ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO TIPO DE CONTRATO:

CONTRATO DE OBRA A PRECIOS UNITARIOS

N° DE CONTRATO:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROYECTO

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: CONTRATISTA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SUPERVISIÓN:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

REFERENCIAS:

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

SECCIÓN

1 1.1 1.2 1.2 2 2.1 2.2 3 3.1 3.2 3.3 4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.1.7 4.1.8 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 6 6.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9

Página 1

6.2 6.3

DESCRIPCIÓN

INGENIERÍA DEL PROYECTO DISEÑO DE MEZCLAS DE CONCRETO DISEÑO DE MEZCLA HOLCIM DISEÑO DE MEZCLA CEMEX CONCRETOS INGENIERÍA DE DETALLE PLANOS AS-BUILT PLANOS DE TALLER PLANOS AS-BUILT PLANOS DE CELDAS MANUALES PLAN DE ASEGURAMIENTO DE CALIDAD PROCEDIMIENTOS ADMINISTRATIVOS PLAN DE PRUEBAS E INSPECCIÓN PROCEDIMIENTOS PROCEDIMIENTOS CONSTRUCTIVOS 01-PC-NAICM-FDPC-PROC. CONSTRUCTIVO DE FAB. DE PILOTES DE CONRETO 02-PC-NAICM-HDPTC-HINCADO DE PILOTES PPD 40 X 40 03-PC-NAICM-HDPET-HINCADO DE PILOTES 50 X 50 04-PC-NAICM-PDCPP-PRUEBAS DINAMICAS 05-PC-NAICM-HDPIND-HINCADO DE PILOTES INDICADORES 50 X 50 06-PC-NAICM-PITPI ID Y TRAZAB PILOTES CONTROL 07-PC-NAICM-PCTRPC. PROC. PARA CARGA Y TRANS. DE PILOTES CONCRETO 08-PC-NAICM-HDPIND-HINCADO DE PILOTES INDICADORES 40 X 40 PROCEDMIENTOS DEL PLAN DE ASEGURAMIENTO DE CALIDAD 01 PAD-NAICM-PCD-01 CONTROL DE DOCUMENTOS 02 PAD-NAICM-PCSSC-01 COMPRAS 03 PAD-NAICM-PIT-01 TRAZABILIDAD 04 PAD-NAICM-PCP-02 CONTROL DE PROCESO 05 PAD-NAICM-PAIC-01 AUDITORIAS INTERNAS DE CALIDAD 06 PAD-NAICM-PCPNC-01 PRODUCTO NO CONFORME 07 PAD-NAICM-PAPC-01 ACCIONES PREVENTIVAS Y CORRECTIVAS 08 PAD-NAICM-PAM-00 ACCIONES DE MEJORA ACREDITACIONES DE LABORATORIOS Y CALIBRACIONES DE EQUIPOS EQUIPOS E INSTRUMENTOS DE MEDICIÓN VERIFICACIÓN Y CALIBRACIÓN DOCUMENTACIÓN DE LABORATORIO DE PRUEBAS DINAMICAS DE PILOTES ACREDITACIONES ema ACREDITACIÓN ema EN RAMA CONST. UNI. AUTONOMA DE NUEVO LEÓN ACREDITACIÓN ema EN RAMA METAL MECÁNICA LAB. DE CONTROL S.A. DE C.V. ACREDITACIÓN ema EN RAMA CONST. LABORATORIO LACECO S.A. DE C.V. CERTIFICADOS DE MATERIALES Y FICHAS TÉCNICAS CERTIFICADOS DE MATERIALES ACERO DE REFUERZO ZUNCHOS ACERO DE PRESFUERZO CEMENTO CONECTORES ADITIVOS PARA CONCRETO MICROSILICA CEMENTO

FICHAS TÉCNICAS MICROSILICA

LOCALIZACIÓN EN CARPETA POR SECCIÓN

SEC.01 CARPETA 1 DE 1 SEC.01 CARPETA 1 DE 1 SEC.01 CARPETA 1 DE 1 SEC. 02 CARPETA 1 DE 2 SEC. 02 CARPETA 2 DE 2 SEC. 03 CARPETA 1 DE 1 SEC. 03 CARPETA 1 DE 1 SEC. 03 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC. 04 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC.05 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1

ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1

ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO TIPO DE CONTRATO:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROYECTO

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: CONTRATISTA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SUPERVISIÓN:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

REFERENCIAS:

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

SECCIÓN

6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 7 7.1.1 7.1.2 7.1.3 7.2 7.2.1.1 7.2.1.2 7.2.1.3 7.2.1.4 7.2.1.5 7.2.1.6 7.2.1.7 7.2.2.1 7.2.2.2 7.2.2.3 7.2.2.4 7.2.2.5 7.2.2.6 7.2.2.7 7.2.2.8 7.3 7.3.1 7.3.1.1 7.3.2 7.3.2.1 7.3.3 7.3.3.1 7.3 7.4 7.5 7.6 7.6.1 7.6.2 7.6.3 7.6.4 7.6.5 7.6.6 7.6.7

Página 2

CONTRATO DE OBRA A PRECIOS UNITARIOS

N° DE CONTRATO:

DESCRIPCIÓN

CONECTORES ACERO DE REFUERZO G 52 ADITIVOS PARA CONCRETO PROTECTO GROUT NM MASTEREMACO S488 CI EUCON W.O EUCON CIA EUCON MSA ADITIVO EN POLVO, PARA CONCRETO REPORTES DE PRUEBAS DE CALIDAD RESISTENCIA A LA COMPRESIÓN DE LA MUESTRA 01 A LA 700 RESISTENCIA A LA COMPRESIÓN DE LA MUESTRA 701 A LA 1350 RESISTENCIA A LA COMPRESIÓN DE LA MUESTRA 1351 A LA 1913 AGREGADOS PARA CONCRETO ARENA-GRAVA INFORME ANÁLISIS FÍSICO-QUÍMICO. HOLCIM INFORME DETERMINACIÓN DE PARTÍCULAS LIGERAS INFORME DETER. DE TERRONES DE ARCILLA Y PARTÍCULAS DELEZNABLES INFORME CITEC-PR-16-146 DETERMINACIÓN DEL EQUIVALENTE DE ARENA INFORME CITEC-PR-16-146 ANÁLISIS FÍSICO DE ARENA INFORME CITEC-PR-16-146 DETERMINACIÓN DE LA SANIDAD INFORME CITEC-PR-16-134 REACCIÓN ÁLCALI-AGREGADO. HOLCIM CITEC-PR-16-147 ANÁLISIS FÍSICO-QUÍMICO. HOLCIM CITEC-PR-16-147 DESGASTE DE LOS ÁNGELES. HOLCIM CITEC-PR-16-147 DETERMINACIÓN DE PARTÍCULAS LIGERAS. HOLCIM CITEC-PR-16-147 DETERMINACIÓN DEL COEFICIENTE VOLUMÉTRICO. HOLCIM CITEC-PR-16-147 REP. ANÁLISIS FÍSICO -GRANULOMETRÍA- DE GRAVA. HOLCIM CITEC-PR-16-147 REPORTE DETERMINACIÓN DE LA SANIDAD. HOLCIM CITEC-PR-16-147 REP. DETERMINACIÓN DE PIEZAS PLANAS Y ALARGADAS. HOLCIM CITEC-PR-16-134 REACCIÓN ÁLCALI-AGREGADO. HOLCIM INFORME DE RESULTADOS INSUMOS PARA CONCRETO. HOLCIM CEMENTO INF. DE RESULTADOS CEMENTO CPO 30 R RS/BRA DEL 01-AGO AL 01 SEP 2016 CENIZA VOLANTE REACTIVIDAD CENIZA VOLANTE. HOLCIM AGUA PARA CONCRETO INFORME 093/2016 DETERMINACIÓN DEL ANÁLISIS FÍSICO QUÍMICO AGUA. HOLIM ACERO PERMEABILIDAD CEMENTO PRUEBAS DINÁMICAS DEL INFORME No.01 AL 08 PRUEBAS DINÁMICAS DEL INFORME No.09 AL 11 PRUEBAS DINÁMICAS DEL INFORME No.12 AL 15 PRUEBAS DINÁMICAS DEL INFORME No.16 AL 18 PRUEBAS DINÁMICAS DEL INFORME No.19 AL 20 PRUEBAS DINÁMICAS DEL INFORME No.21 AL 22 PRUEBAS DINÁMICAS DEL INFORME No.23 AL 24 PRUEBAS DINÁMICAS DEL INFORME No.25 AL 27

LOCALIZACIÓN EN CARPETA POR SECCIÓN

SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC. 06 CARPETA 1 DE 1 SEC.07 CARPETAS 01 DE 12 SEC.07 CARPETAS 02 DE 12 SEC.07 CARPETAS 03 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 04 DE 12 SEC.07 CARPETAS 05 DE 12 SEC.07 CARPETAS 06 DE 12 SEC.07 CARPETAS 07 DE 12 SEC.07 CARPETAS 08 DE 12 SEC.07 CARPETAS 09 DE 12 SEC.07 CARPETAS 10 DE 12 SEC.07 CARPETAS 11 DE 12 SEC.07 CARPETAS 12 DE 12

ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD

ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO TIPO DE CONTRATO:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROYECTO

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: CONTRATISTA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SUPERVISIÓN:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

REFERENCIAS:

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

SECCIÓN

Página 3

CONTRATO DE OBRA A PRECIOS UNITARIOS

N° DE CONTRATO:

DESCRIPCIÓN

8 8.1 8.2 8.3 8.4 8.4.1 8.4.2 8.4.3 8.4.4 8.4.5 8.5 8.5.1 8.5.2 8.5.3 8.5.4 8.5.5 8.5.6 8.5.7 8.5.8 8.5.9 8.6 8.6.1 8.6.2 8.6.3 8.6.4 8.6.5 8.7 8.7.1 8.7.2 8.7.3 8.7.4 8.7.5 8.7.6 8.7.7 8.7.8 8.7.9 8.7.10 8.7.11 8.7.12 8.7.13 8.7.14 8.7.15 8.7.16 8.7.17 8.7.18 8.7.19 8.7.20 8.7.21

LISTAS DE VERIFICACIÓN FABRICACIÓN, HINCADO Y CONTROL GEOMETRICO ACTAS DE TENSADO TORON TRAZABILIDAD REMISIONES DE DOSIFICACIÓN DE MEZCLA ACTAS DE NACIMIENTO, HINCADO Y CONTROL GEOMÉTRICO TORRE DE CONTROL CELDAS TC-A1-A2 TORRE DE CONTROL CELDAS TC-A3-A4 TORRE DE CONTROL CELDAS TC-A5-A6 TORRE DE CONTROL CELDAS TC-A7-A8 TORRE DE CONTROL CELDAS TC-A9-A10-A11 CENTRO DE TRANSPORTE TERRESTRE CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA A-B-C CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA C CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA D 1ERA CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA D 2DA CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA E 1ERA CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA E 2DA CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA F CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CELDA G-H-I CENTRO DE TRANSPORTE TERRESTRE CELDAS CTT CUBIERTA PUENTES FIJOS PUENTES FIJOS DEL 01 AL 11 PUENTES FIJOS DEL 12 AL 20 PUENTES FIJOS DEL 21 AL 30 PUENTES FIJOS DEL 31 AL 41 PUENTES FIJOS DEL 42 AL 50 EDIFICIO TERMINAL EDIFICIO TERMINAL CELDAS E.T. PINDICADORES EDIFICIO TERMINAL CELDAS E.T. CELDA 01 EDIFICIO TERMINAL CELDAS E.T. CELDA 2C 1ERA EDIFICIO TERMINAL CELDAS E.T. CELDA 2C 2DA EDIFICIO TERMINAL CELDAS E.T. CELDA 2D 1ERA EDIFICIO TERMINAL CELDAS E.T. CELDA 2D 2DA EDIFICIO TERMINAL CELDAS CELDA A1 E.T. PERIMETRAL EDIFICIO TERMINAL CELDAS E.T. CELDA A02 EDIFICIO TERMINAL CELDAS E.T. CELDA A02 EDIFICIO TERMINAL CELDAS E.T. CELDA A03 EDIFICIO TERMINAL CELDAS E.T. CELDA A03 EDIFICIO TERMINAL CELDAS E.T. CELDA A04-05 EDIFICIO TERMINAL CELDAS E.T. CELDA A06 EDIFICIO TERMINAL CELDAS E.T. CELDA A07 EDIFICIO TERMINAL CELDAS E.T. CELDA A08 1RA EDIFICIO TERMINAL CELDAS E.T. CELDA A08 2DA EDIFICIO TERMINAL CELDAS E.T. CELDA A08 3RA EDIFICIO TERMINAL CELDAS E.T. CELDA A09 1RA EDIFICIO TERMINAL CELDAS E.T. CELDA A09 2DA EDIFICIO TERMINAL CELDAS E.T. CELDA A10 1RA EDIFICIO TERMINAL CELDAS E.T. CELDA A10 2DA

8.7.22 8.7.23

EDIFICIO TERMINAL CELDAS E.T. CELDA A11 1RA EDIFICIO TERMINAL CELDAS E.T. CELDA A11 2DA

LOCALIZACIÓN EN CARPETA POR SECCIÓN

SEC.08 CARPETA 01 DE 63 SEC.08 CARPETA 01 DE 63 SEC.08 CARPETA 01 DE 63 SEC.08 CARPETA 02 DE 63 SEC.08 CARPETA 02 DE 63 SEC.08 CARPETA 03 DE 63 SEC.08 CARPETA 04 DE 63 SEC.08 CARPETA 05 DE 63 SEC.08 CARPETA 06 DE 63 SEC.08 CARPETA 07 DE 63 SEC.08 CARPETA 07 DE 63 SEC.08 CARPETA 08 DE 63 SEC.08 CARPETA 09 DE 63 SEC.08 CARPETA 10 DE 63 SEC.08 CARPETA 11 DE 63 SEC.08 CARPETA 12 DE 63 SEC.08 CARPETA 13 DE 63 SEC.08 CARPETA 14 DE 63 SEC.08 CARPETA 15 DE 63 SEC.08 CARPETA 16 DE 63 SEC.08 CARPETA 16 DE 63 SEC.08 CARPETA 17 DE 63 SEC.08 CARPETA 18 DE 63 SEC.08 CARPETA 19 DE 63 SEC.08 CARPETA 20 DE 63 SEC.08 CARPETA 21 DE 63 SEC.08 CARPETA 21 DE 63 SEC.08 CARPETA 22 DE 63 SEC.08 CARPETA 23 DE 63 SEC.08 CARPETA 24 DE 63 SEC.08 CARPETA 25 DE 63 SEC.08 CARPETA 26 DE 63 SEC.08 CARPETA 27 DE 63 SEC.08 CARPETA 28 DE 63 SEC.08 CARPETA 29 DE 63 SEC.08 CARPETA 30 DE 63 SEC.08 CARPETA 31 DE 63 SEC.08 CARPETA 32 DE 63 SEC.08 CARPETA 33 DE 63 SEC.08 CARPETA 34 DE 63 SEC.08 CARPETA 35 DE 63 SEC.08 CARPETA 36 DE 63 SEC.08 CARPETA 37 DE 63 SEC.08 CARPETA 38 DE 63 SEC.08 CARPETA 39 DE 63 SEC.08 CARPETA 40 DE 63 SEC.08 CARPETA 41 DE 63

ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD SEC.08 CARPETA 42 DE 63 SEC.08 CARPETA 43 DE 63

ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO TIPO DE CONTRATO:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROYECTO

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: CONTRATISTA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SUPERVISIÓN:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

REFERENCIAS:

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

SECCIÓN

Página 4

CONTRATO DE OBRA A PRECIOS UNITARIOS

N° DE CONTRATO:

DESCRIPCIÓN

8.7.24 8.7.25 8.7.26 8.7.27 8.7.28 8.7.29 8.7.30 8.7.31 8.7.32 8.7.33 8.7.34 8.7.35 8.7.36 8.7.37 8.7.38 8.7.39 8.7.40 8.7.41 8.7.42 8.7.43 9 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 9.10 10 10.1 11 11.1 11.2 11.3 11.4 11.5 11.6 11.7

EDIFICIO TERMINAL CELDAS E.T. CELDA A12 EDIFICIO TERMINAL CELDAS E.T. CELDA A12 EDIFICIO TERMINAL CELDAS E.T. CELDA A13 EDIFICIO TERMINAL CELDAS E.T. CELDA A13 EDIFICIO TERMINAL CELDAS E.T. CELDA A14 EDIFICIO TERMINAL CELDAS E.T. CELDA A14 EDIFICIO TERMINAL CELDAS E.T. CELDA A15 EDIFICIO TERMINAL CELDAS E.T. CELDA A15 EDIFICIO TERMINAL CELDAS E.T. CELDA A16 EDIFICIO TERMINAL CELDAS E.T. CELDA A16 EDIFICIO TERMINAL CELDAS E.T. CELDA A17 EDIFICIO TERMINAL CELDAS E.T. CELDA A17 EDIFICIO TERMINAL CELDAS E.T. CELDA A18 EDIFICIO TERMINAL CELDAS E.T. CELDA A18 EDIFICIO TERMINAL CELDAS E.T. CELDA A19 EDIFICIO TERMINAL CELDAS E.T. CELDA A19 EDIFICIO TERMINAL CELDAS E.T. CELDA A20 EDIFICIO TERMINAL CELDAS E.T. CELDA A20 EDIFICIO TERMINAL CELDAS E.T. CELDA A21 EDIFICIO TERMINAL CELDAS E.T. CELDA A22 CERTIFICACIONES CERTIFICACIONES DEL CONTRATISTA CURRICULA DE LA EMPRESA PRUEBAS DINÁMICAS EN PILOTES CERTIFICACIÓN LEED GREEN ASSOCIATE CERTIFICACIONES Y CURRICULA DE LA EMPRESA LACECO CERTIFICACIONES Y CURRICULA DE LA EMPRESA LABORATORIO DE CONTROL Certificaciones ACI (American Concrete Institute) De obra de la Contratista Certificaciones ACI (American Concrete Institute) Gami, Ingeniería e Instalaciones Organigrama de Control de Calidad Gami, Ingeniería e Instalaciones Inspecciones de Terminación (Preliminar, Aprobación Final) Cartas de Nombramiento para el Control de Calidad MEDIO AMBIENTE/ SISTEMA LEED MEDIO AMBIENTE/PROTOCOLO LEED ASEGURAMIENTO DE CALIDAD REPORTES DIARIOS DE CONTROL DE CALIDAD REPORTES SEMANALES DE CONTROL DE CALIDAD REPORTES MENSUALES DE CONTROL DE CALIDAD LISTAS DE VERIFICACIÓN DE LA FASE PREVIA-FINAL CIERRE DE NO CONFORMIDADES MINUTAS DE REUNIÓN SEMANAL DE CONTROL DE CALIDAD BITACORAS DE CURADO DE PILOTES

1 1.1 1.2

SECCIÓN ANEXO VIADUCTO AREA FRONTAL LADO TIERRA LISTAS DE VERIFICACIÓN, FABRICACIÓN, HINCADO Y CONTROL GEOMETRICO AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-2 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-3

LOCALIZACIÓN EN CARPETA POR SECCIÓN

SEC.08 CARPETA 44 DE 63 SEC.08 CARPETA 45 DE 63 SEC.08 CARPETA 46 DE 63 SEC.08 CARPETA 47 DE 63 SEC.08 CARPETA 48 DE 63 SEC.08 CARPETA 49 DE 63 SEC.08 CARPETA 50 DE 63 SEC.08 CARPETA 51 DE 63 SEC.08 CARPETA 52 DE 63 SEC.08 CARPETA 53 DE 63 SEC.08 CARPETA 54 DE 63 SEC.08 CARPETA 55 DE 63 SEC.08 CARPETA 56 DE 63 SEC.08 CARPETA 57 DE 63 SEC.08 CARPETA 58 DE 63 SEC.08 CARPETA 59 DE 63 SEC.08 CARPETA 60 DE 63 SEC.08 CARPETA 61 DE 63 SEC.08 CARPETA 62 DE 63 SEC.08 CARPETA 63 DE 63 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1 SEC.09 CARPETA 1 DE 1

SEC. 11 CARPETA 1 DE 1 SEC. 11 CARPETA 1 DE 1 SEC. 11 CARPETA 1 DE 1 SEC. 11 CARPETA 1 DE 1 SEC. 11 CARPETA 1 DE 1 SEC. 11 CARPETA 1 DE 1 SEC. 11 CARPETA 1 DE 1

ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD ANEXO CARPETA 01 DE 17 ANEXO CARPETA 02 DE 17

ÍNDICE MAESTRO DEL LIBRO BLANCO DEL PROYECTO TIPO DE CONTRATO:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROYECTO

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

OBRA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CLIENTE: CONTRATISTA:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

SUPERVISIÓN:

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

REFERENCIAS:

SECCIONES: 018113-14 REQUISITOS DE DISEÑO SUSTENTABLES -LEED v4 BD+C; 024520 B1 PRUEBA DINÁMICA DE PILOTES Y 024560 B1 PILOTES DE CONCRETO PRESFORZADO. 014500 CONTROL DE LA CALIDAD

SECCIÓN

1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3 4 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 6 6.1 6.2 6.3 7 8 9 10

Página 5

CONTRATO DE OBRA A PRECIOS UNITARIOS

N° DE CONTRATO:

DESCRIPCIÓN

AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-4, B-6 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-7, B-8 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-9, B-10 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-11, B-12 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-13, B-14 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-15, B-16 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-17, B-18 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-19, B-20 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-21, B-22 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-23, B-27 AREA FRONTAL LADO TIERRA VIADUCTO CELDA B-24, B-28 AREA FRONTAL LADO TIERRA VIADUCTO CELDAS B-26, B-32 PRUEBAS DE LABORATORIO PRUEBAS DE CONTROL DE CALIDAD PARA AGREGADOS DETERMINACIÓN DEL ANÁLISIS FISICOQUÍMICO DEL AGUA DETERMINACIÓN DEL INTEMPERISMO ACELERADO SANIDAD (GRAVA Y ARENA) ANALISIS PETROGRÁFICO DE AGREGADOS ENSAYES DEL ACERO DE REFUERZO INFORMES DE ACERO DE REFUERZO VARILLA No.10 INFORMES DE ACERO DE REFUERZO ZUNCHO INFORMES DE ACERO DE REFUERZO TORON DE ½” NFORMES DE ACERO DE REFUERZO CONECTORES PRUEBAS DE PERMEABILIDAD POR EL MÉTODO DE RESISTIVIDAD ELÉCTRICA ENSAYES A LA COMPRESIÓN SIMPLE DE LAS MUESTRAS DE CONCRETO ACTIVIDADES DE CONTROL DE CALIDAD CERTIFICADOS DE ACERO CERTIFICADOS DE VARILLA DEL No.10 CERTIFICADOS DEL ZUNCHO CERTIFICADOS DEL TORON CERTIFICADOS DEL CEMENTO CERTIFICADOS DE LOS ADITIVOS BITACORA DE MANTENIMIENTO DE LA PLANTA DE CONCRETOS MECANO BOLETAS DE DOSIFICACIÓN DE LA MEZCLA DE CONCRETO LISTAS DE VERIFICACIÓN DE LA FASE PREVIA/FINAL BITACORA DE CURADO DE PILOTES MINUTAS DE CONTROL DE CALIDAD INTERNAS REPORTES DE CONTROL DE CALIDAD REPORTES DE CONTROL DE CALIDAD DIARIOS REPORTES DE CONTROL DE CALIDAD SEMANALES REPORTES DE CONTROL DE CALIDAD MENSUALES TRAZABILIDAD DE FABRICACIÓN DE PILOTES PARA EL VIADUCTO RESULTADOS DE PRUEBAS DINÁMICAS PLANOS AS-BUILT DEL AFLT CONVENIOS MODIFICATORIOS

LOCALIZACIÓN EN CARPETA POR SECCIÓN

ANEXO CARPETA 03 DE 17 ANEXO CARPETA 04 DE 17 ANEXO CARPETA 05 DE 17 ANEXO CARPETA 06 DE 17 ANEXO CARPETA 07 DE 17 ANEXO CARPETA 08 DE 17 ANEXO CARPETA 09 DE 17 ANEXO CARPETA 10 DE 17 ANEXO CARPETA 11 DE 17 ANEXO CARPETA 12 DE 17 ANEXO CARPETA 13 DE 17 ANEXO CARPETA 14 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 15 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 16 DE 17 ANEXO CARPETA 17 DE 17 ANEXO CARPETA 17 DE 17

ÍNDICE MAESTRO DEL DOSSIER DE CALIDAD