Daily Coating Insp Report

Paint Inspection Daily Coating Inspection Report Date: / / Su M Tu W Th F Sa Pg of Project #: Copy to: QC Super

Views 106 Downloads 5 File size 89KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Paint Inspection Daily Coating Inspection Report

Date:

/

/

Su M Tu W Th F Sa

Pg

of

Project #:

Copy to: QC Super

Inspector:

Owner

Contr

Project/Client: Location:

Attachments: DFT Sheet

Description:

NCR/CAR

Requirements: Spec #:

Contractor:

Revision #:

Description of Areas and Work Performed

Hold Point Inspections Performed

1.

Pre Surface Preparation/Condition and Cleanliness

2. 3.

Surface Preparation Monitoring

4.

Pre Application Prep/Surface Cleanliness

5.

Application Monitoring/Wet Film Thickness (WFT)

6.

Post Application/Application Defects

Post Surface Preparation/Cleanliness and Profile

7. Post Cure/Dry Film Thickness (DFT) Approved by: Ambient Conditions

Surface Conditions New

Maint

Primer/Paint

Steel

Galvanize

Concrete

Hazard

Age/Dry/Cure Other

Sample Report #

Degree of contamination: Test:

Cl

ppm

pH

Degree of Corrosion: Crevices

Moisture

Sharp Edges

Oils

Touch

º

º

º

º

º

º

º

%

Surface Tempº (C/F) Min/Max

Dry/Over Spray

Runs/Sags

Pinholes

Abrasion

Fall Out

Other

Finish Time:

º

Power Tool Other

Abrasive Type

Sample Blast

Hose Size

Nozzle Size/PSI

Air Supply CFM

Air Supply Cleanliness

Water/Oil Trap Check

Equipment Condition Check

SSPC/NACE Spec/Visual Stds Disc

Tape

mils avg/Achieved

Surface Effect on DFT Gage/BMR

Gage mils

mils

Dry Film Thickness (DFT) Gage Calibration Record Gage Type/ Model

Gage Serial #

Plate/Shim Mils/µm

Gage Adj +/–

Spec Avg DFT

Primer

Intermediate

%

º

/

º

º

% /

º

º

º

DFT Last Coat

DFT This Coat

Est Sq Ft: Topcoat

Touch-Up

Generic Type:

Qty Mixed:

Mfr:

Mix Ratio:

Prod Name:

Mix Method:

Prod #:

Strain/Screen:

Color:

Material Temp:

ºF

Kit Sz/Cond:

Sweat-In Time:

Min/Hrs

Shelf Life:

Pot Life:

Min/Hrs

Reducer #:

(A)

SSPC/NACE SP

Profile Check

Finish Time:

Batch #s

Surface Cleanliness and Profile Measurement Job Specification

Start Time: Holidays

Est Sq Ft:

Hand Tool

HP Wash PSI

Specified

/

Weather Conditions

Surface Preparation

Abrasive Blast

%

º

Application Recoat

Solvent Clean

/

Wind Direction/Speed

Other

Handle

Start Time:

:

º

Painted Surface Condition: Dry to:

:

Wet Bulb Tempº (C/F)

Dew Point Tempº (C/F)

Pitting/Holes

Weld

:

Dry Bulb Tempº (C/F) % Relative Humidity

Fe

µg/cm2 (µs/cm)

Scale

:

Time (Indiciate AM or PM)

Pt/Qt/Gal %

(B)

Qty Added: % by Vol:

(C)

Specified WFT Avg:

Mils

Reducer:

Achieved WFT Avg:

Mils

Airless/Conv Spray

Brush

Roller

Other

Pump Pot:

Hose Diameter:

Air Check:

Ratio/Size:

Hose Length:

SEP/Trap:

GPM/CFM:

Spray Gun:

Filter:

PSI:

Tip Size:

Agitator:

Inspector Signature:

Date:

SSPC Sample Form