costo a : Parcial

Jan-17 Subtotal

OBRAS PROVISIONALES

01.01.01

CAMPAMENTO PROVISIONAL DE LA OBRA

GLB

1.00

01.01.02

GUARDIANIA

MES

5.00 1,250.00

6,250.00

01.01.03

AGUA PARA LA CONSTRUCCION

GLB

1.00 2,000.00

2,000.00

01.01.04

SERVICIOS HIGIENICOS

GLB

1.00 5,000.00

5,000.00

Total

S/.

28,250.00

S/.

3,041.50

S/.

60,000.00

### 15,000.00

01.02 01.02.01

TRABAJOS PRELIMINARES

-

TRAZO Y REPLANTEO PRELIMINAR

M2

550.00

5.53

3,041.50 -

01.03

FLETE TERRESTRE

-

01.03.01

FLETE TERRESTRE ALMACEN CENTRAL A ALMACEN DE OBRA

GLB

1.00

### 40,000.00

01.03.02

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO

GLB

1.00

### 20,000.00

01.04 01.04.01

ESTRUCTURAS DE CONCRETO

S/. 182,334.91

ESTRUCTURAS DE CIMENTACION

01.04.01.01

131,703.97

MOVIMIENTO DE TIERRAS

16,409.64

01.04.01.01.02

EXCAVACION PARA CIMIENTOS Y ZAPATAS

M3

367.00

01.04.01.01.03

ACARREO INTERNO, MATERIAL PROCEDENTE DE EX

M3

91.22

20.35

1,856.33

01.04.01.01.04

ELIMINACION MATERIAL EXCEDENTE C/MAQUINA

M3

91.22

19.17

1,748.69

01.04.01.02

34.89 12,804.63

OBRAS DE CONCRETO SIMPLE

01.04.01.02.01

59,974.91

SOLADOS

04.01.02.01.01.

2,576.64

SOLADO PARA ESTRUCTURAS DE CONCRETO

M2

128.00

01.04.01.02.02.

CONCRETO EN MURO DE CONTENCION M3

62.79

422.58 26,533.80

01.04.01.02.02.

ENCOFRADO Y DESENCOFRADO PARA

M2

322.00

42.36 13,639.92

04.01.02.02.01.

ACERO CORRUGADO fy=4200 kg/cm2

kg

4,520.88

3.81 17,224.55

01.04.01.02.02

20.13

MUROS DE CONTENCION

01.04.01.03

-

OBRAS DE CONCRETO ARMADO

01.04.01.03.01

ZAPATAS

01.04.01.03.01. 01.04.01.03.01. 01.04.01.03.02

2,576.64

-

36,470.65

-

17,621.88

ZAPATAS, CONCRETO F'C=175 KG/CM2

M3

42.28

280.79 11,871.80

ZAPATAS, ACERO fy=4200 kg/cm2

KG

1,352.96

4.25

5,750.08

17.28

417.91

7,221.48

COLUMNAS Y PLACAS

-

01.04.01.03.02.

COLUMNAS, CONCRETO 210 KG/CM2

M3

01.04.01.03.02.

COLUMNAS, ENCOFRADO Y DESENCOFRADO

M2

72.00

57.45

4,136.40

01.04.01.03.02.

COLUMNAS, ACERO fy=4200 kg/cm2

KG

1,762.56

4.25

7,490.88

01.04.02

PAVIMENTO RIGIDO

01.04.02.01

-

MOVIMIENTO DE TIERRAS

01.04.02.01.01

-

PERFILADO Y COMPACTADO DE SUB-RASANTE M2

01.04.02.02 01.04.02.02.01

370.00

4.63

-

48,917.85

TIPO I

-

48,917.85

M3

74.08

436.58 32,341.85

01.04.02.02.01.

PAVIMENTO RIGIDO: ENCOFRADO Y D

M2

370.00

43.23 15,995.10

01.04.02.02.01.

CURADO LOSA DE CONCRETO

M2

370.00

580.90 S/. 824,369.94

ESTRUCTURAS DE SOPORTE

436,590.00

ESTRUCTURAS DE PLANTA DE PRODUCCION

02.01.01.01

ESTRUCTURAS METALICAS

02.01.02

323,260.00 KG

###

14.00

ESTRUCTURAS DE ESCALERAS Y PASILLOS

02.01.02.01

ESTRUCTURAS METALICAS

02.01.03

ESTRUCTURAS METALICAS

02.01.03

KG

2,331.00

14.00 32,634.00 -

KG

4,314.00

14.00 60,396.00

COBERTURA DE TECHO

02.01.03.01

PLANCHA DE ALUZING TR3 0.3.5mm

02.01.04

m2

240.00

50.00 12,000.00

COBERTURA LATERAL

02.01.04.01

PLANCHA DE ALUZING TR4 0.3.5mm

### -

ESTRUCTURAS DE TECHO DE RECEPCION

02.01.03.01

02.02.01

1.57

ESTRUCTURAS METALICAS

02.01.01

02.02

1,713.10

PAVIMENTO RIGIDO CONCRETO F'C= 280 kg/cm2 PARA PA

02.01

50,630.95

1,713.10

01.04.02.02.01.

02

18,848.76

-

PERFILADO Y COMPACTACION DE SUB RASANTE

01.04.02.01.01.

57,398.27

m2

166.00

SILOS

50.00

8,300.00 -

ESTRUCTURAS METALICAS SILO 01

KG

1,317.59

12.00 15,811.07

32,634.00 60,396.00 12,000.00 8,300.00 240,499.94

02.02.02

ESTRUCTURAS METALICAS SILO 02

KG

1,317.59

12.00 15,811.07

02.02.03

ESTRUCTURAS METALICAS SILO 03

KG

1,317.59

12.00 15,811.07

02.02.04

ESTRUCTURAS METALICAS SILO 04

KG

1,317.59

12.00 15,811.07

02.02.05

ESTRUCTURAS METALICAS SILO 05

KG

1,317.59

12.00 15,811.07

02.02.06

ESTRUCTURAS METALICAS SILO 06

KG

1,317.59

12.00 15,811.07

02.02.07

ESTRUCTURAS METALICAS SILO 07

KG

1,317.59

12.00 15,811.07

02.02.08

ESTRUCTURAS METALICAS SILO 08

KG

1,317.59

12.00 15,811.07

02.02.09

ESTRUCTURAS METALICAS SILO 09

KG

1,317.59

12.00 15,811.07

02.02.10

ESTRUCTURAS METALICAS SILO 10

KG

1,317.59

12.00 15,811.07

02.02.11

ESTRUCTURAS METALICAS SILO 11

KG

775.00

12.00

9,299.97

02.02.12

ESTRUCTURAS METALICAS SILO 12

KG

775.00

12.00

9,299.97

02.02.13

ESTRUCTURAS METALICAS SILO 13

KG

1,588.89

12.00 19,066.63

02.02.14

ESTRUCTURAS METALICAS SILO 14

KG

1,588.89

12.00 19,066.63

02.02.15

ESTRUCTURAS METALICAS TOLVA BASCULA

KG

1,354.00

12.00 16,248.00

02.02.16

ESTRUCTURAS METALICAS TOLVA PULMON

KG

784.00

KG

1,125.00

14.00 15,750.00

PLANCHA ESTRIADA DE PISOS e=2.5mm

KG

9,161.00

14.00

###

ESTRUCTURAS DE PARRILLA

KG

117.00

28.00

3,276.00

BARANDAS DE PLATAFORMAS

KG

02.03 02.03.01 02.04

PLANCHA ESTRIADA USADA EN PISOS

02.06.01 03 03.01 0.01.01 03.02

128,254.00

CARTELAS

02.05.01 02.06

9,408.00 15,750.00

ESTRUCTURAS DE PARRILLA

02.04.01 02.05

12.00

PARRILLA DE POZA DE DECARGA

3,276.00

BARANDAS

-

28.00

-

INSTALACIONES ELECTRICAS

S/.

TABLERO DE CONTROL TABLERO DE FUERZA

UNID. 5,086.00

1

5,086.00

CONDUCTORES

-

03.02.01

CABLE ELECTRICO N2XOH 3-1X4MM2

m

993.00

3.87

3,842.91

03.02.02

CABLE ELECTRICO N2XOH 3-1X35MM2

m

32.00

17.07

546.24

03.02.03

CABLE ELECTRICO N2XOH 3-1X50MM2

m

32.00

20.72

663.04

03.02.04

CABLE DESNUDO Cu DE 16mm2

m

10.00

3.29

32.90

m

1,067.00

35.75

03.03 03.03.01 03.04 03.04.01 03.04.02 0.05 03.05.01 04 04.01 04.01.01 04.02

TUBERIA CONDUID TUBERIA CONDUID 40 mm

-

BANDEJAS

unid.

100.00

68.14

6,814.00

ACCESORIOS

unid.

16.00

181.39

2,902.24

unid.

1.00

2800

2,800.00

PUESTA A TIERRA

-

EQUIPAMIENTO INDUSTRIAL

2,800.00

-

MONTAGE MONTAJE DE EQUIPOS DE PRODUCCION

38,145.25

###

BANDEJAS ELECTRICAS

PUESTA A TIERRA

46,031.25

5,086.00

GLOB

1.00

170592

### ###

EQUIPOS DE PRODUCCION

-

04.02.01

SILO DE GRANOS 500 TN+ BARREDORA

UNID.

04.02.02

ELEVADOR DE CANGILONES 20m

UNID.

1.00 69961.3 3.00 58172.4

04.02.03

TORNILLO SINFÍN 14m

UNID.

2.00

28743

04.02.04

COMPUERTA NEUMATICA

UNID.

2.00

3946.8

04.02.05

VALVULA REBATIBLE

UNID.

4.00

3946.8

###

04.02.06

INDICADOR DE NIEVEL MOTORIZADO

UNID.

12.00

1587.3

###

04.02.07

INDICADOR DE NIVEL CAPACITIVO

UNID.

14.00

1587.3

###

04.02.08

BASCULA DOSIFICADORA 1000 L

UNID.

1.00

36894

###

04.02.09

TORNILLO SINFÍN 6m

UNID.

10.00

12012

###

04.02.10

ALIMENTADOR DE MOLINO DE MARTILLOS 1m3

UNID.

1.00

26598

###

04.02.11

MOLINO DE MARTILLOS 75kW

UNID.

1.00

97812

###

04.02.12

MEZCLADOR HORIZONTAL POR BACTCHES

UNID.

1.00

215015

04.02.13

TOLVA DESCARGA DE MEZCLADOR

UNID.

1.00

4676.1

04.02.14

PRENZA PELLETS 75kW + ALIMENTADOR

UNID.

1.00

337194

###

04.02.15

ENDRIADORA DE PELLETS

UNID.

1.00

81081

###

04.02.16

CLICLON

UNID.

1.00

23595

###

04.02.17

VENTILADOR CENTRIFUGO

UNID.

1.00

26598

###

04.02.18

DESMENUZADORA + ALIMENTADOR

UNID.

###

04.02.19

TORNILLO SINFÍN 2m

UNID.

1.00 86872.5 2.00 9438

04.02.20

TAMIZ VIBRATORIO

UNID.

1.00

45474

04.02.21

VALVULA 2 VIAS

UNID.

1.00

3946.8

04.02.22

BALANZA ENSECADORA

UNID.

2.00

53625

04.02.23

CORREA DE COSTURA Y COLUMNA

UNID.

2.00

39468

04.02.24

MAQUINA DE COSER MOVIL

UNID.

2.00

4933.5

04.02.25

COMPRESOR DE 10HP Q 1150L, 7.5bar + INSTALAC UNID.

1.00

18200

### ### 7,893.60

### 4,676.10

### ### 3,946.80 ### ### 9,867.00 ###

### 170,592.03 ###

04.02.26

CALDERA DE VAPOR 1500KG/H 8 bar

04.03

UNID.

1.00

0

AUTOMATIZACION DE EQUIPOS

-

04.03.01

PANEL DE CONTROL ELECTRICO

UNID.

1.00

39200

04.03.02

SISTEMA DE CONTRON BACHING + CABLEADO

UNID.

1.00

19040

04.03.03

PLC PARA ALIEMENTADOR DE MOLINO MARTILLOS

UNID.

1.00

3900

### 3,900.00

COSTO DIRECTO GASTOS GENERALES UTILIDAD

### 12 %

S/. 369,921.59

5%

S/. 154,134.00

18 %

S/. 649,212.40

SUB TOTAL IGV. PRESUPUESTO TOTAL

62,140.00

###

###

###