Nyumba Ya Akiba-Cement Plant 3000 TPD Daily Progress Report Date: 1-Dec-15 a) Major Activities Done Area Cable Trench

Views 122 Downloads 5 File size 48KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

  • Author / Uploaded
  • mkpq
Citation preview

Nyumba Ya Akiba-Cement Plant 3000 TPD Daily Progress Report Date:

1-Dec-15

a) Major Activities Done Area Cable Trench Civil

131- Limestone Clay Mix Storage Grid Station

Activities Description Main Sub Station to Grid Station Completed Cooler Sub Station to Raw Mill Substation completed Circular Beam concrete completed Footing Concrete completed

Mechanical

b) Potential issues

Grid Station Civil

Issue Excavation of Switch Yard yet not started due to shortage/limited earth moving machines 481-Clinker Storage Shaft (Clinker Tower) Super structure design details above +327 still awaited from Loya associates 461-Coal Mill Building Hold due to Mechanical Works CCR Building

331-Exhaust Gas Conditioning Baghouse Structure Drawings awaited from Loya associates 391-Coal Mill Substation Work can not be started due to erection of Pre Heater Supervisor Accommodation Completed from local resources, while remaining 30 rooms finishing delayed to non arrival of material booked from Dubai

Completion of Civil Works is delayed Completion of Civil Works is delayed. Completion of remaining 30 rooms of Supervisor Accommodation could be delayed Shortage of tools hampering pace of erection

Welding Accessories Shipment still at matadi port

Huge imported quantities of consumable laying at port, which also resulting in un-necessary financial impact to arrange partially from local market.

Kiln shells consignment #53 & 38 still at Matadi

Delay in kiln erection Activities

All Packer items shipment # 41 stuck up at bonded ware house

Delay in Packer Erection Activities Raw Mill Housing Job Pending due to non availability of Certificates G-3 certified welder Final Alignment of Gear box plate is pending due to non availability of Hydraulic tensioner

Hydraulic Tool Stuck at port c) Daily Critical Stocks Sand Crush Cement Diesel Oxygen Cylinder DA Cylinder Fon Gas Cylinder

Civil Works of Coal Mill Will be delayed

Erection Tools and tackles Shipment still at matadi port

Welding certificates of Welders awaited from Alghazi

Material

Could be resulted in delay of slip forming startup

Demand of architectural and Plumbing Items and subsequent. Procurement to be delayed

Architectural Drawings awaited from Loya associates

Mechanical

Consequences Completion of Civil Works in Switch Yard will be delayed

d) Total Manpower Site Current Stock 12718.47 17290.07 60748 32651 61 68 0

Unit ton ton ton liter

NYA Locals Expats LCL

Total

Manpower Contractor 41 Alghazi 9 INDEC 11 Cambridge Al Farooq TNI SCS EMI FLS LOYA 61

Manpower 52 37 236 23 174 310 154 4 4 994

e) Civil Activates Area

Equipment

100 -Raw Material Handling

111-Limestone Crushing Department 133-Additive Storage 112-Clay Crushing Department

200 - Additive and Coal Handling Area 300 - Raw Meal Production Area

500 - Cement Grinding Area

800 - Electrical Departments Area Ancillary Building

Steel Fixing (ton)

Block Concrete (cum) masonry/Finishing(S qm)

Formwork (sqm)

1.92

32

16

0.72 1.8 -

24.3 44.48 -

6 15 -

5.88 -

12 1.2 0.12

49 8.1 2.5

641/642-Packing Plant

Grid Station Main Substation Admin Building Supervisor Accomodation Total Quantities

2.28 0.192 116.572

5.88

-

-

321-Raw Mill

400 - Clinker Production Area

600 - Cement Storage and Dispatch Area

Excavation (cum)

-

-

10 1

102.73 0.4 199.73

19 1.6 -

40 31.6

f) Mechanical Activities Area

Equipment

100 -Raw Material Handling Area 200 - Additive and Coal Handling Area 300 - Raw Meal Production Area

Atox Mill 321 (Separator)

Preheater 421 (5th floor) 400 - Clinker Production Area

500 - Cement Grinding Area

531.RM100

600 - Cement Storage and Dispatch Area Total Quantities

Embedment fabrication (ton) 0

Embedment Padding and Structure installation (ton) leveling (ton) erection (ton) 0

0.408 0.408

3.82382 3.82382

Equipment erection (ton) 0

g) Mining Activates Total Overburdened Remove Today (cum)

Total overburden remove till date(from 20 Oct 15) (cum)

Target Overburden Removal

Target Date

11,592

137,515

3,200,000

1-Jun-16

h) NYA Project Progressive Areas Pictorial Detail

441-Clinker Cooler EP (Slab) embedment items alignment in-progress