T&T Subsection Local IAS Chapter GROUNDING-DESIGN AND CONSTRUCTION Saturday 12th November 2005
Presented by
Eng. Sahadeo Latchmepersad, MIEEE, MAPETT, R. Eng.
Substation Grounding- Sahadeo Latchmepersad, T&TEC
1
ACKNOWLEDGEMENT The
Trinidad and Tobago Electricity Commission Substation Grounding- Sahadeo Latchmepersad, T&TEC
2
Range of Large Industrial Customers
Rate D3 -
4-25 MVA at 33, 66 or 132 kV
Rate E >
25 MVA at 66 or 132kV Substation Grounding- Sahadeo Latchmepersad, T&TEC
3
Substation Grounding- Sahadeo Latchmepersad, T&TEC
4
Transmission
B.C/Union Estate Schematic
Substation Grounding- Sahadeo Latchmepersad, T&TEC
5
Objectives of Grounding
To provide means to carry electric currents to earth under normal and fault conductors without exceeding any operating and equipment limits or adversely affecting continuity of service.
Substation Grounding- Sahadeo Latchmepersad, T&TEC
6
Objectives of Grounding
To ensure that a person in the vicinity of grounded facilities is not exposed to the danger of critical electric shock.
Substation Grounding- Sahadeo Latchmepersad, T&TEC
7
Basic Shock Situations
Substation Grounding- Sahadeo Latchmepersad, T&TEC
8
BRIGHTON 66kV SUBSTATION
Substation Grounding- Sahadeo Latchmepersad, T&TEC
9
Ventricular Fibrillation
The most dangerous consequence of electric current passing through the vital parts of a human body is a heart condition – ventricular fibrillation – immediate arrest of blood circulation.
Substation Grounding- Sahadeo Latchmepersad, T&TEC
10
Design Algorithm
Substation Grounding- Sahadeo Latchmepersad, T&TEC
11
Measuring Soil Resistivity
Procedure depends on the instrument
Substation Grounding- Sahadeo Latchmepersad, T&TEC
12
Substation Grounding- Sahadeo Latchmepersad, T&TEC
13
Soil Resistivity Calculation
ρ
= 2 x Pi x a x R Where R is Maximum measured Value Substation Grounding- Sahadeo Latchmepersad, T&TEC
14
Tolerable Step Voltage Step Voltage Limit 50 kg E Step 50 = (1000 + 6 Cs ρs) 0.116
√ts
E
Step 70
= (1000 + 6 Cs ρs) 0.157 √ts
Substation Grounding- Sahadeo Latchmepersad, T&TEC
15
Tolerable Touch Voltage Limit
E
touch50
E
touch70
= (1000 + 1.5 Cs ρs) 0.116 √ts = (1000 + 1.5 Cs ρs) 0.157 √ts
Substation Grounding- Sahadeo Latchmepersad, T&TEC
16
Constants
Cs = 1 – [0.09 (1 - ρ/ ρ s)] [2 hs + 0.09] ρ = soil resitivity ρ s = surface layer resistivity Ts = duration of shock current in seconds including clearance time of circuit breaker plus relay Substation Grounding- Sahadeo Latchmepersad, T&TEC
17
Conductor Sizing
I = Amm2 [TCAP.10-4]
Ln Ko + Tm
[tc αr ρr]
Substation Grounding- Sahadeo Latchmepersad, T&TEC
Ko + Ta
18
Grid Resistance 1 1 1 Rg = ρ + 1 + 20 A 1 + h 20 / A LT Whereρ is the soil resistivity LT is the total length of conductor h is the depth of burial Substation Grounding- Sahadeo Latchmepersad, T&TEC
19
Substation Grounding- Sahadeo Latchmepersad, T&TEC
20
Calculated Step Voltage
Es = ρKs Ki IG Ls
Ls = 0.75Lc + 0.85 LR
Substation Grounding- Sahadeo Latchmepersad, T&TEC
21
Calculated Mesh Voltage Em = ρ Km Ki IG Where LM Lm = Lc + 1.55 +1.22
Lr
LR
LX2 + Ly2 LR = total length of ground rods Lc = length of conductor
Substation Grounding- Sahadeo Latchmepersad, T&TEC
22
Earthing Designs
Nitrogen 2000 66kV Substation
Substation Grounding- Sahadeo Latchmepersad, T&TEC
23
Output file
Nitrogen 2000 substation
Substation Grounding- Sahadeo Latchmepersad, T&TEC
24
Exothermic Joints
Step 1 Position clean, dry cables in mold and close clamp.
Substation Grounding- Sahadeo Latchmepersad, T&TEC
25
Insert disk, insert pour weld metal and starter material into crucible, and ignite to form the weld.
Substation Grounding- Sahadeo Latchmepersad, T&TEC
26
Remove finished connection. Clean mold
Substation Grounding- Sahadeo Latchmepersad, T&TEC
27
FENCE EARTHING 1. Inclusion of the fence within the ground grid area. Under this philosophy, the perimeter conductor of the grid will parallel the fence at a short distance of 1.0m outside. The crushed rock covering will also be required outside the fence. Substation Grounding- Sahadeo Latchmepersad, T&TEC
28
FENCE EARTHING 2. Placement of the fence outside the ground grid area with close electric coupling between fence and adjacent earth along its length, but with no electrical tie between the fence and the main station grid
Substation Grounding- Sahadeo Latchmepersad, T&TEC
29
ANSI STANDARD 80-2000
Date: Date:
November 11, 2005
T&TEC Grounding Program INPUT DATA Line-to-line Voltage V Maximum fault curent HV side Maximum Fault Current LV side Soil resistivity ρ Substation Length L Substation Width W Spacing D Number of ground rods Length of ground rod Depth of grid burial h Fault Duration t f
66000 Volts 20000 Amps 20000 Amps 15 34 30 4 28 2.44 0.5 0.1
Current Division Factor Sf X/R Ratio
1 7.20
Crushed Rock Resistivity ρs
2500
Ωm metre metre metre Ea metres metres s
Thickness of crushed rock hs Grid shape (Square=S, Rect.=R, L- shaped=L) Substation L-shape Length l Substation L-shape width w
1792 Volts 5678 Volts
Touch voltage limit E touch 50 Step voltage limit E step 50
1324 Volts 4195 Volts
GPR = Em= Es=
4944 Volts 606 Volts 619 Volts
Length of 4/0 Copper Required
574 metres
Size of Copper d = No. of Copper Rods
0.01 metres 28 Ea
Grid Resistance
0.23
Ωm
o 40 C
Ambient temp Ta
RESULTS Touch voltage limit E touch 70 Step voltage limit E step 70
Ω
0.102 metres r 0 metre 0 metre
50kg Design O.K 70kg Design O.K Substation Grounding- Sahadeo Latchmepersad, T&TEC
30
Development Program
Substation Grounding- Sahadeo Latchmepersad, T&TEC
31
AutoGrid Pro
Substation Grounding- Sahadeo Latchmepersad, T&TEC
32
Connection to Customer’s Substation Fence eathing Number of Tails Increased area-lower Rg Increased amount of copper
Substation Grounding- Sahadeo Latchmepersad, T&TEC
33
The End
Questions?
Thank You
Substation Grounding- Sahadeo Latchmepersad, T&TEC