Metrado Vivienda Unifamiliar Final

Item Descripción 1.00 1.01 1.02 2.00 2.01 2.02 3.00 3.01 3.02 3.03 3.04 4.00 4.01 4.02 4.03 5.00 OBRAS PROVICIONALES

Views 159 Downloads 1 File size 681KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Item

Descripción

1.00 1.01 1.02 2.00 2.01 2.02 3.00 3.01 3.02 3.03 3.04 4.00 4.01 4.02 4.03 5.00

OBRAS PROVICIONALES

Und.

Metrado

Precio S/.

CASETA DE GUARDIANIA Y ALMACEN

GLB

1.00

600.00

CERCO PERIMETRICO CON ARPILLERA

ML

50.24

20.20

LIMPIEZA DEL TERRENO

M2

119.87

1.05

TRAZO NIVEL Y REPLANTEO

M2

119.87

1.68

EXCAVACION DE CIMIENTOS CORRIDOS Fc= 100 Kg/cm2

M3

86.23

28.00

EXCAV MANUAL ZAPATAS

M3

12.62

28.00

RELLENO COMPACTADO M/PROPIO (zanjas y zapatas)

M3

9.55

13.9

ELIMINACION MATERIAL EXCEDENTE

M3

107.16

18

CIMIENTOS CORRIDOS Y SUB ZAPATAS F'c = 100 Kg / cm2

M3

80.17

156.90

SOBRECIMIENTOS F'c = 175 Kg / cm2

M3

2.79

222.98

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

M2

37.49

17.00

TRABAJOS PRELIMINARES

MOVIMIENTO DE TIERRAS

OBRAS CONCRETO SIMPLE

OBRAS DE CONCRETO ARMADO ZAPATAS

5.01 5.02 5.03

ZAPATAS F'c = 210 Kg / cm2

M3

4.42

351.48

ENCOFRADO ZAPATAS

M2

4.06

17.00

ACERO ZAPATAS F'y 4200 Kg/cm2

Kg

91.58

5.05

5.04 5.05 5.06

VIGAS DE CIMENTACION f'c=210kg/cm"

M3

1.34

303.15

ENCOFRADO DE VIGAS DE AMARRE

M2

17.87

17

ACERO VIGAS DE CIMENTACION F'y =4200 Kg/cm2

Kg

199.83

5.05 351.48

VIGAS DE CIMENTACION

COLUMNAS

5.07 5.08 5.09

COLUMNAS CONCRETO F'c =210kg/cm"

M3

17.39

ENCOFRADO Y DESENCOF. EN COLUMNAS

M2

225.98

21

ACERO EN COLUMNAS F'y 4200 Kg/cm2

Kg

2898.16

5.05

VIGAS CONCRETO F'c =210kg/cm"

M3

11.53

351.48

ENCOFRADO Y DESENCOF. EN VIGAS

M2

75.13

21.00

ACERO EN VIGAS F'y 4200 Kg/cm2

Kg

1404.16

5.05

VIGAS

5.10 5.11 5.12

LOSAS ALIGERADAS

5.13 5.14 5.15 5.16

LOSAS ALIGERADAS CONCRETO f'C=210kg/cm"

M3

10.98

351.48

ENCOFRADO - DESENCOF. EN LOSAS ALIGERADAS

M2

127.98

24.27

LADRILLO HUECO 15X30X30 CM P/TECHO ALIGERADO

M2

1087.83

3.22

ACERO EN LOSAS ALIGERADAS F'y 4200 Kg/cm2

Kg

943.85

5.05

ESCALERAS

5.17 5.17 5.18 6.00

ESCALERAS f'C=175kg/cm"

M3

5.66

351.48

ESCALERAS ENCOFRADO Y DESENCOFRADO

M2

40.55

21.00

ACERO EN ESCALERAS F'y 4200 Kg/cm2

Kg

336.75

5.05

MUROS Y TABIQUES DE ALBAÑILERIA

6.01

M2

MURO DE LADRILLO KK DE ARCILLA SOGA

223.98

54.86

COSTO DIRECTO GASTOS GENERALES Y UTILIDADES 8% TOTAL PRESUPUESTO

PRESUPUESTO 01 PRIMER NIVEL HASTA CASCO GRIS INSUMOS 1.00 MANO DE OBRA

33,142.17

35%

2.00 MATERIALES

57,762.08

61%

3.00 HERRAMIENTAS Y EQUIPOS COSTO DIRECTO

S/.

3,787.68

4%

94,691.93

100%

Parcial S/. 1,614.85

600.00 1014.85

0.00

0.00

NOTENGO COSTO SIQUIERAS LO DEJAS 327.24

125.86 201.38 4,829.33

2414.53 353.22 132.75 1928.83 13,838.25

12578.04 622.92 637.30 2,083.35

1551.87 69.02 462.46 1,719.31

406.34 303.82 1009.14

CHEQUEA 25,493.38

6112.18 4745.50 14635.70 12,722.68

4054.04 1577.63 7091.01 15,234.87

3859.57 3106.07 3502.81 4766.42 4,541.00

1988.81 851.62 1700.58 12287.67

12287.67

S INSUMOS

94,691.93 8,522.27

S/.

103,214.20

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

1.00 1.01 1.02

2.00 2.01

2.02

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

OBRAS PROVICIONALES CASETA DE GUARDIANIA Y ALMACEN CERCO PERIMETRICO CON ARPILLERA (considerar 50 cm en cada lado) FACHADA LADO DERECHO LADO IZQUIERDO FONDO

1

1.00 mas 1 m X lado 1.000 1.000 1.000 1.000

8.85 16.27 16.27 8.85

TRABAJOS PRELIMINARES LIMPIEZA DEL TERRENO AREA

AREA TOTAL TERRENO

119.87

TRAZO NIVEL Y REPLANTEO AREA

AREA TOTAL TERRENO

119.87

3.00

MOVIMIENTO DE TIERRAS

3.01

EXCAVACION DE CIMIENTOS CORRIDOS Fc= 100 Kg/cm2

1 1 1 1

7.850 15.270 15.270 7.850

CC-2 EJE A ( 1 - 2 )

1

0.700

0.700

1.900

0.93

CC-3 EJE A' (4 - 5 )

1

2.850

0.500

1.400

2.00

CC-2 EJE B (1 - 2 )

1

0.660

0.700

1.900

0.88

CC-3 EJE B ( 2 - 5)

1

4.480

0.500

1.400

3.14

CC-4 EJE B' ( 3 - 5)

1

3.430

0.500

1.400

2.40

CC-3 EJE C ( 1- 2)

1

2.000

0.500

1.400

1.40

CC-2 EJE C ( 4- 5 )

1

2.070

0.700

1.900

2.75

CC-4 EJE C' ( 4- 5 )

1

1.300

0.500

1.400

0.91

CC-3 EJE D ( 1- 2 )

1

2.000

0.500

1.400

1.40

CC-2 EJE D ( 4- 5 )

1

2.290

0.700

1.900

3.05

CC-3 EJE E (1- 5 )

1

4.760

0.500

1.400

3.33

CC-5 EJE F (1- 5 )

1

7.050

0.400

1.000

2.82

CC-1 EJE 1 ( A- E )

1

13.320

0.700

1.900

17.72

CC-1 EJE 1 ( B )

1

1.200

0.250

1.900

0.57

CC-1 EJE 1 ( E)

1

1.000

0.500

1.900

0.95

CC-5 EJE 1 ( F)

1

1.950

0.400

1.000

0.78

CC-2 EJE 2 (A - B)

1

4.700

0.700

1.900

6.25

CC-2 EJE 2 (A)

1

1.000

0.580

1.900

1.10

CC-2 EJE 2 (B)

1

1.200

0.370

1.900

0.84

CC-3 EJE 3 ( B- C)

1

0.800

0.500

1.400

0.56

CC-2 EJE 4 (B-E)

1

6.680

0.700

1.900

8.88

CC-2 EJE 4 (C)

1

1.000

0.450

1.900

0.86

CC-2 EJE 4 (C')

1

1.100

0.570

1.900

1.19

CC-1 EJE 5 (A-E)

1

13.320

0.700

1.900

17.72

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

CC-1 EJE 5 (A)

1

1.600

0.150

1.900

0.46

CC-1 EJE 5 (C`)

1

1.100

0.300

1.900

0.63

CC-1 EJE 5 (E

1

1.000

0.500

1.900

0.95

CC-5 EJE 5( F)

1

1.950

0.400

1.000

0.78 85.23

EXCAVACION DE CIMIENTO PARA ESCALERA ESCALERA 1 (A - B)

1

1.000

0.500

1.000

0.50

ESCALERA 1 (C)

1

1.000

0.500

1.000

0.50 1.00

3.02

EXCAV MANUAL ZAPATAS ZAPATA 01

3.03

3

1.450

1.450

2.000

12.62

CC-2 EJE A ( 1 - 2 )

1

0.700

0.550

0.100

0.04

CC-3 EJE A' (4 - 5 )

1

2.850

0.150

0.300

0.13

CC-2 EJE B (1 - 2 )

1

0.660

0.550

0.100

0.04

CC-3 EJE B ( 2 - 5)

1

4.480

0.350

0.300

0.47

CC-4 EJE B' ( 3 - 5)

1

3.430

0.350

0.100

0.12

CC-3 EJE C ( 1- 2)

1

2.000

0.350

0.300

0.21

CC-2 EJE C ( 4- 5 )

1

2.070

0.550

0.100

0.11

CC-4 EJE C' ( 4- 5 )

1

1.300

0.350

0.100

0.05

CC-3 EJE D ( 1- 2 )

1

2.000

0.350

0.300

0.21

CC-2 EJE D ( 4- 5 )

1

2.290

0.550

0.100

0.13

CC-3 EJE E (1- 5 )

1

4.760

0.350

0.300

0.50

CC-5 EJE F (1- 5 )

1

7.050

0.250

0.100

0.18

CC-1 EJE 1 ( A- E )

1

13.320

0.550

0.100

0.73

CC-1 EJE 1 ( B )

1

1.200

0.250

0.100

0.03

CC-1 EJE 1 ( E)

1

1.000

0.500

0.100

0.05

CC-5 EJE 1 ( F)

1

1.950

0.250

0.100

0.05

CC-2 EJE 2 (A - B)

1

4.700

0.550

0.100

0.26

CC-2 EJE 2 (A)

1

1.000

0.580

0.100

0.06

CC-2 EJE 2 (B)

1

1.200

0.370

0.100

0.04

CC-4 EJE 3 ( B- C)

1

0.800

0.350

0.100

0.03

CC-2 EJE 4 (B-E)

1

6.680

0.550

0.100

0.37

CC-2 EJE 4 (C)

1

1.000

0.450

0.100

0.05

CC-2 EJE 4 (C')

1

1.100

0.570

0.100

0.06

CC-1 EJE 5 (A-E)

1

13.320

0.550

0.100

0.73

CC-1 EJE 5 (A)

1

1.600

0.150

0.100

0.02

CC-1 EJE 5 (C`)

1

1.100

0.300

0.100

0.03

CC-1 EJE 5 (E

1

1.000

0.500

0.100

0.05

RELLENO COMPACTADO M/PROPIO (zanjas)

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

CC-5 EJE 5( F)

1

1.950

0.250

0.100

0.05 4.79

3.04

3.05

ELIMINACION MATERIAL ZAPATAS

Area relleno

ZAPATA (Columna Rec)

1

1.000

1.953

0.800

1.56

ZAPATA (Columna Cir)

2

1.000

2.000

0.800

3.20

Excav.

Rellen.

1

98.848

9.551

CC-2 EJE A ( 1 - 2 )

1

0.700

0.700

1.800

0.88

CC-3 EJE A' (4 - 5 )

1

2.850

0.500

1.000

1.43

CC-2 EJE B (1 - 2 )

1

0.660

0.700

1.800

0.83

CC-3 EJE B ( 2 - 5)

1

4.480

0.500

1.000

2.24

CC-4 EJE B' ( 3 - 5)

1

3.430

0.500

1.000

1.72

CC-3 EJE C ( 1- 2)

1

2.000

0.500

1.000

1.00

CC-2 EJE C ( 4- 5 )

1

2.070

0.700

1.800

2.61

CC-4 EJE C' ( 4- 5 )

1

1.300

0.500

1.000

0.65

CC-3 EJE D ( 1- 2 )

1

2.000

0.500

1.000

1.00

CC-2 EJE D ( 4- 5 )

1

2.290

0.700

1.800

2.89

CC-3 EJE E (1- 5 )

1

4.760

0.500

1.000

2.38

CC-5 EJE F (1- 5 )

1

7.050

0.400

0.900

2.54

CC-1 EJE 1 ( A- E )

1

13.320

0.700

1.800

16.78

CC-1 EJE 1 ( B )

1

1.200

0.250

1.800

0.54

CC-1 EJE 1 ( E)

1

1.000

0.500

1.800

0.90

CC-5 EJE 1 ( F)

1

1.950

0.400

0.900

0.70

CC-2 EJE 2 (A - B)

1

4.700

0.700

1.800

5.92

CC-2 EJE 2 (A)

1

1.000

0.580

1.800

1.04

CC-2 EJE 2 (B)

1

1.200

0.370

1.800

0.80

CC-4 EJE 3 ( B- C)

1

0.800

0.500

1.000

0.40

CC-2 EJE 4 (B-E)

1

6.680

0.700

1.800

8.42

CC-2 EJE 4 (C)

1

1.000

0.450

1.800

0.81

CC-2 EJE 4 (C')

1

1.100

0.570

1.800

1.13

CC-1 EJE 5 (A-E)

1

13.320

0.700

1.800

16.78

CC-1 EJE 5 (A)

1

1.600

0.150

1.800

0.43

ELIMINACION MATERIAL EXCEDENTE Excavacion total menos relleno+20% esponjam

4.00

OBRAS CONCRETO SIMPLE

4.01

CIMIENTOS CORRIDOS Y SUB ZAPATAS F'c = 100 Kg / cm2

20% Expon 89.30

107.16

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

CC-1 EJE 5 (C`)

1

1.100

0.300

1.800

0.59

CC-1 EJE 5 (E

1

1.000

0.500

1.800

0.90

CC-5 EJE 5( F)

1

1.950

0.400

0.900

0.70

ZAPATAS

3

1.450

1.450

0.500

3.15

77.01 3.15

4.02

SOBRECIMIENTOS F'c = 175 Kg / cm2 CC-2 EJE A ( 1 - 2 )

1

1.250

0.150

0.400

0.08

CC-2 EJE B (1 - 2 )

1

0.810

0.150

0.400

0.05

CC-4 EJE B' ( 3 - 5)

1

4.150

0.150

0.400

0.25

CC-2 EJE C ( 4- 5 )

1

1.300

0.150

0.400

0.08

CC-4 EJE C' ( 4- 5 )

1

1.300

0.150

0.400

0.08

CC-2 EJE D ( 4- 5 )

1

1.300

0.150

0.400

0.08

CC-5 EJE F (1- 5 )

1

6.950

0.150

0.400

0.42

CC-1 EJE 1 ( A- F )

1

11.620

0.150

0.400

0.70

CC-2 EJE 2 (A - B)

1

2.200

0.150

0.400

0.13

CC-4 EJE 3 ( B- C)

1

0.750

0.150

0.400

0.05

CC-2 EJE 4 (B-E)

1

3.400

0.150

0.400

0.20

CC-1 EJE 5 (A-E)

1

11.530

0.150

0.400

0.69 2.79

4.05

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO CC-2 EJE A ( 1 - 2 )

2

1.250

0.000

0.400

1.00

CC-2 EJE B (1 - 2 )

2

0.810

0.000

0.400

0.65

CC-4 EJE B' ( 3 - 5)

2

4.150

0.000

0.400

3.32

CC-2 EJE C ( 4- 5 )

2

1.300

0.000

0.400

1.04

CC-4 EJE C' ( 4- 5 )

2

1.300

0.000

0.400

1.04

CC-2 EJE D ( 4- 5 )

2

1.300

0.000

0.400

1.04

CC-5 EJE F (1- 5 )

2

6.950

0.000

0.400

5.56

CC-1 EJE 1 ( A- F )

2

11.620

0.000

0.400

9.30

CC-2 EJE 2 (A - B)

2

2.200

0.000

0.400

1.76

CC-4 EJE 3 ( B- C)

2

0.750

0.000

0.400

0.60

CC-2 EJE 4 (B-E)

2

3.400

0.000

0.400

2.72

CC-1 EJE 5 (A-E)

2

11.530

0.000

0.400

9.22

Tapas de sobrecimientos

1

0.600

0.000

0.400

0.24 37.49

5.00

OBRAS DE CONCRETO ARMADO

5.01

ZAPATAS f' c = 210 Kg / cm2

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

5.02

5.04

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

Z-1

3

1.450

ENCOFRADO ZAPATAS Z-1

1

5.800

1.450

0.700

4.42

0.700

4.06

VIGAS DE CIMENTACION f'c=210kg/cm" CC-3 EJE A' (4 - 5 )

1

4.150

0.150

0.400

0.25

CC-3 EJE B ( 2 - 5)

1

5.290

0.150

0.400

0.32

CC-3 EJE C ( 1- 2)

1

3.950

0.150

0.400

0.24

CC-3 EJE D ( 1- 2 )

1

3.950

0.150

0.400

0.24

CC-3 EJE E (1- 5 )

1

5.000

0.150

0.400

0.30 1.34

5.05

ENCOFRADO DE VIGAS DE AMARRE CC-3 EJE A' (4 - 5 )

2

4.150

0.000

0.400

3.32

CC-3 EJE B ( 2 - 5)

2

5.290

0.000

0.400

4.23

CC-3 EJE C ( 1- 2)

2

3.950

0.000

0.400

3.16

CC-3 EJE D ( 1- 2 )

2

3.950

0.000

0.400

3.16

CC-3 EJE E (1- 5 )

2

5.000

0.000

0.400

4.00 17.87

5.06 5.07

ACERO COLUMNAS CONCRETO f'C=210kg/cm" PRIMER NIVEL C1 Zapata C1 Columna C2 C3 (Columna circular) C4 C5 P1 P2 P3-P3-A P4-P5 P6 C-A MURO PERIMETRICO C-A INTERIOR EJE 4

1 1 13 2 2 2 2 1 3 2 2 5 2

0.600 0.600 0.500 A= 0.400 0.250 0.850 0.850 1.000 0.850 0.800 0.150 0.150

0.250 0.250 0.150 0.098 0.150 0.250 0.150 0.200 0.150 0.150 0.200 0.300 0.300

3.325 3.325 2.625 3.325 2.625 2.625 2.625 2.625 2.625 2.625 2.625 3.000 2.625

0.50 0.50 2.56 0.65 0.32 0.33 0.67 0.45 1.18 0.67 0.84 0.68 0.24 9.57

SEGUNDO NIVEL C1 Zapata C2 C4 C5

2 13 4 2

0.600 0.500 0.400 0.250

0.250 0.150 0.150 0.250

2.425 2.425 2.425 2.425

0.73 2.36 0.58 0.30

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

P1 P2 P3-P3-A P4-P5 P6 C-A

2 1 3 2 2 3

0.850 0.850 1.000 0.850 0.800 0.150

0.150 0.200 0.150 0.150 0.200 0.300

2.425 2.425 2.425 2.425 2.425 2.425

0.62 0.41 1.09 0.62 0.78 0.33 7.82

5.08

ENCOFRADO Y DESENCOF. EN COLUMNAS PRIMER NIVEL C1 Zapata C1 Columna C2 C3 (Columna circular) C4 C5 P1 P2 P3-P3-A P4-P5 P6 C-A MURO PERIMETRICO C-A INTERIOR EJE 4

1 1 13 2 2 2 2 1 3 2 2 5 2

1.700 1.550 1.000 1.111 0.800 0.750 1.850 1.900 2.150 1.850 1.650 0.600 0.750

3.325 3.325 2.625 3.325 2.625 2.625 2.625 2.625 2.625 2.625 2.625 3.000 2.625

5.65 5.15 34.13 7.39 4.20 3.94 9.71 4.99 16.93 9.71 8.66 9.00 3.94 123.40

SEGUNDO NIVEL C1 C2 C4 C5 P1 P2 P3-P3-A P4-P5 P6 C-A

2 13 4 2 2 1 3 2 2 3

1.650 1.000 0.800 0.750 1.850 1.900 2.150 1.850 1.650 0.750

2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425

8.00 31.53 7.76 3.64 8.97 4.61 15.64 8.97 8.00 5.46 102.58

5.07

VIGA CONCRETO VIGAS f'C=210kg/cm" PRIMER NIVEL VA-1 EJE A ( 1 - 5) VA-1 EJE B ( 1 - 5) VA-2 EJE C ( 1 - 5) VA-2 EJE C´ ( 1 - 5) VA-1 EJE D ( 1 - 5) VA-1 EJE E ( 1 - 5) VS-1 EJE 1 ( A - E)

1 1 1 1 1 1 1

7.550 7.550 7.550 7.550 7.550 7.550 13.320

0.250 0.250 0.250 0.250 0.250 0.250 0.400

0.200 0.200 0.200 0.200 0.200 0.200 0.150

0.38 0.38 0.38 0.38 0.38 0.38 0.80

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

VS-1 EJE 2 ( A - B) VA-1 EJE 3 (A - E) VA-2 EJE 4 (B - E) VA-2 EJE 4' (C - D) VS-1 EJE 5 ( A - E) VB EJE A (2-5) VB EJE E (1-5) VB EJE C (2-5)

1 1 1 1 1 1 1 1

3.620 11.820 8.050 1.250 13.320 6.350 4.800 1.250

0.400 0.250 0.250 0.250 0.400 0.250 0.300 0.100

0.150 0.200 0.200 0.200 0.150 0.200 0.200 0.200

0.22 0.59 0.40 0.06 0.80 0.32 0.29 0.03 5.77

SEGUNDO NIVEL VA-1 EJE A ( 1 - 5) VA-1 EJE B ( 1 - 5) VA-2 EJE C ( 1 - 5) VA-2 EJE C´ ( 1 - 5) VA-2 EJE D ( 1 - 5) VA-1 EJE E ( 1 - 5) VS-1 EJE 1 ( A - E) VS-1 EJE 2 ( A - B) VA-1 EJE 3 (A - E) VA-2 EJE 4 (B - E) VA-2 EJE 4' (C - D) VS-1 EJE 5 ( A - E) VB EJE A (2-5) VB EJE E (1-5) VB EJE C (2-5)

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7.550 7.550 7.550 7.550 7.550 7.550 13.320 3.620 11.820 8.050 1.250 13.320 6.350 4.800 1.250

0.250 0.250 0.250 0.250 0.250 0.250 0.400 0.400 0.250 0.250 0.250 0.400 0.250 0.300 0.100

0.200 0.200 0.200 0.200 0.200 0.200 0.150 0.150 0.200 0.200 0.200 0.150 0.200 0.200 0.200

0.38 0.38 0.38 0.38 0.38 0.38 0.80 0.22 0.59 0.40 0.06 0.80 0.32 0.29 0.03 5.77

5.08

ENCOFRADO Y DESENCOF. EN VIGAS PRIMER NIVEL VA-1 EJE A ( 1 - 2) VA-1 EJE A ( 2- 5) VA-1 EJE B ( 1 - 2) VA-1 EJE B ( 2 - 5) VA-2 EJE C ( 1 - 4) VA-2 EJE C ( 4 - 5) VA-2 EJE C´ ( 1 - 5) VA-2 EJE C´ ( 1 - 5) VA-1 EJE D ( 1 - 5) VA-1 EJE D ( 1 - 5) VA-1 EJE E ( 1 - 5) VS-1 EJE 1 ( A - E) VS-1 EJE 2 ( A - B) VS-1 EJE 2 ( A - B) VA-1 EJE 3 (A - E) VA-2 EJE 4 (B - E) VA-2 EJE 4' (C - D) VS-1 EJE 5 ( A - E)

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2.100 5.050 2.100 5.050 4.300 3.000 4.300 3.000 4.300 3.000 7.050 13.320 2.600 1.620 11.820 8.050 1.250 13.320

0.100 0.250 0.100 0.250 0.250 0.100 0.250 0.100 0.250 0.100 0.100 0.400 0.400 0.550 0.250 0.250 0.250 0.400

0.21 1.26 0.21 1.26 1.08 0.30 1.08 0.30 1.08 0.30 0.71 5.33 1.04 0.89 2.96 2.01 0.31 5.33

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

VB EJE A (2-5) VB EJE E (1-5) VB EJE C (2-5) TAPAS DE VIGAS

1 1 1 1

6.350 4.800 1.250 43.840

0.250 0.300 0.100 0.200

1.59 1.44 0.13 8.77 37.56

SEGUNDO NIVEL VA-1 EJE A ( 1 - 2) VA-1 EJE A ( 2- 5) VA-1 EJE B ( 1 - 2) VA-1 EJE B ( 2 - 5) VA-2 EJE C ( 1 - 4) VA-2 EJE C ( 4 - 5) VA-2 EJE C´ ( 1 - 5) VA-2 EJE C´ ( 1 - 5) VA-1 EJE D ( 1 - 5) VA-1 EJE D ( 1 - 5) VA-1 EJE E ( 1 - 5) VS-1 EJE 1 ( A - E) VS-1 EJE 2 ( A - B) VS-1 EJE 2 ( A - B) VA-1 EJE 3 (A - E) VA-2 EJE 4 (B - E) VA-2 EJE 4' (C - D) VS-1 EJE 5 ( A - E) VB EJE A (2-5) VB EJE E (1-5) VB EJE C (2-5) TAPAS DE VIGAS

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2.100 5.050 2.100 5.050 4.300 3.000 4.300 3.000 4.300 3.000 7.050 13.320 2.600 1.620 11.820 8.050 1.250 13.320 6.350 4.800 1.250 43.840

0.100 0.250 0.100 0.250 0.250 0.100 0.250 0.100 0.250 0.100 0.100 0.400 0.400 0.550 0.250 0.250 0.250 0.400 0.250 0.300 0.100 0.200

0.21 1.26 0.21 1.26 1.08 0.30 1.08 0.30 1.08 0.30 0.71 5.33 1.04 0.89 2.96 2.01 0.31 5.33 1.59 1.44 0.13 8.77 37.56

5.10

LOSAS ALIGERADAS CONCRETO LOSAS ALIGERADAS f'C=210kg/cm" PRIMER NIVEL LOSAS COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL VIGETAS COMEDOR BARRA

1 1 1 1 1 1 1 1 1 8 8

A= A= A= A= A= A= A= A= A= 3.130 0.900

10.240 2.930 9.750 3.000 10.700 2.880 6.240 15.020 3.230

0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050

0.51 0.15 0.49 0.15 0.54 0.14 0.31 0.75 0.16

0.100 0.100

0.150 0.150

0.38 0.11

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL

8 3 7 11 4 9 9

3.000 2.410 3.130 0.900 3.000 4.150 0.900

0.100 0.100 0.100 0.100 0.100 0.100 0.100

0.150 0.150 0.150 0.150 0.150 0.150 0.150

0.36 0.11 0.33 0.15 0.18 0.56 0.12 5.49

SEGUNDO NIVEL LOSAS COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL VIGETAS COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL

1 1 1 1 1 1 1 1 1 8 8 8 3 7 11 4 9 9

A= A= A= A= A= A= A= A= A= 3.130 0.900 3.000 2.410 3.130 0.900 3.000 4.150 0.900

10.240 2.930 9.750 3.000 10.700 2.880 6.240 15.020 3.230

0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050

0.51 0.15 0.49 0.15 0.54 0.14 0.31 0.75 0.16

0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100 0.100

0.150 0.150 0.150 0.150 0.150 0.150 0.150 0.150 0.150

0.38 0.11 0.36 0.11 0.33 0.15 0.18 0.56 0.12 5.49

5.11

ENCOFRADO - DESENCOF. EN LOSAS ALIGERADAS PRIMER NIVEL COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL

1 1 1 1 1 1 1 1 1

A= A= A= A= A= A= A= A= A=

10.240 2.930 9.750 3.000 10.700 2.880 6.240 15.020 3.230

10.24 2.93 9.75 3.00 10.70 2.88 6.24 15.02 3.23 63.99

SEGUNDO NIVEL

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL

1 1 1 1 1 1 1 1 1

A= A= A= A= A= A= A= A= A=

10.240 2.930 9.750 3.000 10.700 2.880 6.240 15.020 3.230

10.24 2.93 9.75 3.00 10.70 2.88 6.24 15.02 3.23 63.99

5.12

LADRILLO HUECO 15X30X30 CM P/TECHO ALIGERADO PRIMER NIVEL COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL

1 1 1 1 1 1 1 1 1

A= A= A= A= A= A= A= A= A=

10.240 2.930 9.750 3.000 10.700 2.880 6.240 15.020 3.230

8.500 8.500 8.500 8.500 8.500 8.500 8.500 8.500 8.500

87.04 24.91 82.88 25.50 90.95 24.48 53.04 127.67 27.46 543.92

SEGUNDO NIVEL COMEDOR BARRA COCINA DEPOSITO ESTAR PASADIZO BAÑO COCHERA PASADIZO FRONTAL

1 1 1 1 1 1 1 1 1

A= A= A= A= A= A= A= A= A=

10.240 2.930 9.750 3.000 10.700 2.880 6.240 15.020 3.230

8.500 8.500 8.500 8.500 8.500 8.500 8.500 8.500 8.500

87.04 24.91 82.88 25.50 90.95 24.48 53.04 127.67 27.46 543.92

5.14

ESCALERAS f'C=175kg/cm" PRIMER NIVEL ESCALERAS 1 ( A- B) CIMIENTO TRAMO 1 TRAMO 2 ESCALERAS 1 ( C) CIMIENTO TRAMO 1 TRAMO 2

1 1 1

A= A=

1 1 1

A= A=

1.000

0.500 0.479 0.574

1.000 1.050 1.050

0.50 0.50 0.60

1.000

0.500 0.479 0.574

1.000 1.025 1.025

0.50 0.49 0.59

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

ESCALERAS ENCOFRADO Y DESENCOFRADO PRIMER NIVEL ESCALERAS 1 ( A- B) CONTRAPASOS TRAMO 1 ( COSTADO) TRAMO 2 (COSTADO) TRAMO 1 (FONFO) TRAMO 2 (FONDO) ESCALERAS 1 ( C) CONTRAPASOS TRAMO 1 ( COSTADO) TRAMO 2 ( COSTADO) TRAMO 1 (FONFO) TRAMO 2 (FONDO) SEGUNDO NIVEL ESCALERAS 1 ( A- B) CONTRAPASOS TRAMO 3 ( COSTADO) TRAMO 4 ( COSTADO) TRAMO 3 (FONFO) TRAMO 4 (FONDO) ESCALERAS 1 ( C) CONTRAPASOS TRAMO 3 ( COSTADO) TRAMO 4 ( COSTADO) TRAMO 3 (FONFO) TRAMO 4 (FONDO)

6.00 6.01

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

SEGUNDO NIVEL ESCALERAS 1 ( A- B) TRAMO 3 TRAMO 4 ESCALERAS 1 ( C) TRAMO 3 TRAMO 4 5.15

HECHO POR : ESL

MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KK DE ARCILLA SOGA PRIMER NIVEL EJE A ( 1 - 2 ) EJE B (1 - 2 ) EJE B' ( 3 - 5) EJE C ( 4- 5 ) EJE C' ( 4- 5 )

1 1

A= A=

0.596 0.596

1.050 1.050

0.63 0.63

1 1

A= A=

0.596 0.596

1.025 1.025

0.61 0.61

14 1 1 1 1

0.175 0.479 0.574 2.430 3.160

1.050

A= A= A= A=

2.57 0.48 0.57 2.55 3.32

14 1 1 1 1

0.175 0.479 0.574 2.430 3.160

1.025

A= A= A= A=

16 1 1 1 1

0.175 0.596 0.596 3.270 3.270

1.050

A= A= A= A=

16 1 1 1 1

0.175 0.596 0.596 3.270 3.270

1.025

A= A= A= A=

1 1 1 1 1

1.250 0.810 3.850 1.300 1.300

1.050 1.050

1.025 1.025

1.050 1.050

2.51 0.48 0.57 2.49 3.24

2.94 0.60 0.60 3.43 3.43

1.025 1.025

2.87 0.60 0.60 3.35 3.35

2.225 2.225 2.225 2.225 2.225

2.78 1.80 8.57 2.89 2.89

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : Familia Balabarca Muñoz DISTRITO :Mz H Lote 08 Urb, La Catedral - Dist. de Sachaca FECHA : ABRIL 2011 NRO

TITULO DE PARTIDA

PARTIDA

HECHO POR : ESL

NRO

MEDIDAS

SUB

VECES LARGO ANCHO ALTO PARCIAL PARCIAL

EJE D ( 4- 5 ) EJE F (1- 5 ) EJE 1 ( A- F ) EJE 2 (A - B) EJE 3 ( B- C) EJE 4 (B-E) EJE 5 (A-E)

1 1 1 1 1 1 1

1.300 6.950 11.620 2.200 0.750 3.400 11.530

2.225 2.800 2.025 2.225 2.225 2.225 2.025

2.89 19.46 23.53 4.90 1.67 7.57 23.35 102.29

DESCONTANDO VENTANAS 0.8*1.60*0.8 ALF 1.60*1.40*1.00 ALF

-2 -1

0.800 1.600

1.600 1.400

-2.56 -2.24 -4.80

SEGUNDO NIVEL EJE A ( 1 - 2 ) EJE B (1 - 2 ) EJE C ( 4- 5 ) EJE C' ( 4- 5 ) EJE D ( 1- 5 ) EJE 1 ( A- F ) EJE 2 (A - B) EJE 3 ( B- C) EJE 4 (B-E) EJE 5 (A-E) VOLADO VAÑOS

1 1 1 1 1 1 1 1 1 1 2 1

1.250 3.610 1.300 1.300 5.300 11.620 3.120 3.950 4.470 11.530 2.700 1.850

2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425

3.03 8.75 3.15 3.15 12.85 28.18 7.57 9.58 10.84 27.96 13.10 4.49 132.65

DESCONTANDO VENTANAS 0.8*1.60*0.8 ALF 1.80*1.60*0.80 ALF 0.6*0.60* 1.80 ALF

-2 -1 -2

0.800 1.600 0.600

1.600 1.800 0.600

-2.56 -2.88 -0.72 -6.16

TOTAL

UND

1.00

GLB

50.24

ML

119.87

M2

119.87

M2

1011.5

TOTAL

UND

86.23

12.62

M3

TOTAL

UND

9.55

M3

107.16

M3

20% Expon

TOTAL

UND

80.17

M3

2.79

M3

37.49

M2

TOTAL

UND

4.42

M3

4.06

M2

1.34

M3

17.87

M3

2.65 3.125

M3

TOTAL

UND

M3 17.39

M2

225.98

M2 M2

TOTAL

UND

M3

11.5342

M3 M3

TOTAL

UND

M2

M2 75.125

TOTAL

UND

M3

10.9809

M3 M3

M2

TOTAL

UND

127.98

M2 M2

UND

UND 1087.83

TOTAL

UND

5.66

M3

40.55

M2

TOTAL

UND

M2

M2

223.98

M2

HOJA OBRA "VIVIENDA VIVIENDAMULTIFAMILIAR" UNIFAMILIAR

DE

METRADOS

PROPIETARIO : SR. MIGUEL ANGEL HUAMAN Y SRA DISTRITO : HUNTER, PROVINCIA : AREQUIPA, DEPARTAMENTO : AREQUIPA FECHA : ABRIL 2011 HECHO POR : ESL NRO

TITULO DE PARTIDA

5.03

NRO

CADA ELEMENTO

VECES

CANT,

As VERTICAL

3

7

5/8''

1.38

As HORIZONTAL

3

7

5/8''

1.38

PARTIDA

DIAM, LONGIT

LONGITUD TOTAL POR DIAMETRO

3/8''

1/2''

5/8''

3/4''

1/4''

0.00 0.00

0.00 0.00

28.98 28.98 57.96 6.44

0.00 0.00

0.00 0.00

0.00

0.00

91.58

0.00

0.00

ACERO ZAPATAS Z-1

TOTAL ZAPATAS TOTAL VARILLAS TOTAL 5.06

91.58

ACERO VIGAS DE CIMENTACION

CC-3 EJE A' (4 - 5 )

1

6

1/2''

4.75

CC-3 EJE B ( 2 - 5)

1

6

1/2''

5.90

CC-3 EJE C ( 1- 2)

1

6

1/2''

4.50

CC-3 EJE D ( 1- 2 )

1

6

1/2''

4.50

CC-3 EJE E (1- 5 )

1

6

1/2''

5.60

CC-3 EJE A' (4 - 5 )

1

28

1/4''

1.20

CC-3 EJE B ( 2 - 5)

1

39

1/4''

1.20

CC-3 EJE C ( 1- 2)

1

23

1/4''

1.20

CC-3 EJE D ( 1- 2 )

1

23

1/4''

1.20

CC-3 EJE E (1- 5 )

1

38

1/4''

1.20

28.50 35.40 27.00 27.00 33.60

ESTRIBOS

TOTAL ZAPATAS TOTAL VARILLAS

5.06

0.00 0.00

151.50 16.83

0.00 0.00

0.00 0.00

33.60 46.80 27.60 27.60 45.60 181.20 45.30

0.00

154.53

0.00

0.00

45.30

TOTAL

199.83

46.25 44.25

COLUMNAS ACERO PRIMER NIVEL C1 Zapata

1

10

5/8''

4.63

C1 Columna

1

10

5/8''

4.43

C2

13

6

1/2''

4.33

C3

2

4

5/8''

4.33

2

4

1/2''

4.33

C4

2

8

3/8''

4.33

C5

2

4

1/2''

4.33

2

4

3/8''

4.33

2

4

5/8''

4.33

2

4

1/2''

4.33

1

4

5/8''

4.33

1

4

1/2''

4.33

3

8

1/2''

4.33

P1 P2 P3-P3-A

337.74 34.64 34.64 69.20 34.64 34.64 34.64 34.64 17.32 17.32 103.92

NRO

TITULO DE PARTIDA

NRO

CADA ELEMENTO

VECES

CANT,

3

3

3/8''

4.33

P4-P5

2

8

1/2''

4.33

P6

2

8

5/8''

4.33

2

2

1/2''

4.33

C-A MURO PERIMETRICO

5

4

3/8''

3.30

C-A INTERIOR EJE 4

2

4

3/8''

3.40

C1 Zapata

1

34

3/8''

2.30

C1 Columna

1

32

3/8''

2.30

C2

13

33

1/4''

1.45

C3

2

35

1/4''

1.10

C4

2

33

1/4''

1.06

C5

1

33

1/4''

1.00

P1

2

23

3/8''

1.05

2

33

1/4''

0.76

1

23

3/8''

1.05

1

33

1/4''

1.44

3

23

3/8''

0.90

3

33

1/4''

1.20

2

23

3/8''

1.05

2

33

1/4''

0.76

2

23

3/8''

0.65

PARTIDA

DIAM, LONGIT

LONGITUD TOTAL POR DIAMETRO

3/8'' 38.97

1/2''

5/8''

3/4''

1/4''

69.28 69.28 17.32 66.00 27.20

ESTRIBOS

P2 P3-P3-A P4-P5 P6

2

33

1/4''

1.72

C-A MURO PERIMETRICO

5

28

1/4''

0.90

C-A INTERIOR EJE 4

1

28

1/4''

0.90

TOTAL COLUMNAS TOTAL VARILLAS

78.20 73.60 622.05 77.00 69.96 33.00 48.30 50.16 24.15 47.52 62.10 118.80 48.30 50.16 29.90

600.56 66.73

649.50 72.17

246.38 27.38

0.00 0.00

113.52 126.00 25.20 1333.37 148.15

336.31

662.49

389.28

0.00

333.34

TOTAL

1721.43

SEGUNDO NIVEL

62.50

C1

2

10

5/8''

3.13

C2

13

6

1/2''

3.13

C4

4

8

3/8''

3.13

C5

2

4

1/2''

3.13

2

4

3/8''

3.13

2

4

5/8''

3.13

2

4

1/2''

3.13

1

4

5/8''

3.13

1

4

1/2''

3.13

3

8

1/2''

3.13

3

3

3/8''

3.13

P4-P5

2

8

1/2''

3.13

P6

2

8

5/8''

3.13

2

2

1/2''

3.13

3

4

3/8''

10.30

123.60

C1

2

21

3/8''

2.30

96.60

C2

13

22

1/4''

1.45

P1 P2 P3-P3-A

C-A

243.75 100.00 25.00 25.00 25.00 25.00 12.50 12.50 75.00 28.13 50.00 50.00 12.50

ESTRIBOS

414.70

NRO

TITULO DE PARTIDA

NRO

CADA ELEMENTO

LONGITUD TOTAL POR DIAMETRO

VECES

CANT,

C4

4

22

1/4''

1.06

C5

1

22

1/4''

1.00

P1

2

13

3/8''

1.05

2

22

1/4''

0.76

1

13

3/8''

1.05

1

22

1/4''

1.44

3

13

3/8''

0.90

3

22

1/4''

1.20

2

13

3/8''

1.05

2

22

1/4''

0.76

2

13

3/8''

0.65

2

22

1/4''

1.72

3

22

1/4''

0.90

PARTIDA

P2 P3-P3-A P4-P5 P6 C-A

DIAM, LONGIT

TOTAL COLUMNAS TOTAL VARILLAS

3/8''

1/2''

3/4''

1/4'' 93.28 22.00

27.30 33.44 13.65 31.68 35.10 79.20 27.30 33.44 16.90 75.68 59.40 493.58 54.84

443.75 49.31

150.00 16.67

0.00 0.00

842.82 93.65

276.40

452.63

237.00

0.00

210.71

TOTAL 5.09

5/8''

1176.73

VIGAS PRIMER NIVEL VA-1 EJE A ( 1 - 5)

1

6

1/2''

7.9

VA-1 EJE B ( 1 - 5)

1

6

1/2''

7.9

VA-2 EJE C ( 1 - 5)

1

4

1/2''

7.9

1

2

3/8''

7.9

1

4

1/2''

7.9

VA-2 EJE C´ ( 1 - 5)

1

2

3/8''

7.9

VA-1 EJE D ( 1 - 5)

1

6

1/2''

7.9

VA-1 EJE E ( 1 - 5)

1

6

1/2''

7.9

VS-1 EJE 1 ( A - E)

1

6

3/8''

14.42

VS-1 EJE 2 ( A - B)

1

6

3/8''

4.20

VA-1 EJE 3 (A - E)

1

6

3/8''

12.00

VA-2 EJE 4 (B - E)

1

4

1/2''

8.65

1

2

3/8''

8.65

1

4

1/2''

1.75

1

2

3/8''

1.75

VS-1 EJE 5 ( A - E)

1

6

1/2''

14.42

VB EJE A (2-5)

1

2

1/2''

6.85

VB EJE E (1-5)

1

2

3/8''

5.30

VB EJE C (2-5)

1

2

1/2''

1.60

VA-1 EJE A ( 1 - 5)

1

47

1/4''

0.90

VA-1 EJE B ( 1 - 5)

1

48

1/4''

0.90

VA-2 EJE C ( 1 - 5)

1

47

1/4''

0.90

VA-2 EJE C´ ( 1 - 5)

1

48

1/4''

0.90

VA-1 EJE D ( 1 - 5)

1

47

1/4''

0.90

VA-1 EJE E ( 1 - 5)

1

45

1/4''

0.90

VS-1 EJE 1 ( A - E)

1

90

1/4''

1.10

VA-2 EJE 4' (C - D)

47.40 47.40 31.60 15.80 31.60 15.80 47.40 47.40 86.52 25.20 72.00 34.60 17.30 7.00 3.50 86.52 13.70 10.60 3.20

ESTRIBOS

42.30 43.20 42.30 43.20 42.30 40.50 99.00

NRO

TITULO DE PARTIDA

NRO

CADA ELEMENTO

LONGITUD TOTAL POR DIAMETRO

VECES

CANT,

VS-1 EJE 2 ( A - B)

1

30

1/4''

1.10

VA-1 EJE 3 (A - E)

1

82

1/4''

0.90

VA-2 EJE 4 (B - E)

1

63

1/4''

0.90

VA-2 EJE 4' (C - D)

1

11

1/4''

0.90

VS-1 EJE 5 ( A - E)

1

90

1/4''

1.10

VB EJE A (2-5)

1

33

1/4''

0.30

VB EJE E (1-5)

1

30

1/4''

0.30

VB EJE C (2-5)

1

10

1/4''

0.30

PARTIDA

DIAM, LONGIT

TOTAL VIGAS TOTAL VARILLAS

3/8''

1/2''

5/8''

3/4''

1/4'' 33.00 73.80 56.70 9.90 99.00 9.90 9.00 3.00

246.72 27.41

397.82 44.20

0.00 0.00

0.00 0.00

647.10 71.90

138.16

405.78

0.00

0.00

161.78

TOTAL

705.71

SEGUNDO NIVEL VA-1 EJE A ( 1 - 5)

1

6

1/2''

7.9

VA-1 EJE B ( 1 - 5)

1

6

1/2''

7.9

VA-2 EJE C ( 1 - 5)

1

4

1/2''

7.9

1

2

3/8''

7.9

1

4

1/2''

7.9

1

2

3/8''

7.9

1

4

1/2''

7.9

1

2

3/8''

7.9

VA-1 EJE E ( 1 - 5)

1

6

1/2''

7.9

VS-1 EJE 1 ( A - E)

1

6

3/8''

14.42

VS-1 EJE 2 ( A - B)

1

6

3/8''

4.20

VA-1 EJE 3 (A - E)

1

6

3/8''

12.00

VA-2 EJE 4 (B - E)

1

4

1/2''

8.65

1

2

3/8''

8.65

1

4

1/2''

1.75

1

2

3/8''

1.75

VS-1 EJE 5 ( A - E)

1

6

1/2''

14.42

VB EJE A (2-5)

1

2

1/2''

6.85

VB EJE E (1-5)

1

2

3/8''

5.30

VB EJE C (2-5)

1

2

1/2''

1.60

VA-1 EJE A ( 1 - 5)

1

47

1/4''

0.90

VA-1 EJE B ( 1 - 5)

1

48

1/4''

0.90

VA-2 EJE C ( 1 - 5)

1

47

1/4''

0.90

VA-2 EJE C´ ( 1 - 5)

1

48

1/4''

0.90

VA-1 EJE D ( 1 - 5)

1

47

1/4''

0.90

VA-1 EJE E ( 1 - 5)

1

45

1/4''

0.90

VS-1 EJE 1 ( A - E)

1

90

1/4''

1.10

VS-1 EJE 2 ( A - B)

1

30

1/4''

1.10

VA-1 EJE 3 (A - E)

1

82

1/4''

0.90

VA-2 EJE 4 (B - E)

1

63

1/4''

0.90

VA-2 EJE 4' (C - D)

1

11

1/4''

0.90

VS-1 EJE 5 ( A - E)

1

90

1/4''

1.10

VB EJE A (2-5)

1

33

1/4''

0.30

VA-2 EJE C´ ( 1 - 5) VA-2 EJE D ( 1 - 5)

VA-2 EJE 4' (C - D)

47.40 47.40 31.60 15.80 31.60 15.80 31.60 15.80 47.40 86.52 25.20 72.00 34.60 17.30 7.00 3.50 86.52 13.70 10.60 3.20

ESTRIBOS

42.30 43.20 42.30 43.20 42.30 40.50 99.00 33.00 73.80 56.70 9.90 99.00 9.90

NRO

TITULO DE PARTIDA

NRO

CADA ELEMENTO

LONGITUD TOTAL POR DIAMETRO

VECES

CANT,

VB EJE E (1-5)

1

30

1/4''

0.30

VB EJE C (2-5)

1

10

1/4''

0.30

PARTIDA

DIAM, LONGIT

TOTAL VIGAS TOTAL VARILLAS

3/8''

1/2''

5/8''

3/4''

1/4'' 9.00 3.00

262.52 29.17

382.02 42.45

0.00 0.00

0.00 0.00

647.10 71.90

147.01

389.66

0.00

0.00

161.78

TOTAL 5.13

LOSAS ALIGERADAS PRIMER NIVEL Viguetas Viguetas Viguetas

FIERRO TEMPERATURA PRIMER NIVEL PAÑO 1 PAÑO 2 PAÑO 3

1 1 1 1 1 1

15 15 4 4 9 9

1/2'' 3/8'' 1/2'' 3/8'' 1/2'' 3/8''

10.8 1.15 6.8 1.15 8 5

1 1 1 1 1 1

31 30 18 8 23 17

1/4'' 1/4'' 1/4'' 1/4'' 1/4'' 1/4''

7.45 7.30 4.50 1.85 5.50 4.00

TOTAL LOSA ALIGERADA TOTAL VARILLAS

698.45

162.00 17.25 27.20 4.60 72.00 45.00

66.85 7.43

261.20 29.02

0.00 0.00

0.00 0.00

230.95 219.00 81.00 14.80 126.50 68.00 672.25 74.69

37.44

266.42

0.00 471.92

0.00

168.06

TOTAL

SEGUNDO NIVEL PRIMER NIVEL Viguetas Viguetas Viguetas

FIERRO TEMPERATURA PRIMER NIVEL PAÑO 1 PAÑO 2 PAÑO 3

1 1 1 1 1 1

15 15 4 4 9 9

1/2'' 3/8'' 1/2'' 3/8'' 1/2'' 3/8''

10.8 1.15 6.8 1.15 8 5

1 1 1 1 1 1

31 30 18 8 23 17

1/4'' 1/4'' 1/4'' 1/4'' 1/4'' 1/4''

7.45 7.30 4.50 1.85 5.50 4.00

TOTAL LOSA ALIGERADA TOTAL VARILLAS TOTAL 5.16

ESCALERAS

162.00 17.25 27.20 4.60 72.00 45.00

66.85 7.43

261.20 29.02

0.00 0.00

0.00 0.00

230.95 219.00 81.00 14.80 126.50 68.00 672.25 74.69

37.44

266.42

0.00 471.92

0.00

168.06

NRO

TITULO DE PARTIDA

PARTIDA

NRO

CADA ELEMENTO

DIAM, LONGIT

LONGITUD TOTAL POR DIAMETRO

3/8''

VECES

CANT,

1 1 1 1 1 1

4 7 4 4 4 29

3/8'' 3/8'' 3/8'' 3/8'' 3/8'' 3/8''

2.10 3.80 1.50 1.65 1.41 1.05

8.40 26.60 6.00 6.60 5.64 30.45

1 1 1 1 1

4 4 4 7 31

3/8'' 3/8'' 3/8'' 3/8'' 3/8''

1.76 1.00 1.30 3.52 1.05

7.04 4.00 5.20 24.64 32.55

1 1 1 1 1 1

4 7 4 4 4 29

3/8'' 3/8'' 3/8'' 3/8'' 3/8'' 3/8''

2.10 3.80 1.50 1.65 1.41 1.03

8.40 26.60 6.00 6.60 5.64 29.73

1 1 1 1 1

4 4 4 7 31

3/8'' 3/8'' 3/8'' 3/8'' 3/8''

1.76 1.00 1.30 3.52 1.03

7.04 4.00 5.20 24.64 31.78

1 1 1 1 1

4 7 4 4 29

3/8'' 3/8'' 3/8'' 3/8'' 3/8''

1.06 3.65 1.52 1.41 1.05

4.24 25.55 6.08 5.64 30.45

1 1 1 1 1

4 7 4 4 29

3/8'' 3/8'' 3/8'' 3/8'' 3/8''

1.06 3.65 1.52 1.41 1.05

4.24 25.55 6.08 5.64 30.45

1 1 1 1 1

4 7 4 4 29

3/8'' 3/8'' 3/8'' 3/8'' 3/8''

1.06 3.65 1.52 1.41 1.03

4.24 25.55 6.08 5.64 29.73

PRIMER NIVEL ESCALERAS 1 ( A- B)

TRAMO 1 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES

TRAMO 2 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES ESCALERAS 1 ( C)

TRAMO 1 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES

TRAMO 2 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES SEGUNDO NIVEL

TRAMO 3 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES

TRAMO 4 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES ESCALERAS 1 ( C)

TRAMO 3 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES

1/2''

5/8''

3/4''

1/4''

NRO

TITULO DE PARTIDA

PARTIDA

NRO

CADA ELEMENTO

VECES

CANT,

1 1 1 1 1

4 7 4 4 31

DIAM, LONGIT

LONGITUD TOTAL POR DIAMETRO

3/8''

1/2''

5/8''

3/4''

1/4''

4.24 25.55 6.08 5.64 31.93 601.34 66.82

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

336.75

0.00

0.00 336.75

0.00

0.00

TRAMO 4 As ARRIBA LARGO

As ABAJO LARGO As TRANSVERSALES

3/8'' 3/8'' 3/8'' 3/8'' 3/8''

1.06 3.65 1.52 1.41 1.03

TOTAL ESCALERAS TOTAL VARILLAS TOTAL

UND.

ml. Var Kg. Kg.

28

CC-3 EJE A' (41- 5 )

4.150

CC-3 EJE B ( 12 - 5)

5.290

CC-3 EJE C ( 11- 2)

3.950

CC-3 EJE D ( 11- 2 )

3.950

CC-3 EJE E (1-1 5 )

5.000

11

ml. Var Kg. Kg.

1

UND.

ml. Var Kg. Kg.

con arranques para el tercer psiso

con anclaje del CA en losa

UND.

ml. Var Kg. Kg.

13 9 24 35 24 18 6

34 10 10 13 10 9 21

29 13 13 18 15

14

11

UND.

9 9 15 11 6 33 30 10

21 21 14

13 11

26 23

13

21

15

14

11

13 9 24 35 24 18 6 9 9 15 11 6 33

34 10 10 13 10 9 21 21 21 14

13 18 15

14

11

13 11

26 23

13

15

14

11

ml. Var Kg. Kg.

21

29 13

UND.

30 10

ml. Var Kg. Kg.

ml. Var Kg. Kg.

ml. Var Kg. Kg.

UND.

29

29

29

29

UND.

ml. Var Kg. Kg.

HOJA

DE

METRADOS

OBRA "VIVIENDA MULTIFAMILIAR" PROPIETARIO : SR. JOSE ANTONIO MANRIQUE CORAZAO y SRA YVONI CARRASCO CHACON DISTRITO : CAYMA, PROVINCIA : AREQUIPA, DEPARTAMENTO : AREQUIPA FECHA : FEBRERO 2013 HECHO POR : ESL NRO

TITULO DE PARTIDA

TOTAL

UND

1.00 50.24

GLB

119.87 119.87

M2

86.23 12.62 9.55 107.16

M3

80.17 2.79 37.49

M3

4.42 4.06 91.58 1.34 17.87 199.83 17.39 225.98 2898.16 11.53 75.13 1404.16 10.98 127.98 1087.83 943.85 5.66 40.55 336.75

M3

223.98

M2

PARTIDA 1.00

OBRAS PROVICIONALES

1.01

CASETA DE GUARDIANIA Y ALMACEN

1.02

CERCO PERIMETRICO CON ARPILLERA

2.00

TRABAJOS PRELIMINARES

2.01

LIMPIEZA DEL TERRENO

2.02

TRAZO NIVEL Y REPLANTEO

3.00

MOVIMIENTO DE TIERRAS

3.01

EXCAVACION DE CIMIENTOS CORRIDOS Fc= 100 Kg/cm2

3.02

EXCAV MANUAL ZAPATAS

3.03

RELLENO COMPACTADO M/PROPIO (zanjas y zapatas)

3.04

ELIMINACION MATERIAL EXCEDENTE

4.00

OBRAS CONCRETO SIMPLE

4.01

CIMIENTOS CORRIDOS Y SUB ZAPATAS F'c = 100 Kg / cm2

4.02

SOBRECIMIENTOS F'c = 175 Kg / cm2

4.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

5.00

OBRAS DE CONCRETO ARMADO

5.01

ZAPATAS F'c = 210 Kg / cm2

5.02

ENCOFRADO ZAPATAS

5.03

ACERO ZAPATAS F'y 4200 Kg/cm2

5.04

VIGAS DE CIMENTACION f'c=210kg/cm"

5.05

ENCOFRADO DE VIGAS DE AMARRE

5.06

ACERO VIGAS DE CIMENTACION F'y =4200 Kg/cm2

5.07

COLUMNAS CONCRETO F'c =210kg/cm"

5.08

ENCOFRADO Y DESENCOF. EN COLUMNAS

5.09

ACERO EN COLUMNAS F'y 4200 Kg/cm2

5.10

VIGAS CONCRETO F'c =210kg/cm"

5.11

ENCOFRADO Y DESENCOF. EN VIGAS

5.12

ACERO EN VIGAS F'y 4200 Kg/cm2

5.13

LOSAS ALIGERADAS CONCRETO f'C=210kg/cm"

5.14

ENCOFRADO - DESENCOF. EN LOSAS ALIGERADAS

5.15

LADRILLO HUECO 15X30X30 CM P/TECHO ALIGERADO

5.16

ACERO EN LOSAS ALIGERADAS F'y 4200 Kg/cm2

5.17

ESCALERAS f'C=175kg/cm"

5.17

ESCALERAS ENCOFRADO Y DESENCOFRADO

5.18

ACERO EN ESCALERAS F'y 4200 Kg/cm2

6.00

MUROS Y TABIQUES DE ALBAÑILERIA

6.01

MURO DE LADRILLO KK DE ARCILLA SOGA

ML

M2

M3 M3 M3

M3 M2

M2 Kg M3 M2 Kg M3 M2 Kg M3 M2 Kg M3 M2 M2 Kg M3 M2 Kg

HOJA

DE

METRADOS

OBRA "VIVIENDA MULTIFAMILIAR" PROPIETARIO : SR. JOSE ANTONIO MANRIQUE CORAZAO y SRA YVONI CARRASCO CHACON DISTRITO : CAYMA, PROVINCIA : AREQUIPA, DEPARTAMENTO : AREQUIPA FECHA : FEBRERO 2013 HECHO POR : ESL NRO PARTIDA

TITULO DE PARTIDA

TOTAL

UND

HOJA

DE

METRADOS

OBRA "VIVIENDA MULTIFAMILIAR" PROPIETARIO : SR. JOSE ANTONIO MANRIQUE CORAZAO y SRA YVONI CARRASCO CHACON DISTRITO : CAYMA, PROVINCIA : AREQUIPA, DEPARTAMENTO : AREQUIPA FECHA : FEBRERO 2013 HECHO POR : ESL NRO PARTIDA

TITULO DE PARTIDA

TOTAL

UND

Item

Descripción

Und.

Metrado

Precio S/.

OBRAS PROVISIONALES

01 1.01

CASETA DE GUARDIANIA Y DEPOSITO

GLB

1.00

600.00

1.03

CORTE DE TERRENO CON EQUIPO

m3

74.10

34.75

1.04

RELLENO DE TERRENO CON EQUIPO

m3

63.48

34.75

1.05

ELIMINACION DE MATERIAL CON EQUIPO

m3

10.62

18.00

TRABAJOS PRELIMINARES

02 02.01

LIMPIEZA DE TERRENO MANUAL

m2

200.87

1.05

02.02

TRAZO NIVEL Y REPLANTEO

m2

200.87

1.68

MOVIMIENTO DE TIERRAS

03 03.01

EXCAVACION CIMIENTOS EN TERRENO NORMAL

m3

78.74

28.00

03.02

RELLENO COMPACTADO CON MAT. PROPIO

m3

14.08

13.90

03.03

NIVELACION INTERIOR Y APISONADO MANUAL

m2

200.87

2.10

03.04

ELIMINACION MATERIAL EXCEDENTE CARGIO A MANO C/VOLQUETE DE 10m3,D=5km m3

77.59

18.00

OBRAS DE CONCRETO SIMPLE

04 04.01

SOLADO PARA ZAPATA e=10cm,f'c=100kg/cm2

m2

3.00

240.00

04.03

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

47.02

156.78

SOBRECIMIENTOS

04.04 04.04.01

CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS

m3

2.68

222.93

04.04.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

m2

35.71

17.00

SARDINELES

04.05 04.05.01

CONCRETO F'C=140 kg/cm2 PARA SARDINELES

m3

1.87

238.40

04.05.02

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

7.05

17.00

OBRAS DE CONCRETO ARMADO

05

ZAPATAS

05.01 05.01.01

CONCRETO EN ZAPATAS F'C=210 KG/CM2

m3

05.01.02

ACERO CORRUGADO EN ZAPATAS f'y=4200 kg/cm2 GRADO 60

kg

0.58

351.48

26.93

5.05

COLUMNAS

05.02 05.02.01

CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

8.67

351.48

05.02.02

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

m2

148.71

21.00

05.02.03

ACERO CORRUGADO EN COLUMNASf'y=4200 kg/cm2 GRADO 60

kg

1,264.11

5.05

VIGAS

05.03 05.03.01

CONCRETO EN VIGAS F'C=210 KG/CM2

m3

4.53

351.48

05.03.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

43.83

21.00

05.03.03

ACERO CORRUGADO EN VIGAS f'y=4200 kg/cm2 GRADO 60

kg

677.12

5.05

05.04

LOSA ALIGERADA

05.04.01

CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2

m3

6.62

351.48

05.04.02

ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS

m2

05.04.03

ACERO CORRUGADO EN LOSA ALIGERADA f'y=4200 kg/cm2 GRADO 60

kg

74.92

24.27

363.67

05.04.04

LOSA ALIGERADA LADRILLO HUECO DE 15x30x30

und

636.84

5.05 3.22

ESCALERA

05.05 05.05.01

CONCRETO ESCALERAS F'C=210 KG/CM2

m3

2.14

351.48

05.05.02

ENCOFRADO Y DESENCOFRADO DE ESCALERAS

m2

16.18

21.00

05.05.03

ACERO CORRUGADO EN ESCALERAS f'y=4200 kg/cm2 GRADO 60

kg

49.06

5.05

MUROS DE CONTENCION

5.06 05.06.01

CONCRETO MURO DE CONTENCION F'C=210 KG/CM2

m3

18.35

351.48

05.06.02

ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION

m2

184.63

21.00

05.06.03

ACERO CORRUGADO MURO DE CONTENCION f'y=4200 kg/cm2 GRADO 60

kg

474.99

5.05

MUROS Y TABIQUES

06 06.01

MURO LADRILLO KK SOGA 9x14x24

m2

207.11

54.86

06.02

REFUERZO HORIZONTAL CON ALAMBRE Nº 8

kg

276.45

5.05

REVOQUES ENLUCIDOS Y MOLDURAS

07 07.01

TARRAJEO PRIMARIO O RAYADO

m2

8.31

12.56

07.02

TARRAJEO INTERIOR

m2

114.21

17.83

07.03

TARRAJEO EXTERIOR

m2

69.75

21.18

07.03

TARRAJEO EXTERIOR CERCO PERIMETRICO MY MUROS DE CONTENCION

m2

144.49

21.18

07.04

TARRAJEO EN COLUMNAS

m2

55.28

21.88

07.05

TARRAJEO EN VIGAS

m2

25.09

21.41

07.06

TARRAJEO EN CIELO RASO

m2

74.66

19.56

07.07

VESTIDURA DE DERRAMES

m

80.02

9.67

PISOS Y PAVIMENTOS

08 08.01

FALSO PISO, e=10 cm.

m2

131.19

27.52

08.02

CONTRAPISO DE 25mm.

m2

131.19

18.66

m2

49.00

13.50

TRATAMIENTO AREAS VERDES

15 15.01

TRATAMIENTO AREAS VERDES INSTALACION SANITARIA

17

SISTEMA DE DESAGUE

17.01 17.01.01

SALIDA DE DESAGUE Ø 4"

pto

1.00

67.50

17.01.02

SALIDA DE DESAGUE Ø 2"

pto

9.00

59.20

17.01.03

SALIDA DE VENTILACION Ø 2"

pto

2.00

47.80

17.01.04

TRAMPA EN "P" Ø 2" CON SUMIDERO

pto

12.00

37.12

17.01.05

REGISTRO ROSCADO DE BRONCE 4"

pza

1.00

29.85

17.01.06

CAJA DE REGISTRO DE DESAGUE 40x60

und

3.00

105.07

17.01.07

TUBERIA PVC-SAL 4"

m

38.85

7.24

17.01.08

TUBERIA PVC-SAL 2"

m

25.70

4.44

17.01.09

ACCESORIOS DE DESAGUE PVC (promedio)

pza

26.00

5.95

SISTEMA DE DESAGUE PLUVIAL

17.02 17.02.01

BAJADA DE LLUVIA Ø 2"

pto

5.00

47.35

17.02.02

TUBERIA PVC-SAL 2"

m

15.00

5.95

17.02.03

ACCESORIOS DE DESAGUE PVC (promedio)

pza

10.00

5.95

pto

6.00

32.74

SISTEMA DE AGUA FRIA

17.03 17.03.01

SALIDA DE AGUA FRIA PVC-SAP 1/2"

17.03.02

LLAVE DE COMPUERTA DE BRONCE Ø 3/4"

und

17.03.03

LLAVE DE COMPUERTA DE BRONCE Ø 1/2"

und

17.03.04

TUBERIA PVC-SAP 3/4"

m

17.03.05

TUBERIA PVC-SAP 1/2"

m

15.50

3.04

17.03.06

ACCESORIOS DE AGUA PVC (promedio)

pza

13.00

5.00

55.35

3.00

41.43

30.50

5.17

200.87

1.05

SISTEMA DE INSTALACIONES ELECTRICAS

17.03

VARIOS

19 19.01

1.00

LIMPIEZA FINAL DE OBRA

m2

COSTO DIRECTO GASTOS GENERALES Y UTILIDADES 8% TOTAL PRESUPUESTO

PRESUPUESTO 01 PRIMER NIVEL HASTA CASCO GRIS INSUMOS 1.00 MANO DE OBRA

31,699.04

35%

2.00 MATERIALES

55,246.89

61%

3.00 HERRAMIENTAS Y EQUIPOS COSTO DIRECTO

S/.

3,622.75

4%

90,568.67

100%

Parcial S/. 5,572.07

600.00 2574.98 2205.93 191.16 548.38

210.91 337.46 4,218.88

2204.72 195.71 421.83 1396.62 8,091.80

720.00 7371.80 1,204.52

597.45 607.07 565.66

445.81 119.85

339.85

203.86 136.00 12,554.00

3047.33 3122.91 6383.76 5,932.09

1592.20 920.43 3419.46 8,032.26

2326.80 1818.31 1836.53 2050.62 1,339.70

752.17 339.78 247.75 12,725.59

6449.66 3877.23 2398.70 12,758.13

11362.05 1396.07 10,659.19

104.37 2036.36 1477.31 3060.30 1209.53 537.18 1460.35 773.79 6,058.35

3610.35 2448.01 661.50

661.50

2,036.48

67.50 532.80 95.60 445.44 29.85 315.21 281.27 114.11 154.70 385.50

236.75 89.25 59.50 645.89

196.44

S INSUMOS

55.35 124.29 157.69 47.12 65.00 1,600.00 210.91

210.91 90,568.67 8,151.18

S/.

98,719.85