P345 Relay Test Report

ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page Generator Protection Relays Site Test Report Manufacturer ALSTOM C

Views 166 Downloads 3 File size 879KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 1. RELAY DATA RATINGS: Current

1/5 A

Model No.

P345311K3N0360K

Voltage

100-120VAC

S. No.

965449T

Frequency

60Hz

Software Ref.

360K

2. CHECKS S. No. on module, case and cover are identical Relay case connected to a local earth bar

3. WATCHDOG RELAY CHECK Check status of watchdog contacts as below Contact Status

Terminals

Remarks

Relay De- energized

Relay Energized

M11-M12

Closed

Open

OK

M13-M14

Open

Closed

OK

4. FIELD VOLTAGE Measure the field voltage across M7 (+) and M9 (-)…… .49.19VDC.……… (Check that the voltage is about 48V DC) Repeat the test for terminals M8 (+) and M10 (-) …………49.21VDC………..

INSTRUMENT NAME: CMC-256 SERIAL NO: CD749G CALIBRATION DATE: 07-03-13

ALSTOM Grid

Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

1 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

2 of 16

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 5. MECHANICAL CHECKS AND VISUAL INSPECTION: Result Ok (Y/N) Y

Sl.no

General checks

1.

Inspect for no physical damage.

2.

Verify the wiring connection as per approved drawing.

Y

3.

Relay case connected to a local earth bar.

Y

4.

Confirm ring type lugs are used for CT/VT and DC circuits.

Y

5.

Power up the relay circuit and check relay is healthy. Send the relay setting configuration file to relay through Front RS232 communication Port. Relay Test ID on front label and the serial number in the display match.

Y

6. 7.

Y Y

6. OPTO-COUPLER STATUS This is to verify the healthiness of the DC Opto inputs. - Apply a rated voltage at each spare binary input and verify the status of the input at Front panel. - Opto Inputs status can be monitored using front LCD “System Data “. Scroll down “System Data “ to Opto input status , using the bit correlates to under test.

-

Key. Use

key to identify which

Note: Only spare inputs shall be checked with external voltage initiation and other inputs shall be checked during respective functional test. OPTO Input No.

Terminal

OPTO 01 OPTO 02 OPTO 03 OPTO 04 OPTO 05 OPTO 06 OPTO 07 OPTO 08 OPTO 09 OPTO 010 OPTO 011 OPTO 012 OPTO 013 OPTO 014 OPTO 015 OPTO 016

E1-E2 E3-E4 E5-E6 E7-E8 E9-E10 E11-E12 E13-E14 E15-E16 G1-G2 G3-G4 G5-G6 G7-G8 G9-G10 G11-G12 G13-G14 G15-G16 ALSTOM Grid

Configuration CB OPEN SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

Result OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

3 of 16

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 7. LED CHECK Check the operation of all LED’s on the relay front panel LED No.

Allocation

Result

LED 01

REVERSE POWER

LED 02

FIELD FAILURE

LED 03

NPS THERMAL

LED 04

GEN. DIFFERENTIAL

LED 05

ROTOR EARTH FAULT

LED 06

100% STATOR EARTH FAULT

LED 07

UNDER VOLTAGE

LED 08

OVER VOLTAGE

OK OK OK OK OK OK OK OK

Function Keys LEDS check: LED No.

Allocation

FN LED 01

UNDER FREQUENCY

FN LED 02

CBF TRIP

FN LED 03

VOLTAGE BALANCE

FN LED 04

Vdep OVER CURRENT

FN LED 05

OVER FLUX(V/Hz)

FN LED 06

DEAD MACHINE 52G CB OPEN SPARE 52G CB CLOSE ANY START

FN LED 07 FN LED 08 FN LED 09 FN LED 10

Result

OK OK OK OK OK OK OK OK OK OK

8. OUTPUT RELAY CHECKS This is to verify the healthiness of the Control output relay healthiness. Operate each Spare output through “ Commissioning Test “ on front LCD, Check continuity of the contact that closes. -

Scroll to “Commissioning Test “, use to test mode. Change “Test Mode“ to Contact Blocked. Under Test pattern identify the output to close. “Apply Test” using the “ Contact test” option. Reset the output relays by setting cell [COMMISSIONING TESTS, Contact Test] to “Remove Test”.

Note: Only spare outputs shall be checked using above procedure and other Outputs shall be checked during respective functional test.

ALSTOM Grid

Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 Output Relay No.

Terminal

Configuration(IEC NO.S)

RL 1 RL 2

L1-L12 L3-L4

60 27

RL 3

L5-L6

87G,64S

RL 4

L7-L8

59,81,32,64R & 46

RL 5

L9-L10

51-27 & 40

RL 6

L11-L12

40

RL 7

L13-L14-L15

46

RL 8

L16-L17-L18

87G

RL 9

K1-K2

51-27

RL 10

K3-K4

81

RL 11

K5-K6

64S

RL 12

K7-K8

59

RL 13

K9-K10

64R

RL 14

K11-K12

81

RL 15

K13-K14-K15

64B

RL 16

K16-K17-K18

32

RL 17 RL 18 RL 19

J1-J2 J3-J4 J5-J6

CBF CBF CBF

RL 20

J7-J8

CBF

RL 21

J9-J10

CBF

RL 22

J11-J12

CBF

RL 23

J13-J14-J15

60

RL 24 RL 25

J16-J17-J18

59

H1-H2

27

RL 26

H3-H4

81

RL 27

H5-H6

51-27

RL 28

H7-H8

46

RL 29

H9-H10

40

RL 30

H11-H12

32

RL 31

H13-H14-H15

GENERAL ALARM

RL 32

H16-H17-H18

ANY TRIP

ALSTOM Grid

Result

OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

4 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

5 of 16

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 9. MEASUREMENT CHECK Note: - This test is intended to verify the CT/VT inputs and CT Ratio, VT Ratio setting in the local relay. - During the injection on one phase, the LCD will show that the angle of that phase changing randomly but angle measurement is not required. When inject 3ph current, the LCD will display correct angles. VTR:

14.4kV/120V

//

CTR:

2000/1 A

APPLIED & MEASURED CURRENT: , Current Applied: 1.0 A, Tolerance +5% Applied Ph-Current

Expected Current

Measured Current

Result Ok (Y/N)

IA-1

2000 A

2005 A

Y

IB-1

2000 A

2005 A

Y

IC-1

2000 A

2005 A

Y

IA-2

2000 A

2006 A

Y

IB-2

2000 A

2005 A

Y

IC-2

2000 A

2005 A

Y

IN-1

IN-2

2004 A

2000 A

2006 A

Y

APPLIED & MEASURED VOLTAGE: Voltage Applied: V ( Ph-N) AC, Tolerance +5% Applied PhVoltage

Result Ok (Y/N)

Measured Values (Applicable only for 230kV) PHASE AN MAG Ιs2

PHASE

I1

I2

IRESTRAIN

Expected IDIFF

Measured IDIFF

A

1.0

1.411

1.205

0.408

0.413

B

2.0

8.416

5.231

6.446

6.447

C

3.0

1.22

2.11

1.77

1.78

10.4 Operating Time Test With DT Characteristic: Operating Time at I = 1A

T = 0 Sec

Phase

A

B

C

Expected Value

Operating Time

21.2 mSec

18.6 mSec

20.7 mSec

< 40 m Sec

11. 100% STATOR EAERTH FAULT PROTECTION Enabled Element: VN 3RD HARMONIC -VN3H< 1V

Characteristic: DT Delay Time: 1 sec

11.1 PICKUP TEST

Phase

Measured Pick-up

Measured Drop-off

VN3H
1 Function V>1 Voltage Set V>1 Time Delay

1 2 3 4 5

Phase-Phase Any Phase DT 127 V 2.00 Sec

13.1.1 Stage-I Overvoltage Pickup Check: Phase Reference

Voltage Setting

Operated Voltage

AB BC CA

127 127 127

127.1 127.1 127.1

ALSTOM Grid

Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

9 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 13.1.2 Stage-I Operating Time Check: Phase Reference

Applied Voltage (V)

AB BC CA

127 127 127

Measured Operating Time

2.033 sec 2.034 sec 2.031 sec

13.2 Undervoltage Protection: Item

Description

1 2 3 4 5 6

Setting

V< Measurement Mode V< Operate Mode V1 Current Set I2>1 Time Delay I2>2 Trip I2>2 Current Set I2>2 k Set I2>2 kRESET I2>2 tMAX I2>2 tMIN

Enabled 40 mA 5 Sec Enabled 70 mA 3.8 sec 3.8 sec 500 sec 6.0 sec

15.1.1 Thermal NPS Alarm Function Check: I2>1 Alarm set (mA) 40 mA

Pickup Value (mA) 41 mA

I2>1 Alarm set (sec) 5 sec

I2>1 Alarm (sec) 5.059sec

15.1.3 Thermal NPS Tripping Function Check: Note: The negative phase sequence thermal characteristic is given as

Injected I2 Current (A) 140mA

Expected Operating Time 223.09 Sec

ALSTOM Grid

Measured Operating Time 223.1 sec Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

11 of 16

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

12 of 16

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 16. LOSS OF EXCITATION PROTECTION (40) 16.1 Alarm Function Checks: Item Description 1 FFail Alm Status 2 FFail Alm Angle 3 FFail Alm time delay



Setting Enabled 15.00 deg 5 sec

Alarm observed when the injected fault Impedance above 9.5 set V Dep OC Delay V Dep OC tRESET V Dep OC V V) 0.810 A

ALSTOM Grid

tI> sec 1.522 sec

Remarks Najran Power Plant –SEC-SOA

Signature Name Date

LAKSHMANAN PAULRAJ 16-10-12

ENGR. MOHAMMED A. ALMAKRAMI 16-10-12

ALSTOM/PRT/RELAYS/P345_Final Setting

REV-00

Page

Generator Protection Relays Site Test Report Manufacturer

ALSTOM

Consultant

SEC-SOA

Equipment

MiCOM P345

Contract #

41021031/00

Designation

MAIN-1

Contractor

ALSTOM

Test date Name of Bay

16-10-2012 PP Name NAJRAAN P/P GENERAT.N˚3 REMOTE CONTROL BOARD

FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345 Vs < V