Page 1 of 5 PROCEDURE QUALIFICATION RECORD Reference: ASME B31.3, ASME Sec IX, GASCO Doc No. 5208-RP-300-6300-001 Clien
Views 92 Downloads 8 File size 65KB
Page 1 of 5
PROCEDURE QUALIFICATION RECORD Reference: ASME B31.3, ASME Sec IX, GASCO Doc No. 5208-RP-300-6300-001 Client :
Contractor:
Sub Contractor:
Project Name: OGD III (Subcontract: PME - Offsites & Utilities)
PQR No: WPS No.:
Subcontract No: 25113-000-HC3-P00Z-00004
Rev: 0 Rev: 0
Date: Date:
Welding Process: SMAW Types (Manual, Automatic, Semi-Auto): Manual JOINTS DESIGN:(QW-402)
10.97 mm
PQR Test Coupon: 6" x SCH 80 (10.97mm)
BASE METAL(QW-403)
POSTWELD HEAT TREATMENT(QW-407)
Material Spec.: ASTM A106 (Pipe)
Heating Method: NA
Type or Grade: Gr. B
Heating Rate: NA
P.No. / Group No.: P.No: 1 , Group No: 1
Soaking Temp: NA
Thickness of Test Coupon: 10.97mm
Soaking Time: NA
Dia of Test Coupon: 6" (168.3mm)
Cooling Rate: NA GAS: PERCENTAGE COMPOSITION (QW-408)
Heat No: Pipe - 59B5452 Material Certificate No: Pipe - 040000813205 (MITTAL)
FILLER METALS (QW-404)- See Table - Page 2 of 3
Gas(es) % Comp.
Flow Rate
Shielding
NA
NA
NA
Trailing
NA
NA
NA
Backing
NA
NA
NA
POSITION (QW -405)
ELECTRICAL CHARACTERISTICS (QW-409)
Position of Groove: 6G
Current & Polarity: DCEP
Position of Fillet: NA
Amps / Volts: See Page 2 of 3
Weld Progression (Uphill, Downhill): Uphill
Tungsten Electrode Class & Size: NA
PREHEAT (QW - 406)
TECHNIQUE (QW-410)
Preheat Temp. (Min): N/A
Travel Speed: See Page 2 of 3
Method of Heating: N/A
String or Weave Bead: String on Root, Weave - Fill & Cap
Temp. Monitoring Method: Digital Thermometer Interpass Temp.(In Degree Centigrade):
Oscillation: N/A
Minimum Recorded: 89
Single or Multiple Electrodes: Single Electrode
Maximum Recorded : 125
Multipass or Single Pass (Per Side): Multiple Pass
Page 2 of 5
PROCEDURE QUALIFICATION RECORD Reference: ASME B31.3, ASME Sec IX, GASCO Doc No. 5208-RP-300-6300-001 Client :
Contractor:
Sub Contractor:
Project Name: OGD III (Subcontract: PME - Offsites & Utilities)
PQR No:
Subcontract No: 25113-000-HC3-P00Z-00004
Rev: 0
Date:
FILLER METALS Weld AWS Class Dia (mm) Pass No.
SFA
1
E 6010
3.2
5.1
2
E 7018
3.2
5.1
3
E 7018
3.2
5.1
4
E 7018
4.0
5.1
5
E 7018
4.0
5.1
6
E 7018
3.2
5.1
7
E 7018
3.2
5.1
8
E 7018
3.2
5.1
F.No. A.No. 3 1 4 1 4 1 4 1 4 1 4 1 4 1 4 1
Manufacture
Trade Name
Lot No.
Certificate No.
ESAB
PIPEWELD
VT532E66 88
023530
ESAB
Ok 48.00 SF604303
EC20330164
ESAB
Ok 48.00 SF604303
EC20330164
ESAB
Ok 48.00 SF603207
EC20323739
ESAB
Ok 48.00 SF603207
EC20323739
ESAB
Ok 48.00 SF604303
EC20330164
ESAB
Ok 48.00 SF604303
EC20330164
ESAB
Ok 48.00 SF604303
EC20330164
SUMMARY OF WELDING PARAMETERS RECORDED WELD PASS PROCESS NO. Root-1 Hot-2 Fill-3 Fill-4 Fill-5 Cap-6 Cap-7 Cap-8 S.No.
SMAW SMAW SMAW SMAW SMAW SMAW SMAW SMAW
FILLER METAL AWS CLASS DIA E 6010 3.2 E 7018 3.2 E 7018 3.2 E 7018 4.0 E 7018 4.0 E 7018 3.2 E 7018 3.2 E 7018 3.2
Type of Inspection
TRAVEL Heat Input SPEED KJ / mm mm / min
CURRENT TYPE AND POLARITY DCEP DCEP DCEP DCEP DCEP DCEP DCEP DCEP
Amps 75.9 107.1 120.3 132.9 128.5 113.2 115.4 112.9
VOLTS 24.5 25.0 25.2 24.9 24.0 23.5 24.0 23.6
79.8 109.8 102.6 120.6 96.0 138.6 156.0 144.0
1.40 1.45 1.76 1.63 1.92 1.15 1.06 1.11
Report No.
Date
Result
Visuals O.K.
2-May-2006
Accepted
1
Visual Inspection
2
Magnetic Particle Inspection
PLL/BECHTEL/GASCO/21
5-May-2006
Accepted
3
Radiographic Inspection
PLL/BECHTEL/GASCO/19
5-May-2006
Accepted
4
Ultrasonic Inspection
N/A
-
-
5. TENSILE TEST -(QW-150) Report No.: PHY-RPT-1644-01 dt 15th May 2006 Specimen No.
TT1
Size, (mm)
Area, (mm2)
Tensile Load (N)
19.23 x 10.13
194.80
103223
Tensile Strength Fracture Location (N/mm2) 530 PARENT METAL
Page 3 of 5
PROCEDURE QUALIFICATION RECORD Reference: ASME B31.3, ASME Sec IX, GASCO Doc No. 5208-RP-300-6300-001 Client :
Contractor:
Sub Contractor:
Project Name: OGD III (Subcontract: PME - Offsites & Utilities)
PQR No: TT2
Subcontract No: 25113-000-HC3-P00Z-00004
Rev: 0 19.08 x 10.28
196.14
99669
Date: 508
PARENT METAL
Page 4 of 5
PROCEDURE QUALIFICATION RECORD Reference: ASME B31.3, ASME Sec IX, GASCO Doc No. 5208-RP-300-6300-001 Client :
Contractor:
Sub Contractor:
Project Name: OGD III (Subcontract: PME - Offsites & Utilities)
PQR No:
Subcontract No: 25113-000-HC3-P00Z-00004
Rev: 0
Date:
6. GUIDED - BEND TESTS (QW-160) - Report No.:PHY-RPT-1644-01 dt 15th May 2006 Angel of Bend Specimen TYPE Mandrel Diameter No. (Degrees) SB1 SIDE BEND 4T 180 SB2 SIDE BEND 4T 180 SB3 SIDE BEND 4T 180 SB4 SIDE BEND 4T 180 7. TOUGHNESS TESTS (QW-170) - REPORT No.: Test Impact Values (Joules) Specimen Notch Specimen Temp.OC No. Location Size,(mm) A B C
Result PASS PASS PASS PASS
Remarks
Date Laboratory ### LONESTAR, ABU DHABI ### LONESTAR, ABU DHABI
Result Accepted Accepted
_N /A _
Average (Joules)
8. OTHER TESTS: S.No. 1 2 3
Type of Inspection Macro Examination Micro Examination Hardness Test
Report No. PHY-RPT-1660/1661-01 N/A PHY-RPT-1648/1649-01
OTHER DETAILS: Weld Finishing: As Welded (Wire Brushed) Number of Welders: One Tack Welding Method: Temp. Bar / Bridge Tack Welds Tack Welding Parameters: As per fill pass Welder's Name(s): Sukumar Debnath
Test Conducted By:LONESTAR
Welder ID: PLU - 35
Test Witnessed By:PLL,VELOSI,BECHTEL,GASCO
Test Coupon Welded on: 02-May-2006 We certify that the Statements in this record are correct and that test welds were prepared, welded and tested in accordance with the requirments of ASME Section IX & GASCO Spec: 5208-RP-300-6300-001 PLL QC Name, Signature & Date
EBCL QC Name, Signature & Date
GASCO Name, Signature & Date
Page 5 of 5
PROCEDURE QUALIFICATION RECORD Reference: ASME B31.3, ASME Sec IX, GASCO Doc No. 5208-RP-300-6300-001 Client :
Contractor:
Sub Contractor:
Project Name: OGD III (Subcontract: PME - Offsites & Utilities)
PQR No:
Subcontract No: 25113-000-HC3-P00Z-00004
Rev: 0
Date: