SAP Notes 30656.pdf

SAP Note 30656 - Change base unit of measure/batch mngt requirement Note Language: English Version: 9 Validity: Valid

Views 41 Downloads 0 File size 16KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

SAP Note 30656 - Change base unit of measure/batch mngt requirement Note Language: English

Version: 9 Validity:

Valid Since 06.01.2003

Summary Symptom When maintaining a material master record, you change the base unit of measure or the batch management requirement indicator or the valuation category. The system then tells you that this change is not possible since stocks still exist. However, no stocks are shown for the material in the stock overview.

More Terms Transactions: MM01, MM02; program SAPMM03M Fields: MARA-MEINS, MARA-XCHPF, MARC-XCHPF, MBEW-BWTTY S530, M3530, M3189

Cause and Prerequisites The message that stocks still exist refers not only to stocks in the current period, but also to stocks in the previous period. The reason for checking previous period stocks is that postings can also be made to the previous period when entering goods movements. This would result in inconsistencies if the base unit of measure had meanwhile been changed.

Solution Please check whether stocks still exist for the previous period by displaying, for example, the plant stock view or storage location stock view of the material. You do this by selecting "Extras -> Previous period -> Prev. pd SLoc. stock or Prev. pd plant stock". If previous period stocks exist, you can make a withdrawal posting as follows: 1.

Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.

2.

Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).

You can now try again to change the base unit of measure or the batch management requirement indicator. Since the posting of the previous period values to zero is identical with posting to the stocks of the current period, you should reverse the above stock postings (i.e. the stock from the previous period should be booked in again) to make sure that the stock values from the previous and the current periods correspond to the state before the change. Please note, however, that the postings are then carried out using the changed master data from the current period (e.g. account determination, etc.)!

02.06.2009

Page 1 of

2

SAP Note 30656 - Change base unit of measure/batch mngt requirement Header Data Release Status: Released on: Original Lang.: Priority: Category: Main Component:

Released for Customer 06.01.2003 13:08:00 German Recommendations/additional info Consulting LO-MD-MM Material Master

The Note is release-independent

Related Notes Number 891902 533383 533276 399131

02.06.2009

Short Text FAQ: Batch level Deselecting the batch management requirement indicator Setting the batch management requirement indicator Valuation category changeable despite stock in prev. month

Page 2 of

2