RESUMEN DE METRADOS TRANSPORTES ACTIVIDAD : "MEJORAMIENTO Y REHABILITACIÓN DE LA CARRETERA OCOBAMBA - RANRACANCHA EMPA
Views 206 Downloads 0 File size 382KB
RESUMEN DE METRADOS TRANSPORTES
ACTIVIDAD
: "MEJORAMIENTO Y REHABILITACIÓN DE LA CARRETERA OCOBAMBA - RANRACANCHA EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS - APURIMAC " : 02.02.00 PAVIMENTOS
FECHA
: Mayo 2016
PROYECTO
ITEM
PARTIDA
02.02.05
TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
02.02.06
TRANSPORTE DE MATERIAL GRANULAR D> 1 KM
UNIDAD m³-km m³-km
METRADO 21,317.85 43,751.20
"MEJORAMIENTO Y REHABILITACIÓN DE LA CARRETERA OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS - APURIMAC "
Sustento de metrados de transporte de Base Granular 02.02.05 TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM
21,317.85 m3-km
02.02.06 TRANSPORTE DE MATERIAL GRANULAR D> 1 KM
43,751.20 m3-km PAVIMENTOS
INICIO
(km)
FIN
(km)
Ecuación Empalme (m)
0+000.00
0+500.00
-
0+500.00
1+000.00
1+000.00
2+000.00
-
2+000.00
3+000.00
3+000.00 4+000.00 5+000.00
6+000.00
6+000.00
7+000.00
7+000.00 8+000.00
Código Cantera
Ubicación de Canteras (km)
Participación %
Acceso (km)
D.L.P. 120.00 m (km)
Distancia (km)
Longitud (m)
Ancho (m)
Área (m2)
500.00
6.80
3,400.00
SA (m2)
Espesor (m)
Volumen (m3)
0.00
0.20
680.00
5,324.40
C-1
8.15
100.00%
0.05
0.12
7.83
C-1
8.15
100.00%
0.05
0.12
7.33
500.00
6.80
3,400.00
0.00
0.20
680.00
C-1
8.15
100.00%
0.05
0.12
6.58
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
-
C-1
8.15
100.00%
0.05
0.12
5.58
1,000.00
6.80
6,800.00
0.00
0.20
4+000.00
-
C-1
8.15
100.00%
0.05
0.12
4.58
1,000.00
6.80
6,800.00
0.00
5+000.00
-
C-1
8.15
100.00%
0.05
0.12
3.58
1,000.00
6.80
6,800.00
0.00
C-1
8.15
100.00%
0.05
0.12
2.58
1,000.00
6.80
6,800.00
-
C-1
8.15
100.00%
0.05
0.12
1.58
1,000.00
6.80
8+000.00
-
C-1
8.15
100.00%
0.05
0.12
0.58
1,000.00
8+150.00
-
C-1
8.15
100.00%
0.05
0.12
0.01
150.00
8+150.00
8+625.00
-
C-1
8.15
100.00%
0.05
0.12
0.17
8+625.00
9+000.00
-
C-2
9.10
100.00%
0.07
0.12
9+000.00
9+100.00
-
C-2
9.10
100.00%
0.07
0.12
9+100.00
9+750.00
-
C-2
9.10
100.00%
0.07
Momento (m3-km)
D1km
km)
(m3-
680.00
4,644.40
4,984.40
680.00
4,304.40
8,948.80
1,360.00
7,588.80
1,360.00
7,588.80
1,360.00
6,228.80
0.20
1,360.00
6,228.80
1,360.00
4,868.80
0.20
1,360.00
4,868.80
1,360.00
3,508.80
0.00
0.20
1,360.00
3,508.80
1,360.00
2,148.80
6,800.00
0.00
0.20
1,360.00
2,148.80
1,360.00
788.80
6.80
6,800.00
0.00
0.20
1,360.00
788.80
788.80
-
6.80
1,020.00
0.00
0.20
204.00
1.02
1.02
-
475.00
6.80
3,230.00
0.00
0.20
646.00
108.21
108.21
-
0.24
375.00
6.80
2,550.00
0.00
0.20
510.00
121.13
121.13
-
0.00
100.00
6.80
680.00
0.00
0.20
136.00
0.12
0.28
650.00
6.80
4,420.00
0.00
0.20
884.00
243.10
243.10
-
-
-
-
9+750.00
10+000.00
-
C-3
10.40
100.00%
0.01
0.12
0.42
250.00
6.80
1,700.00
0.00
0.20
340.00
141.10
141.10
-
10+000.00
10+400.00
-
C-3
10.40
100.00%
0.01
0.12
0.09
400.00
6.80
2,720.00
0.00
0.20
544.00
48.96
48.96
-
10+400.00
11+000.00
-
C-3
10.40
100.00%
0.01
0.12
0.19
600.00
6.80
4,080.00
0.00
0.20
816.00
155.04
155.04
-
11+000.00
12+000.00
-
C-3
10.40
100.00%
0.01
0.12
0.99
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
1,346.40
1,346.40
-
12+000.00
13+000.00
-
C-3
10.40
100.00%
0.01
0.12
1.99
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
2,706.40
1,360.00
1,346.40
13+000.00
14+000.00
-
C-3
10.40
100.00%
0.01
0.12
2.99
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
4,066.40
1,360.00
2,706.40
14+000.00
14+200.00
-
C-3
10.40
100.00%
0.01
0.12
3.59
200.00
6.80
1,360.00
0.00
0.20
272.00
976.48
272.00
704.48
14+200.00
15+000.00
-
C-4
18.00
100.00%
0.01
0.12
3.29
800.00
6.80
5,440.00
0.00
0.20
1,088.00
3,579.52
1,088.00
2,491.52
15+000.00
16+000.00
C-4
18.00
100.00%
0.01
0.12
2.39
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
3,250.40
1,360.00
1,890.40
16+000.00
17+000.00
-
C-4
18.00
100.00%
0.01
0.12
1.39
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
1,890.40
1,360.00
530.40
17+000.00
18+000.00
-
C-4
18.00
100.00%
0.01
0.12
0.39
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
530.40
530.40
-
18+000.00
19+000.00
-
C-4
18.00
100.00%
0.01
0.12
0.39
1,000.00
6.80
6,800.00
0.00
0.20
1,360.00
530.40
530.40
-
19+000.00
19+150.00
-
C-4
18.00
100.00%
0.01
0.12
0.97
150.00
6.80
1,020.00
0.00
0.20
204.00
196.86
196.86
-
19+150.00
20+000.00
-
C-5
20.30
100.00%
0.01
0.12
0.62
850.00
6.80
5,780.00
0.00
0.20
1,156.00
710.94
710.94
-
20+000.00
20+300.00
-
C-5
20.30
100.00%
0.01
0.12
0.04
300.00
6.80
2,040.00
0.00
0.20
408.00
16.32
16.32
-
20+300.00
20+724.83
-
C-5
20.30
100.00%
0.01
0.12
0.10
424.83
6.80
2,888.84
0.00
0.20
577.77
59.17
59.17
65,069.05
21,317.85
28,185.77 Dist.Media (km):
43,751.20
2.31
Página 2 de 3
PROYECTO
: "MEJORAMIENTO Y REHABILITACIÓN DE LA CARRETERA OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS - APURIMAC "
VOLUMENES A TRANSPORTAR DE CANTERAS
Código C.G. Acceso Capacidad Total
C-1
Saldo 01 Utiliz. Mat. Granular % Uso acumulado Saldo 02
BASE
BASE
RELLENO
RELLENO
RELLENO
C-2
C-3
C-4
C-5
8150.000
9100.000
10400.000
18000.000
20300.000
0.05
0.07
0.01
0.01
0.01
32,000.00
22,000.00
12,500.00
10,500.00
15,200.00
0.0
0.0
0.0
0.0
0.0
Utilizado Relleno % Uso acumulado
BASE
0.00%
0.00%
0.00%
0.00%
0.00%
32,000.00
22,000.00
12,500.00
10,500.00
15,200.00
11,730.00
1,530.00
6,052.00
6,732.00
2,141.77
36.66%
6.95%
48.42%
64.11%
14.09%
20,270.00
20,470.00
6,448.00
3,768.00
13,058.23
Utiliz. Mat. Gran. Ref. % Uso acumulado SALDO TOTAL
36.66%
6.95%
48.42%
64.11%
14.09%
20,270.00
20,470.00
6,448.00
3,768.00
13,058.23
Factor
1.00
1.00
1.00
1.00
1.00
Rell. a transp
-
-
-
-
-
Mat. Granular Mat. Granular Ref.
11,730.00 -
total por cantera
11,730.00
total a transportar
28,185.77
1,530.00 1,530.00
6,052.00 6,052.00
6,732.00 6,732.00
2,141.77 2,141.77