Project: Location: Client: Job Title WALL & COLUMN FORMWORK ANALYSIS Made By: Checked By: Date: Job.No/ Rev. CGB 7/13
Views 156 Downloads 7 File size 108KB
Project: Location: Client: Job Title WALL & COLUMN FORMWORK ANALYSIS
Made By: Checked By: Date: Job.No/ Rev.
CGB
7/13/2014
CONCRETE PRESSURE ANALYSIS:
REF.
1. CONCRETE PROPERTIES:
ACI 347-04
c = Type =
25.00 kN/m³ 2.00 unitless
2548 kg/m³ Unit weight of Concrete Cement type or blend
1 - Types I, II, and II without retarders. 2 - Types I, II, and II with retarders. 3 - Other types or blends containing less than 70% slag or 40 % fly ash without retarders 4 - Other types or blends containing less than 70% slag or 40 % fly ash with retarder. 5 - Blends containing more than 70% slag or 40% fly ash.
Cc = Cw =
1.20 unitless 1.098 unitless
Unit Weight Coefficient:
Chemistry Coefficient Coefficient due to Unit Weight
Table 2.2 Table 2.1
2. PRESSURE LOAD ANALYSIS: EL = Ht = R= T=
2.00 3.500 3.00 30.0
unitless m m/hr ºC
1 - for Column, 2 - for Wall Height of the Concrete Rate of Pouring Temperature of Concrete
For Column:
Pmin = Pmax = Pcal =
32.95 kPa 87.50 kPa 61.55 kPa
For Wall: 30Cw , Minimum pressure gh , Maximum pressure CwCc [7.2 + 1156/ (T+17.8) + 785R/ (T+17.8)] Calculated pressure
Pd = Hz =
61.55 61 55 kPa 2.46 m
Design pressure (for analysis) Height of Hydrostatic Zone
Eqtn. 2.2
Eqtn. 2.3
Eqtn. 2.4
3. FORMWORK ANALYSIS: P_Ht = P_Wi = T_Wi =
4.308 m 2.40 m 1.20 m
Formwork Height Formwork Width Triburaty Width consider in analysis
SOL/MTH Catalogue
5
- Tie Rod Location and Reaction T-1 = T-2 = T-3 = T-4 = T-5 = T-6 = T-7 = T-8 = T-9 =
82.63 69.18 15.78 0.01 0.00 0.00 0.00 0.00 0.00
kN kN kN kN kN kN kN kN kN
4.5 4.31
Tie Rod Reaction 1 Tie Rod Reaction 2 Tie Rod Reaction 3 Tie Rod Reaction 4 Tie Rod Reaction 5 Tie Rod Reaction 6 Tie Rod Reaction 7 Tie Rod Reaction 8 Tie Rod Reaction 9
4 3.5 3 2.5 2
- REMARKS:
1.5
THEREFORE, USE TIE ROD ø17 mm
1 0.5 0.000 0
SO BANCHE
D:\Cris Files\old drive d\Calculation Files\Excel Sheet File\SO Panel Template
20
40
60
80
100
PRESSURE DIAGRAM
By: CGB