Excabacion A B 1.45 0.7 1 5.4 2.73 2 0.3 0.3 0.3 0.3 Muros de contencion A 1 2 3 h 1.45 0.7 1 4.2 2.1 14.01 7.4 5.19
Views 50 Downloads 0 File size 80KB
Excabacion A
B 1.45 0.7 1 5.4 2.73 2 0.3 0.3 0.3 0.3
Muros de contencion A 1 2 3
h 1.45 0.7 1 4.2 2.1 14.01 7.4 5.19 4.14 5.5
B 5.4 14.02 2.73 0.3 0.3 0.3 0.3
V 2.2 2.2 2.2 5.32 6.63 2.25 0.5 0.5 0.5 0.5
h 4.2 2 2 7.4 5.19 4.14 5.5
A
26 9 5 1 1 1 1 1 1 1
120.263 9.702 11 120.6576 38.00979 63.045 1.11 0.7785 0.621 0.825 366.01189
54.665 4.41 5 22.68 5.733 28.02 2.22 1.557 1.242 1.65 127.177
0.2 0.2 0.2 0.15 0.15 0.15 0.15
24.6192 20.026 13.63596 1.488 1.05705 0.8523 1.1175 62.79601
123.096 100.13 68.1798 9.92 7.047 5.682 7.45 321.5048
t 5.23 2.25 6.63 0.5 0.5 0.5 0.5
Cimentaciones A 1 2 3
B 1.45 0.7 1
h 1.45 0.7 1
cantidad 0.7 0.4 0.45
26 9 5
38.2655 1.764 2.25 42.2795
2.2 2.2 2.2
26 9 5
11.583 4.0095 2.2275 17.82
0.2
74.0896
370.448
Columnas A 1 2 3
B 0.45 0.45 0.45
h 0.45 0.45 0.45
cantidad
Losas A
B 20.8
t 17.81
Columna Viga Viga Viga
W8x24 W6x9 W12x22 W8x18
13.074 2.6 2.6 2.6
27 102 10 68
Columnas Vigas Vigas Vigas Escaleras Columnas
HSS75x75x3mm HSS75x75x3mm HSS75x75x3mm HSS50x50x2.5mm HSS150x150x3mm HSS150x150x4
13.074 2.6 2.1 2.1 5.4 13.74
7 49 9 14 10 2
6.6 6.6 6.6 3.6 8.96 18.01
Columnas Vigas C Superio C Lateral
HSS150x150x4 W10x12 HSS150x50x2.5mm HSS150x150x3mm
7.93 5.76 20.83 20.83
5 10 8 3
18.01 714.0965 25.3 1457.28 7.73 1288.1272 13.67 854.2383 4313.742
0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 1317.58953 774.99753 774.99753 1588.88553 1588.88553
A SILO 01 SILO 02 SILO 03 SILO 04 SILO 05 SILO 06 SILO 07 SILO 08 SILO 09 SILO 10 SILO 11 SILO 12 SILO 13 SILO 14
h 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4
35.72 12609.0886 17.87 4739.124 38.69 1005.94 26.79 4736.472 23090.6246
t 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 2.4 2.4 6 6
Plancha estriada A
B 20.82 5.3 2.2 5.3 2.2 15.84
604.0188 840.84 124.74 105.84 483.84 494.9148 2654.1936
t 7.75 5.3 18.29 5.3 18.29 5.3
0.002 2533.2735 0.002 441.013 0.002 631.7366 0.002 441.013 0.002 631.7366 0.002 1318.0464
2.2 20.82
18.29 7.75
0.002 631.7366 0.002 2533.2735 9161.8292
A
B 0.32 0.25 0.25 0.1 0.133 0.165
t 0.32 0.25 0.25 0.15 0.207 0.31
0.022225 0.012 0.012 0.009 0.009 0.009
27 482.364288 9 52.9875 5 29.4375 204 216.189 136 264.52886 20 72.27495 1117.7821
24 18 24 36 102
16 12 16 24 68
Presupuesto Proyecto Sub Presupuesto Cliente Ubicacion Item Descripción
01.01
UnidadMetrado Precio
Costo a : Parcial
Jan-17 Subtotal
OBRAS PROVISIONALES
01.01.01
CAMPAMENTO PROVISIONAL DE LA OBRA
GLB
1.00
01.01.02
GUARDIANIA
MES
5.00 1,250.00
6,250.00
01.01.03
AGUA PARA LA CONSTRUCCION
GLB
1.00 2,000.00
2,000.00
01.01.04
SERVICIOS HIGIENICOS
GLB
1.00 5,000.00
5,000.00
Total
S/.
28,250.00
S/.
3,041.50
S/.
60,000.00
### 15,000.00
01.02 01.02.01
TRABAJOS PRELIMINARES
-
TRAZO Y REPLANTEO PRELIMINAR
M2
550.00
5.53
3,041.50 -
01.03
FLETE TERRESTRE
-
01.03.01
FLETE TERRESTRE ALMACEN CENTRAL A ALMACEN DE OBRA
GLB
1.00
### 40,000.00
01.03.02
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
GLB
1.00
### 20,000.00
01.04 01.04.01
ESTRUCTURAS DE CONCRETO
S/. 182,334.91
ESTRUCTURAS DE CIMENTACION
01.04.01.01
131,703.97
MOVIMIENTO DE TIERRAS
16,409.64
01.04.01.01.02
EXCAVACION PARA CIMIENTOS Y ZAPATAS
M3
367.00
01.04.01.01.03
ACARREO INTERNO, MATERIAL PROCEDENTE DE EX
M3
91.22
20.35
1,856.33
01.04.01.01.04
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA
M3
91.22
19.17
1,748.69
01.04.01.02
34.89 12,804.63
OBRAS DE CONCRETO SIMPLE
01.04.01.02.01
59,974.91
SOLADOS
04.01.02.01.01.
2,576.64
SOLADO PARA ESTRUCTURAS DE CONCRETO
M2
128.00
01.04.01.02.02.
CONCRETO EN MURO DE CONTENCION M3
62.79
422.58 26,533.80
01.04.01.02.02.
ENCOFRADO Y DESENCOFRADO PARA
M2
322.00
42.36 13,639.92
04.01.02.02.01.
ACERO CORRUGADO fy=4200 kg/cm2
kg
4,520.88
3.81 17,224.55
01.04.01.02.02
20.13
MUROS DE CONTENCION
01.04.01.03
-
OBRAS DE CONCRETO ARMADO
01.04.01.03.01
ZAPATAS
01.04.01.03.01. 01.04.01.03.01. 01.04.01.03.02
2,576.64
-
36,470.65
-
17,621.88
ZAPATAS, CONCRETO F'C=175 KG/CM2
M3
42.28
280.79 11,871.80
ZAPATAS, ACERO fy=4200 kg/cm2
KG
1,352.96
4.25
5,750.08
17.28
417.91
7,221.48
COLUMNAS Y PLACAS
-
01.04.01.03.02.
COLUMNAS, CONCRETO 210 KG/CM2
M3
01.04.01.03.02.
COLUMNAS, ENCOFRADO Y DESENCOFRADO
M2
72.00
57.45
4,136.40
01.04.01.03.02.
COLUMNAS, ACERO fy=4200 kg/cm2
KG
1,762.56
4.25
7,490.88
01.04.02
PAVIMENTO RIGIDO
01.04.02.01
-
MOVIMIENTO DE TIERRAS
01.04.02.01.01
-
PERFILADO Y COMPACTADO DE SUB-RASANTE M2
01.04.02.02 01.04.02.02.01
370.00
4.63
-
48,917.85
TIPO I
-
48,917.85
M3
74.08
436.58 32,341.85
01.04.02.02.01.
PAVIMENTO RIGIDO: ENCOFRADO Y D
M2
370.00
43.23 15,995.10
01.04.02.02.01.
CURADO LOSA DE CONCRETO
M2
370.00
580.90 S/. 824,369.94
ESTRUCTURAS DE SOPORTE
436,590.00
ESTRUCTURAS DE PLANTA DE PRODUCCION
02.01.01.01
ESTRUCTURAS METALICAS
02.01.02
323,260.00 KG
###
14.00
ESTRUCTURAS DE ESCALERAS Y PASILLOS
02.01.02.01
ESTRUCTURAS METALICAS
02.01.03
ESTRUCTURAS METALICAS
02.01.03
KG
2,331.00
14.00 32,634.00 -
KG
4,314.00
14.00 60,396.00
COBERTURA DE TECHO
02.01.03.01
PLANCHA DE ALUZING TR3 0.3.5mm
02.01.04
m2
240.00
50.00 12,000.00
COBERTURA LATERAL
02.01.04.01
PLANCHA DE ALUZING TR4 0.3.5mm
### -
ESTRUCTURAS DE TECHO DE RECEPCION
02.01.03.01
02.02.01
1.57
ESTRUCTURAS METALICAS
02.01.01
02.02
1,713.10
PAVIMENTO RIGIDO CONCRETO F'C= 280 kg/cm2 PARA PA
02.01
50,630.95
1,713.10
01.04.02.02.01.
02
18,848.76
-
PERFILADO Y COMPACTACION DE SUB RASANTE
01.04.02.01.01.
57,398.27
m2
166.00
SILOS
50.00
8,300.00 -
ESTRUCTURAS METALICAS SILO 01
KG
1,317.59
12.00 15,811.07
32,634.00 60,396.00 12,000.00 8,300.00 240,499.94
02.02.02
ESTRUCTURAS METALICAS SILO 02
KG
1,317.59
12.00 15,811.07
02.02.03
ESTRUCTURAS METALICAS SILO 03
KG
1,317.59
12.00 15,811.07
02.02.04
ESTRUCTURAS METALICAS SILO 04
KG
1,317.59
12.00 15,811.07
02.02.05
ESTRUCTURAS METALICAS SILO 05
KG
1,317.59
12.00 15,811.07
02.02.06
ESTRUCTURAS METALICAS SILO 06
KG
1,317.59
12.00 15,811.07
02.02.07
ESTRUCTURAS METALICAS SILO 07
KG
1,317.59
12.00 15,811.07
02.02.08
ESTRUCTURAS METALICAS SILO 08
KG
1,317.59
12.00 15,811.07
02.02.09
ESTRUCTURAS METALICAS SILO 09
KG
1,317.59
12.00 15,811.07
02.02.10
ESTRUCTURAS METALICAS SILO 10
KG
1,317.59
12.00 15,811.07
02.02.11
ESTRUCTURAS METALICAS SILO 11
KG
775.00
12.00
9,299.97
02.02.12
ESTRUCTURAS METALICAS SILO 12
KG
775.00
12.00
9,299.97
02.02.13
ESTRUCTURAS METALICAS SILO 13
KG
1,588.89
12.00 19,066.63
02.02.14
ESTRUCTURAS METALICAS SILO 14
KG
1,588.89
12.00 19,066.63
02.02.15
ESTRUCTURAS METALICAS TOLVA BASCULA
KG
1,354.00
12.00 16,248.00
02.02.16
ESTRUCTURAS METALICAS TOLVA PULMON
KG
784.00
KG
1,125.00
14.00 15,750.00
PLANCHA ESTRIADA DE PISOS e=2.5mm
KG
9,161.00
14.00
###
ESTRUCTURAS DE PARRILLA
KG
117.00
28.00
3,276.00
BARANDAS DE PLATAFORMAS
KG
02.03 02.03.01 02.04
PLANCHA ESTRIADA USADA EN PISOS
02.06.01 03 03.01 0.01.01 03.02
128,254.00
CARTELAS
02.05.01 02.06
9,408.00 15,750.00
ESTRUCTURAS DE PARRILLA
02.04.01 02.05
12.00
PARRILLA DE POZA DE DECARGA
3,276.00
BARANDAS
-
28.00
-
INSTALACIONES ELECTRICAS
S/.
TABLERO DE CONTROL TABLERO DE FUERZA
UNID. 5,086.00
1
5,086.00
CONDUCTORES
-
03.02.01
CABLE ELECTRICO N2XOH 3-1X4MM2
m
993.00
3.87
3,842.91
03.02.02
CABLE ELECTRICO N2XOH 3-1X35MM2
m
32.00
17.07
546.24
03.02.03
CABLE ELECTRICO N2XOH 3-1X50MM2
m
32.00
20.72
663.04
03.02.04
CABLE DESNUDO Cu DE 16mm2
m
10.00
3.29
32.90
m
1,067.00
35.75
03.03 03.03.01 03.04 03.04.01 03.04.02 0.05 03.05.01 04 04.01 04.01.01 04.02
TUBERIA CONDUID TUBERIA CONDUID 40 mm
-
BANDEJAS
unid.
100.00
68.14
6,814.00
ACCESORIOS
unid.
16.00
181.39
2,902.24
unid.
1.00
2800
2,800.00
PUESTA A TIERRA
-
EQUIPAMIENTO INDUSTRIAL
2,800.00
-
MONTAGE MONTAJE DE EQUIPOS DE PRODUCCION
38,145.25
###
BANDEJAS ELECTRICAS
PUESTA A TIERRA
46,031.25
5,086.00
GLOB
1.00
170592
### ###
EQUIPOS DE PRODUCCION
-
04.02.01
SILO DE GRANOS 500 TN+ BARREDORA
UNID.
04.02.02
ELEVADOR DE CANGILONES 20m
UNID.
1.00 69961.3 3.00 58172.4
04.02.03
TORNILLO SINFÍN 14m
UNID.
2.00
28743
04.02.04
COMPUERTA NEUMATICA
UNID.
2.00
3946.8
04.02.05
VALVULA REBATIBLE
UNID.
4.00
3946.8
###
04.02.06
INDICADOR DE NIEVEL MOTORIZADO
UNID.
12.00
1587.3
###
04.02.07
INDICADOR DE NIVEL CAPACITIVO
UNID.
14.00
1587.3
###
04.02.08
BASCULA DOSIFICADORA 1000 L
UNID.
1.00
36894
###
04.02.09
TORNILLO SINFÍN 6m
UNID.
10.00
12012
###
04.02.10
ALIMENTADOR DE MOLINO DE MARTILLOS 1m3
UNID.
1.00
26598
###
04.02.11
MOLINO DE MARTILLOS 75kW
UNID.
1.00
97812
###
04.02.12
MEZCLADOR HORIZONTAL POR BACTCHES
UNID.
1.00
215015
04.02.13
TOLVA DESCARGA DE MEZCLADOR
UNID.
1.00
4676.1
04.02.14
PRENZA PELLETS 75kW + ALIMENTADOR
UNID.
1.00
337194
###
04.02.15
ENDRIADORA DE PELLETS
UNID.
1.00
81081
###
04.02.16
CLICLON
UNID.
1.00
23595
###
04.02.17
VENTILADOR CENTRIFUGO
UNID.
1.00
26598
###
04.02.18
DESMENUZADORA + ALIMENTADOR
UNID.
###
04.02.19
TORNILLO SINFÍN 2m
UNID.
1.00 86872.5 2.00 9438
04.02.20
TAMIZ VIBRATORIO
UNID.
1.00
45474
04.02.21
VALVULA 2 VIAS
UNID.
1.00
3946.8
04.02.22
BALANZA ENSECADORA
UNID.
2.00
53625
04.02.23
CORREA DE COSTURA Y COLUMNA
UNID.
2.00
39468
04.02.24
MAQUINA DE COSER MOVIL
UNID.
2.00
4933.5
04.02.25
COMPRESOR DE 10HP Q 1150L, 7.5bar + INSTALAC UNID.
1.00
18200
### ### 7,893.60
### 4,676.10
### ### 3,946.80 ### ### 9,867.00 ###
### 170,592.03 ###
04.02.26
CALDERA DE VAPOR 1500KG/H 8 bar
04.03
UNID.
1.00
0
AUTOMATIZACION DE EQUIPOS
-
04.03.01
PANEL DE CONTROL ELECTRICO
UNID.
1.00
39200
04.03.02
SISTEMA DE CONTRON BACHING + CABLEADO
UNID.
1.00
19040
04.03.03
PLC PARA ALIEMENTADOR DE MOLINO MARTILLOS
UNID.
1.00
3900
### 3,900.00
COSTO DIRECTO GASTOS GENERALES UTILIDAD
### 12 %
S/. 369,921.59
5%
S/. 154,134.00
18 %
S/. 649,212.40
SUB TOTAL IGV. PRESUPUESTO TOTAL
62,140.00
###
###
###