Copy of Global Refinery Shutdown Roundup Sample

Date of last update: December 27, 2010 To start a new search, be certain to un-filter your results by pointing to Filter

Views 88 Downloads 6 File size 821KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Date of last update: December 27, 2010 To start a new search, be certain to un-filter your results by pointing to Filter on the Data menu, and then click Show All. The drop-down buttons will appea In the "Shutdown date" and "Restart date" columns, "*-" indicates an unknown month, day, or year. See "Key" sheet for additional notes. *For refineries that have multiple unit shutdowns, an entry was created for each unit. **Regions: (1) United States, (2) Canada, (3) Latin America & Caribbean, (4) Western Europe, (5) Eastern Europe, (6) Middle East, (7) Africa, (8) Asia-Pac Shutdown date Restart date Region** M D Y M D Y Refiner City State or Country Refinery Refinery process province capacity, K b/d 1 01 01 11 **- 11 Citgo Lake LA US 440 Fluid Catalytic Cracking Petroleum Charles

1

11

25

10

12

25

10 Holly

1

09

25

10

12

20

1

09

25

10

12

3

03

01

10

3

03

01

10

Tulsa

OK

US

125

Fluid Catalytic Cracking

10 ExxonMobi Beaumon l t

TX

US

345

Hydrocracking

20

10 ExxonMobi Beaumon l t

TX

US

345

Catalytic Reforming

12

23

10 PDVSA

Refineria Isla Curazao

Netherlan ds Antilles

320

Crude Distillation

12

23

10 PDVSA

Refineria Isla Curazao

Netherlan ds Antilles

320

Fluid Catalytic Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

3

03

01

10

12

23

10 PDVSA

8

01

*-

11

02

*-

8

12

07

10

12

20

1

12

04

10

12

18

8

12

07

10

12

18

8

12

07

10

12

1

12

07

10

02

Refineria Isla Curazao

Netherlan ds Antilles

320

Crude Distillation

11 Reliance Jamnagar Industries

India

660

Fluid Catalytic Cracking

10 Kashima Kashima Oil 10 Chalmette Chalmett Refining e

Japan

210

Fluid Catalytic Cracking

US

193

General outage, turnaround, or closure

10 Cosmo Oil Yokkaichi

Japan

147

Crude Distillation

18

10 Cosmo Oil Yokkaichi

Japan

147

Crude Distillation

*-

11 Valero Energy

US

140

Fluid Catalytic Cracking

Benicia

LA

CA

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

12

17

10

12

19

10 Valero Energy

8

12

20

11

*-

*-

8

12

24

10

12

8

01

*-

11

7

12

19

7

12

7

Port Arthur

TX

US

250

Sulfur Plant

*- SK Energy Ulsan

South Korea

817

Hydrotreating

28

10 Cosmo Oil Yokkaichi

Japan

147

Fluid Catalytic Cracking

02

*-

11 Reliance Jamnagar Industries

India

660

Hydrotreating

10

*-

*-

*- Naftec

Algeria

060

General outage, turnaround, or closure

22

10

*-

*-

*- Nigerian Kaduna National Petroleum

Nigeria

110

General Equipment

12

22

10

*-

*-

*- Nigerian Port National Harcourt Petroleum

Nigeria

150

General Equipment

1

12

18

10

12

19

10 BP

WA

US

222

General outage, turnaround, or closure

1

12

20

10

12

20

10 ConocoPhi Wood llips River

IL

US

306

Fluid Catalytic Cracking

Arzew

Ferndale

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

12

20

10

12

20

10 Motiva Convent Enterprise s

LA

US

227

General outage, turnaround, or closure

1

12

20

10

12

20

10 ExxonMobi Torrance l

CA

US

150

Fluid Catalytic Cracking

1

12

20

10

12

20

10 ExxonMobi Torrance l

CA

US

150

Alkylation

1

12

23

10

12

*-

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure

1

12

23

10

12

23

10 Alon USA Big Energy Spring

TX

US

070

General Equipment

1

12

23

10

12

23

10 San Joaquin Refining

Bakersfiel d

CA

US

015

General outage, turnaround, or closure

1

12

23

10

12

23

10 US Oil & Refining

Tacoma

WA

US

039

General outage, turnaround, or closure

2

*-

*-

10

12

23

10 Imperial Oil

Sarnia

ON

Canada

121

General Equipment

1

12

22

10

12

24

10 Valero Energy

Corpus Christi

TX

US

205

Hydrocracking

1

03

*-

11

*-

*-

11 Marathon Oil

Robinson

IL

US

204

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8

12

10

10

12

15

10 JX Holdings

Negishi

Japan

340

Crude Distillation

8

11

17

10

12

25

8

11

17

10

12

25

8

05

25

11

06

*-

10 Bharat Mumbai Petroleum 10 Bharat Mumbai Petroleum 11 S-Oil Onsan

India

240

Crude Distillation

India

240

Fluid Catalytic Cracking

South Korea South Korea Oman

520

Crude Distillation

8

09

*-

11

10

*-

11 GS Caltex Yosu

680

Crude Distillation

6

10

30

10

12

18

10 Oman Refinery

116

General outage, turnaround, or closure

5

12

03

10

12

17

10 Ceska Litvinov Rafinerska

Czech Republic

101

Hydrocracking

4

12

13

10

12

27

10 Petroplus Ingolstadt

Germany

110

12

22

10 Tamoil

Italy

094

H2 Production/Purification/Rec overy General outage, turnaround, or closure

4

12

16

10

6

10

25

10

12

14

10 Oil Haifa Refineries Ltd.

Israel

130

Catalytic Reforming

6

10

25

10

12

14

10 Oil Haifa Refineries Ltd.

Israel

130

H2 Production/Purification/Rec overy

4

01

13

11

02

17

France

119

*-

*-

11

*-

*-

11 ExxonMobi Fos-surl Mer 11 ERG Priolo

Italy

225

General outage, turnaround, or closure General outage, turnaround, or closure

4

Sohar

Cremona

Sicily

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

12

09

10

12

11

10 Tesoro

1

12

10

10

12

10

1

12

11

10

12

1

12

14

10

1

12

14

1

12

1

Martinez

CA

US

161

General outage, turnaround, or closure

CA

US

139

11

10 ConocoPhi Wilmingt llips on 10 Frontier Oil El Dorado

KS

US

135

12

14

10 Sunoco

PA

US

175

General outage, turnaround, or closure General outage, turnaround, or closure General Equipment

10

12

14

10 Valero Energy

TN

US

180

General outage, turnaround, or closure

15

10

12

15

10 Citgo Lake Petroleum Charles

LA

US

440

General outage, turnaround, or closure

12

15

10

12

15

10 Flint Hills Corpus Resources Christi

TX

US

279

General outage, turnaround, or closure

1

12

15

10

12

15

10 LyondellB Houston asell

TX

US

268

General outage, turnaround, or closure

1

12

08

10

12

14

10 Valero Energy

TX

US

090

Fluid Catalytic Cracking

1

12

10

10

12

14

10 Alon USA Big Energy Spring

TX

US

070

Utilities Production

1

12

14

10

12

16

10 Valero Energy

Corpus Christi

TX

US

205

Hydrocracking

1

12

15

10

01

05

11 BP

Carson

CA

US

252

3

*-

*-

11

*-

*-

8

03

*-

11

03

*-

11 ExxonMobi Acajutla l 11 Sinopec Jinling

General outage, turnaround, or closure General outage, turnaround, or closure Crude Distillation

Marcus Hook Memphis

Houston

El Salvador Jiangsu China

022 270

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8

03

*-

11

03

*-

11 Sinopec

Jinling

Jiangsu China

270

Coking

4

01

*-

11

*-

*-

*- Motor Oil Hellas

Aghii Theodori

Corinth Greece

110

Crude Distillation

1

11

29

10

12

07

10 Valero Energy

Memphis

US

180

Fluid Catalytic Cracking

3

12

02

10

12

07

10 PDVSA

Cardon

Venezuel a

940

General outage, turnaround, or closure

1

12

04

10

12

04

10 Chevron

Pascagou la

MS

US

330

General Equipment

1

12

04

10

12

04

10 ExxonMobi Beaumon l t

TX

US

345

General outage, turnaround, or closure

1

12

05

10

12

07

IL

US

159

1

12

08

10

12

08

10 Citgo Lemont Petroleum 10 Citgo Lemont Petroleum

IL

US

159

General outage, turnaround, or closure Hydrotreating

1

12

05

10

12

05

TX

US

247

General Equipment

1

12

09

10

12

09

TX

US

247

1

12

05

10

12

05

10 ConocoPhi Sweeny llips 10 ConocoPhi Sweeny llips 10 LyondellB Houston asell

TX

US

268

General outage, turnaround, or closure General Equipment

TN

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

12

06

10

12

06

10 Tesoro

Anacorte s

WA

US

113

General outage, turnaround, or closure

1

12

07

10

12

07

10 Chevron

El Segundo

CA

US

269

General outage, turnaround, or closure

1

12

08

10

12

08

10 Valero Energy

Paulsbor o

NJ

US

166

General outage, turnaround, or closure

1

12

08

10

12

08

10 ConocoPhi Westlake llips

LA

US

239

General Equipment

3

12

08

10

12

09

110

12

03

10

12

03

Esmerald as Norco

Ecuador

1

LA

US

220

General outage, turnaround, or closure Sulfur plant

1

12

07

10

12

07

10 Petroecua dor 10 Motiva Enterprise s 10 Motiva Enterprise s

Norco

LA

US

220

General Equipment

1 1

09 12

17 05

10 10

12 12

06 08

10 BP 10 Tesoro

IN CA

US US

385 100

1

*-

*-

*-

12

08

10 BP

Whiting Wilmingt on Texas City

TX

US

451

Fluid Catalytic Cracking General outage, turnaround, or closure Hydrocracking

1

*-

*-

*-

12

08

10 BP

Texas City

TX

US

451

Hydrotreating

8

11

*-

10

11

30

10 Cosmo Oil Yokkaichi

Japan

147

Crude Distillation

8

02

25

11

*-

*-

*- Sinopec

Guangzh Guangdo China ou ng

210

Crude Distillation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

4

11

10

10

12

01

10 AB Nynas Dundee Petroleum

4

11

29

10

11

29

10 IES

Mantova

4

11

30

10

11

30

6

02

*-

11

03

*-

6

04

25

11

05

31

10 AB Nynas Petroleum 11 Saudi Aramco Shell Refinery 11 Saudi Aramco

1

11

23

10

11

30

10 ConocoPhi Belle llips Chasse

1

11

23

10

11

30

10 ConocoPhi Belle llips Chasse

Scotland UK

012

General outage, turnaround, or closure

Italy

069

General Equipment

Nynasha mn Al-Jubail

Sweden

028

Saudi Arabia

290

General outage, turnaround, or closure Crude Distillation

Rabigh

Saudi Arabia

400

General outage, turnaround, or closure

LA

US

247

Fluid Catalytic Cracking

LA

US

247

Alkylation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

24

10

11

30

10 ExxonMobi Torrance l

CA

US

150

General outage, turnaround, or closure

2

11

26

10

11

26

AB

Canada

187

1

11

27

10

11

27

10 Imperial Oil 10 Coffeyville Resources

KS

US

114

General outage, turnaround, or closure Sulfur Plant

1

11

27

10

11

27

LA

US

220

General outage, turnaround, or closure

1

11

28

10

11

28

OK

US

125

1

11

28

10

11

28

1

11

29

10

11

29

1

11

29

10

11

29

1

11

29

10

12

1

11

30

10

1

11

30

1

12

1

1

Edmonto n Coffeyvill e

10 Motiva Norco Enterprise s 10 Holly Tulsa 10 ConocoPhi llips 10 LyondellB asell 10 Valero Energy

Sweeny

TX

US

247

General outage, turnaround, or closure Fluid Catalytic Cracking

Houston

TX

US

268

Fluid Catalytic Cracking

Corpus Christi

TX

US

205

Isomerization

02

10 PDVSA

Amuay

Venezuel a

640

General outage, turnaround, or closure

11

30

10 Chevron

10

11

30

01

10

12

01

12

01

10

12

12

01

10

12

Pascagou la 10 ExxonMobi Beaumon l t 10 ExxonMobi Baton l Rouge

MS

US

330

Fluid Catalytic Cracking

TX

US

345

General Equipment

LA

US

505

General outage, turnaround, or closure

01

10 Flint Hills Corpus Resources Christi

TX

US

279

General Equipment

01

10 BP

CA

US

252

H2 Production/Purification/Rec overy

Carson

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

12

01

10

12

01

10 Valero Energy 10 PDVSA

Benicia

3

12

02

10

12

02

1

12

02

10

12

02

10 ExxonMobi Joliet l

3

10

*-

10

12

01

10 Pemex

Salina Cruz

1 1

10 11

25 26

10 10

11 *-

27 *-

1

11

29

10

11

29

10 BP *- ExxonMobi l 10 Alon USA Energy

Carson Beaumon t Big Spring

1

11

30

10

11

30

1

11

30

10

11

1

12

01

10

1

12

01

2 1

12 12

1 1 8

8

CA

US

140

Fluid Catalytic Cracking

Venezuel a

127

General outage, turnaround, or closure

US

238

Utilities Production

Mexico

330

General outage, turnaround, or closure

CA TX

US US

252 345

TX

US

070

Catalytic Reforming General outage, turnaround, or closure General outage, turnaround, or closure

10 Alon USA Big Energy Spring

TX

US

070

General Equipment

30

10 Shell Chemical

Saraland

AL

US

085

General outage, turnaround, or closure

12

01

TX

US

205

10

12

03

10 Valero Corpus Energy Christi 10 ExxonMobi Torrance l

CA

US

150

General outage, turnaround, or closure General outage, turnaround, or closure

01 05

10 10

12 12

04 07

10 Irving Oil 10 Tesoro

St. John Wilmingt on

NB CA

Canada US

250 100

Fluid Catalytic Cracking General outage, turnaround, or closure

02 04 10

*20 22

11 11 10

03 05 11

*20 20

10 Shell Oil 10 Shell Oil 10 Idemitsu Kosan

Martinez Martinez Chita

CA CA Aichi

US US Japan

145 145 152

Hydrotreating Hydrocracking Crude Distillation

11

15

10

11

20

10 Idemitsu Kosan

Tomakom Hokkaido Japan ai

133

Crude Distillation

El Palito

IL

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8

11

23

10

11

23

10 Pertamina Balongan

Indonesia

125

General Equipment

8

11

26

10

12

15

10 TonenGen Kawasaki eral

Japan

296

General outage, turnaround, or closure

8

09

*-

11

*-

*-

*- Toa Oil

Kawasaki Japan

110

Crude Distillation

8

05

15

11

06

05

005

Crude Distillation

8

*-

*-

11

*-

*-

11 Tesiki Kubiki Japan Topping Plant *- Pertamina Balikpapa Kalimanta Indonesia n n

260

General outage, turnaround, or closure

8

*-

*-

13

*-

*-

*- Fuji Oil

Japan

192

Crude Distillation

7

11

15

10

*-

*-

*- Nigerian Kaduna National Petroleum

Nigeria

110

General Equipment

7

11

21

10

*-

*-

*- Nigerian Warri National Petroleum

Nigeria

125

General Equipment

4

09

*-

10

*-

*-

*- Royal Dutch Shell

Pernis, Rotterda m

Netherlan ds

406

Fluid Catalytic Cracking

1

11

10

10

11

19

10 Hess

Port Reading

NJ

US

070

Fluid Catalytic Cracking

1

11

18

10

11

19

10 BP

Carson

CA

US

252

General outage, turnaround, or closure

Keihin

Sodegaur a

Chiba

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

20

10

11

20

10 ExxonMobi Baton l Rouge

LA

US

505

General outage, turnaround, or closure

1

11

20

10

11

23

10 LyondellB Houston asell

TX

US

268

General outage, turnaround, or closure

1

11

20

10

11

21

10 Frontier Oil El Dorado

KS

US

135

1

11

23

10

11

24

IL

US

238

1

11

24

10

11

24

10 ExxonMobi Joliet l 10 ConocoPhi Wood llips River

IL

US

306

General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking

1

11

24

10

11

24

10 ExxonMobi Beaumon l t

TX

US

345

General outage, turnaround, or closure

1

11

24

10

11

24

10 Big West Oil

Salt Lake City

UT

US

030

General Equipment

1

11

26

10

11

27

Port Arthur

TX

US

174

Sulfur Plant

1

11

26

10

11

26

10 Total Petrochem icals 10 Valero Energy

Port Arthur

TX

US

250

General Equipment

1

11

26

10

11

26

10 Shell Oil

Martinez

CA

US

145

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

26

10

11

26

10 Tesoro

Kapolei

HI

US

094

General outage, turnaround, or closure

1

11

27

10

11

27

10 ConocoPhi Borger llips

TX

US

146

General outage, turnaround, or closure

1

09

22

10

11

23

10 ConocoPhi Linden llips

NJ

US

238

General outage, turnaround, or closure

1

10

15

10

11

20

Detroit

MI

US

102

1

10

15

10

11

22

Lima

OH

US

162

General outage, turnaround, or closure Fluid Catalytic Cracking

1

10

15

10

11

22

Lima

OH

US

162

Coking

1

*-

*-

*-

11

24

10 Marathon Oil 10 Husky Energy 10 Husky Energy 10 Holly

UT

US

030

8

11

17

10

11

17

Taiwan

270

General outage, turnaround, or closure Crude Distillation

8

10

08

10

11

13

Japan

193

Crude Distillation

8

10

25

10

11

19

10 Showa Yokkaichi Shell Sekiyu 10 Reliance Jamnagar Industries

India

660

Crude Distillation

8

11

20

10

12

*-

10 Sinopec

Gaoqiao

China

230

Crude Distillation

8

11

20

10

12

*-

10 Sinopec

Gaoqiao

China

230

Coking

Woods Cross 10 CPC Corp. Kaohsiun g

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8

11

20

10

12

*-

10 Sinopec

Gaoqiao

4

09

11

10

11

19

10 ExxonMobi Sarpom l

6

10

15

10

11

14

6

01

15

11

*-

5

*-

*-

11

5

*-

*-

5

*-

5

230

Hydrocracking

Trecate Italy

230

Crude Distillation

10 Abu Dhabi Ruwais National Oil

Abu Dhabi UAE

350

Vapor Recovery/Gas Plant

*-

*- Abu Dhabi Ruwais National Oil

Abu Dhabi UAE

350

Vapor Recovery/Gas Plant

*-

*-

11 MOL

Százhalo mbatta

Hungary

161

General outage, turnaround, or closure

11

*-

*-

11 MOL

Hungary

161

*-

11

*-

*-

11 Slovnaft

Százhalo mbatta Bratislava

Slovakia

115

General outage, turnaround, or closure General outage, turnaround, or closure

*-

*-

11

*-

*-

11 INA

Rijeka

Croatia

090

General outage, turnaround, or closure

5

*-

*-

11

*-

*-

*- INA

Sisak

Croatia

080

General outage, turnaround, or closure

1

11

02

10

11

18

10 Citgo Lemont Petroleum

IL

US

159

Fluid Catalytic Cracking

1

11

12

10

*-

*-

*- Sunoco

PA

US

330

Hydrotreating

Philadelp hia

China

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

12

10

11

12

10 Motiva Port Enterprise Arthur s

TX

US

285

Fluid Catalytic Cracking

1

11

13

10

11

13

10 Chevron

MS

US

330

General outage, turnaround, or closure

1

11

15

10

11

19

10 Alon USA Big Energy Spring

TX

US

070

Fluid Catalytic Cracking

1

11

15

10

11

15

10 Valero Energy

Corpus Christi

TX

US

205

General outage, turnaround, or closure

2

11

15

10

11

15

10 Imperial Oil

Sarnia

ON

Canada

121

General outage, turnaround, or closure

1

11

09

10

11

16

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

1

11

16

10

11

16

LA

US

227

General outage, turnaround, or closure

1

11

16

10

11

16

10 Motiva Convent Enterprise s 10 BP Texas City

TX

US

451

General Equipment

1

11

17

10

11

17

10 US Oil & Refining

Tacoma

WA

US

039

Sulfur Plant

1

11

17

10

*-

*-

*- Shell Oil

Anacorte s

WA

US

149

General outage, turnaround, or closure

1

11

18

10

11

19

10 Chevron

Richmon d

CA

US

243

Hydrotreating

1

11

04

09

11

15

10 Silver Eagle Refining

Woods Cross

UT

US

013

Crude Distillation

1

10

15

10

11

*-

10 Chevron

Richmon d

CA

US

243

Fluid Catalytic Cracking

Pascagou la

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

10

15

10

11

*-

3

10

*-

10

10

1

11

25

10

3

10

*-

8

09

6

10 Chevron

CA

*-

Richmon d 10 Petrobras Cubatao

US

243

Alkylation

Brazil

170

General outage, turnaround, or closure

12

21

10 BP

CA

US

252

General outage, turnaround, or closure

10

11

17

10 Petrobras Revap

Sao Jose Brazil dos Campos 10 Cosmo Oil Yokkaichi Japan

241

Visbreaking/Thermal Cracking

22

10

11

11

147

Crude Distillation

10

15

10

11

*-

10 Kuwait Mina AlNational Ahmadi Petroleum

466

Hydrotreating

4

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Hydrotreating

4

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Alkylation

4

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Hydrocracking

4

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Visbreaking/Thermal Cracking

4

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Crude Distillation

4

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Crude Distillation

Carson

Kuwait

Hydrocarbon Publishing Co. Copyright protected. 2008

71

4

*-

*-

11

*-

*-

11 Saras

Sarroch

300

Catalytic Reforming

1

11

05

10

11

05

10 Motiva Port Enterprise Arthur s

TX

US

285

Fluid Catalytic Cracking

1

11

06

10

11

07

1

11

06

10

11

06

10 ConocoPhi Borger llips 10 ExxonMobi Beaumon l t

TX

US

146

Fluid Catalytic Cracking

TX

US

345

General outage, turnaround, or closure

1

11

08

10

*-

*-

*- Shell Oil

CA

US

145

General outage, turnaround, or closure

1

11

09

10

11

09

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

1

11

10

10

11

10

10 Motiva Norco Enterprise s 10 Citgo Corpus Petroleum Christi

LA

US

220

General Equipment

1

11

10

10

11

11

TX

US

157

Aromatics Production/Recovery

1

11

10

10

11

10

10 Tesoro

Martinez

CA

US

161

General outage, turnaround, or closure

1

11

11

10

11

11

10 BP

Texas City

TX

US

451

Hydrotreating

1

11

12

10

11

12

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure

1

11

12

10

11

12

10 Valero Energy

TX

US

167

Waste Water Treatment

Martinez

McKee (Sunray)

Sardinia Italy

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

*-

*-

*-

11

12

10 Imperial Sarnia Oil 10 ExxonMobi Baytown l

ON

Canada

121

Utilities Production

1

08

*-

10

11

11

TX

US

576

Crude Distillation

1

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Hydrotreating

1

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Hydrotreating

1

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Hydrotreating

1

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Solvent Extraction and Deasphalting

2

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Crude Distillation

2

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Catalytic Reforming

Hydrocarbon Publishing Co. Copyright protected. 2008

71

2

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Fluid Catalytic Cracking

2

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Sulfur plant

1

10

01

10

11

09

10 National McPherso Cooperativ n e Refining

KS

US

083

General outage, turnaround, or closure

1

10

17

10

11

11

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure

1

11

15

10

11

26

10 BP

Carson

CA

US

252

8

10

*-

10

11

*-

10 Sinopec

Maoming Guangdo China ng

270

General outage, turnaround, or closure Crude Distillation

8

10

*-

10

11

*-

10 Sinopec

Maoming Guangdo China ng

270

Coking

8 8

11 03

03 *-

10 11

12 04

**-

240 310

Fluid Catalytic Cracking Crude Distillation

8

05

05

11

06

05

10 CNOOC Huizhou 11 Hyundai Daesan Oil 11 SK Energy Ulsan

817

Crude Distillation

8

07

15

11

08

25

11 SK Energy Ulsan

817

Crude Distillation

8

05

*-

11

*-

*-

*- S-Oil

520

Crude Distillation

8

06

15

11

07

25

11 SK Energy Inchon

270

Crude Distillation

4

11

01

10

*-

*-

*- Total

357

Visbreaking/Thermal Cracking

Onsan

Antwerp

China South Korea South Korea South Korea South Korea South Korea Belgium

Hydrocarbon Publishing Co. Copyright protected. 2008

71

4

11

04

10

11

20

10 Total

Vlissinge n

Netherlan ds

147

Hydrocracking

4 1

11 04

04 02

10 10

11 10

19 04

10 Total 10 Shell Oil

Donges Anacorte s

France US

230 149

Fluid Catalytic Cracking General outage, turnaround, or closure

3

10

05

10

10

29

10 PDVSA

Amuay

Venezuel a

640

Fluid Catalytic Cracking

1

10

27

10

11

02

10 ConocoPhi Rodeo llips

CA

US

120

General outage, turnaround, or closure

1

10

26

10

*-

*-

*- ConocoPhi Linden llips

NJ

US

238

General outage, turnaround, or closure

1

11

02

10

11

02

10 ConocoPhi Linden llips

NJ

US

238

Utilities Production

2

10

28

10

11

01

10 Shell Canada

Sarnia

ON

Canada

071

General outage, turnaround, or closure

1

10

30

10

10

30

10 Valero Energy

Three Rivers

TX

US

096

Hydrotreating

1

11

01

10

11

01

10 Murphy Oil Superior

WI

US

033

General outage, turnaround, or closure

1

11

01

10

11

01

11 Valero Energy

CA

US

080

General Equipment

Wilmingt on

WA

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

02

10

11

02

10 ExxonMobi Baytown l

TX

US

576

Fluid Catalytic Cracking

1

11

03

10

11

03

US

306

General Equipment

11

03

10

11

03

Wood River Norco

IL

1

LA

US

220

General Equipment

1

11

03

10

11

03

10 ConocoPhi llips 10 Motiva Enterprise s 10 ConocoPhi llips

Borger

TX

US

146

Fluid Catalytic Cracking

1

11

02

11

11

03

11 Delek Refining

Tyler

TX

US

060

Sulfur Plant

1

11

04

10

11

04

10 Tesoro

Wilmingt on

CA

US

100

Hydrocracking

1

11

04

10

*-

*-

*- Alon USA Paramou Energy nt

CA

US

088

General outage, turnaround, or closure

1

09

07

10

11

06

10 ConocoPhi Belle llips Chasse

LA

US

247

Fluid Catalytic Cracking

1

10

04

10

11

01

10 Suncor

QB

Canada

130

1

*-

*-

*-

10

31

10 Motiva Port Enterprise Arthur s

TX

US

285

General outage, turnaround, or closure Fluid Catalytic Cracking

1

*-

*-

*-

10

31

10 ConocoPhi Wilmingt llips on

CA

US

139

Fluid Catalytic Cracking

Montréal

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

01

10

11

15

10 ConocoPhi Wilmingt llips on

CA

US

139

Alkylation

2

11

02

10

*-

*-

Scotford

AB

Canada

100

1

11

05

10

*-

*-

*- Shell Canada *- Tesoro

Martinez

CA

US

161

General outage, turnaround, or closure General outage, turnaround, or closure

1

11

05

10

11

12

10 BP

Carson

CA

US

252

1

11

30

10

12

*-

10 Holly

Tulsa

OK

US

125

1

01

15

11

*-

*-

El Paso

TX

US

125

1

*-

*-

11

*-

*-

Gallup

NM

US

023

6

10

23

10

10

25

09

07

10

*-

*-

Saudi Arabia Mexico

400

3

*- Western Refining *- Western Refining 10 Saudi Aramco 11 Pemex

1

10

22

10

10

22

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure

1

10

24

10

10

24

10 BP

Whiting

IN

US

385

Sulfur Plant

1

10

24

10

10

24

10 Delek Refining

Tyler

TX

US

060

Fluid Catalytic Cracking

1

10

24

10

10

24

10 Delek Refining

Tyler

TX

US

060

Alkylation

1

10

25

10

10

25

10 Citgo Lemont Petroleum

IL

US

159

General outage, turnaround, or closure

Rabigh Cadereyt a

275

Hydrocarbon Publishing Co. Copyright protected. 2008

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Hydrotreating

71

1

10

27

10

10

27

10 Citgo Lemont Petroleum

IL

US

159

General outage, turnaround, or closure

1

10

25

10

10

25

10 ConocoPhi Westlake llips

LA

US

239

General outage, turnaround, or closure

1

10

26

10

10

27

10 ConocoPhi Linden llips

NJ

US

238

General outage, turnaround, or closure

1

10

26

10

10

26

LA

US

083

1

10

26

10

11

02

10 Alon USA Energy 10 Valero Energy

TX

US

250

General outage, turnaround, or closure Isomerization

1

10

22

10

10

27

10 ConocoPhi Rodeo llips

CA

US

120

General outage, turnaround, or closure

1

10

28

10

10

28

IL

US

306

1

10

28

10

10

28

1

10

28

10

10

28

1

10

28

10

10

28

10 ConocoPhi llips 10 ExxonMobi l 10 Husky Energy 10 ExxonMobi l

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Hydrocracking

Krotz Springs Port Arthur

Wood River Baton Rouge Lima

LA

US

505

OH

US

162

Baytown

TX

US

576

Hydrocarbon Publishing Co. Copyright protected. 2008

71

2

10

28

10

10

28

10 Shell Canada

1

10

29

10

10

29

2

09

11

10

10

1

10

04

10

1

10

12

1

10

1

Scotford

AB

Canada

100

General outage, turnaround, or closure

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

27

10 Suncor

ON

Canada

085

10

29

10 Flint Hills Corpus Resources Christi

TX

US

279

General outage, turnaround, or closure Hydrocracking

10

10

23

10 Suncor

AB

Canada

135

16

10

10

23

IL

US

204

General outage, turnaround, or closure Crude Distillation

10

27

10

10

27

10 Marathon Oil 10 Valero Energy

Edmonto n Robinson Corpus Christi

TX

US

205

Crude Distillation

1

01

*-

11

*-

*-

Houston

TX

US

268

Fluid Catalytic Cracking

1

01

*-

11

*-

*-

US

250

Crude Distillation

01

*-

11

*-

*-

TX

US

250

Coking

1

01

*-

11

02

*-

Port Arthur Port Arthur Benicia

TX

1

CA

US

140

1

03

*-

11

*-

*-

TX

US

167

General outage, turnaround, or closure Hydrocracking

1

08

25

10

10

16

*- LyondellB asell *- Valero Energy *- Valero Energy 11 Valero Energy *- Valero Energy 10 ExxonMobi l

TX

US

576

Hydrotreating

8

09

21

10

10

21

120

Crude Distillation

10 10

03 12

10 10

10 10

18 19

Tokuyam a Cadiz Muroran

Japan

4 8

10 Idemitsu Kosan 10 CEPSA 10 JX Holdings

Spain Japan

240 180

Crude Distillation Catalytic Reforming

8

10

12

10

10

19

10 JX Holdings

Muroran

Japan

180

Hydrotreating

Sarnia

McKee (Sunray) Baytown

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8

10

21

10

11

21

10 Idemitsu Kosan

8

08

*-

10

10

16

8

08

*-

10

10

8

08

*-

10

8

10

25

7

02

4

Chita

Aichi

Japan

152

General outage, turnaround, or closure

10 Cosmo Oil Sakai

Japan

076

Coking

16

10 Cosmo Oil Sakai

Japan

076

Hydrotreating

10

16

10 Cosmo Oil Sakai

Japan

076

Hydrotreating

10

11

*-

10 Reliance Jamnagar Industries

India

660

Coking

*-

11

*-

*-

11

Khartoum

Sudan

050

03

*-

11

04

*-

11 Eni

Gela

General outage, turnaround, or closure General outage, turnaround, or closure

4

08

31

11

09

*-

11 BP

Lingen

Germany

086

General outage, turnaround, or closure

5

10

*-

11

*-

*-

11 BP

Gelsenkir chen

Germany

264

General outage, turnaround, or closure

3

10

16

10

10

18

10 Petrotrin

Pointe-aPierre

168

General outage, turnaround, or closure

1

10

19

10

*-

*-

10 Coffeyville Coffeyvill Resources e

Trinidad and Tobago US

114

General outage, turnaround, or closure

Ragusa Italy

KS

105

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

10

19

10

10

20

10 Valero Energy

Corpus Christi

TX

US

205

Isomerization

1

10

19

10

10

19

10 Valero Energy

Wilmingt on

CA

US

080

General Equipment

1

10

20

10

10

20

10 ExxonMobi Baytown l

TX

US

576

General Equipment

1

10

21

10

10

21

IL

US

238

1

10

21

10

*-

*-

10 ExxonMobi Joliet l 10 ExxonMobi Baytown l

TX

US

576

General outage, turnaround, or closure Crude Distillation

1

11

*-

10

*-

*-

*- ConocoPhi Belle llips Chasse

LA

US

247

Alkylation

1

10

15

10

*-

*-

Detroit

MI

US

102

1

10

15

10

11

25

Lima

OH

US

162

General outage, turnaround, or closure Coking

1

10

15

10

11

25

Lima

OH

US

162

Fluid Catalytic Cracking

1

10

18

10

10

18

*- Marathon Oil 10 Husky Energy 10 Husky Energy 10 Motiva Enterprise s

Port Arthur

TX

US

285

Sulfur Plant

1

*-

*-

10

10

18

TX

US

247

Sulfur plant

1

*-

*-

10

10

22

10 ConocoPhi Sweeny llips 10 BP Texas City

TX

US

451

Hydrotreating

1

10

22

10

11

08

10 BP

CA

US

252

General outage, turnaround, or closure

Carson

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

09

30

10

10

14

10 Tesoro

Martinez

CA

US

161

Fluid Catalytic Cracking

1

10

04

10

10

04

10 Shell Oil

Martinez

CA

US

145

1

10

05

10

10

14

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure Hydrotreating

1

10

09

10

10

09

10 Tesoro

Martinez

CA

US

161

General Equipment

1

10

06

10

10

10

10 Chalmette Chalmett Refining e

LA

US

193

General Equipment

3

10

06

10

10

16

10 Hovensa

Virgin US Islands

500

Fluid Catalytic Cracking

1

10

08

10

10

08

10 Flint Hills Corpus Resources Christi

279

General Equipment

St. Croix

TX

US

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

10

09

10

10

09

10 Sinclair Oil Sinclair

WY

US

066

Sulfur Plant

1

10

09

10

10

09

10 Sinclair Oil Sinclair

WY

US

066

Sulfur Plant

1

10

12

10

10

12

10 Valero Energy

Three Rivers

TX

US

096

Sulfur Plant

1

10

14

10

10

*-

10 ConocoPhi Linden llips

NJ

US

238

General Equipment

1

10

14

10

10

*-

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

1

10

14

10

10

*-

10 ExxonMobi Baton l Rouge

LA

US

505

General outage, turnaround, or closure

1

10

14

10

10

14

10 Delek Refining

Tyler

TX

US

060

Fluid Catalytic Cracking

1

10

09

10

*-

*-

Convent

LA

US

227

Sulfur Plant

2

10

12

10

10

25

Canada

187

10

13

10

10

20

Edmonto n Carson

AB

1

10 Motiva Enterprise s 10 Imperial Oil 10 BP

CA

US

252

1

10

14

10

10

15

10 Tesoro

CA

US

100

1

10

16

10

10

17

10 Husky Energy

Wilmingt on Lima

OH

US

162

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Utilities Production

Hydrocarbon Publishing Co. Copyright protected. 2008

71

3

08

*-

10

10

07

10 Petroecua Esmerald dor as

Ecuador

110

Crude Distillation

8

09

27

10

09

29

Japan

210

Fluid Catalytic Cracking

8

09

27

10

10

05

Japan

340

Fluid Catalytic Cracking

8

10

05

10

*-

*-

10 Kashima Kashima Oil 10 JX Negishi Holdings *- Cosmo Oil Sakai

Japan

076

Fluid Catalytic Cracking

8

09

19

10

10

15

Negishi

Japan

340

Crude Distillation

8

10

04

10

11

02

250

Crude Distillation

10

02

10

*-

*-

Mizushim a Westlake

Japan

1

10 JX Holdings 10 JX Holdings *- ConocoPhi llips

LA

US

239

General outage, turnaround, or closure

1

10

02

10

10

02

10 ConocoPhi Sweeny llips

TX

US

247

General Equipment

1

10

04

10

10

05

10 Chevron

UT

US

045

Sulfur Plant

1

10

05

10

10

05

TX

US

146

Coking

1

10

06

10

10

06

10 ConocoPhi Borger llips 10 BP Toledo

OH

US

152

General outage, turnaround, or closure

1

10

06

10

10

06

10 ConocoPhi Rodeo llips

CA

US

120

H2 Production/Purification/Rec overy

1

10

07

10

10

07

TX

US

327

1

10

08

10

*-

*-

10 Deer Park Deer Park Refining 10 Valero Norco Energy

LA

US

310

General outage, turnaround, or closure General Equipment

1

10

02

10

10

04

10 BP

Texas City

TX

US

451

Catalytic Reforming

2

10

04

10

*-

*-

*- Shell Canada

Montréal

QB

Canada

121

General outage, turnaround, or closure

Salt Lake City

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8

07

25

10

10

14

10 Formosa Mailiao Petrochem ical

Taiwan

540

Crude Distillation

8

10

05

10

10

12

10 Cosmo Oil Sakai

Japan

076

Fluid Catalytic Cracking

8

10

09

10

11

11

10 CPC Corp. Talin

Taiwan

300

Crude Distillation

8

11

01

10

12

06

10 CPC Corp. Taoyuan

Taiwan

200

Hydrotreating

8

12

*-

10

*-

*-

*- CPC Corp. Taoyuan

Taiwan

200

Crude Distillation

8

11

*-

10

11

*-

10 Sinopec

270

Coking

8

12

*-

10

01

*-

11 Sinopec

Maoming Guangdo China ng Jiujiang Jiangxi China

080

Fluid Catalytic Cracking

8

03

*-

11

06

*-

11 Caltex

Kurnell

Australia

106

Fluid Catalytic Cracking

7

10

07

10

10

13

10 Engen Durban Petroleum

South Africa

119

General outage, turnaround, or closure

4

*-

*-

11

*-

*-

11 Royal Dutch Shell

Pernis, Rotterda m

Netherlan ds

406

General outage, turnaround, or closure

4

09

*-

10

10

*-

10 Royal Dutch Shell

Pernis, Rotterda m

Netherlan ds

406

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

11

04

09

02

17

10 Silver Eagle Refining

7

10

01

10

11

15

8

08

27

09

09

8

03

*-

11

1

09

13

1

09

1

Woods Cross

UT

US

013

Crude Distillation

10 Indeni Oil Ndola

Zambia

024

General outage, turnaround, or closure

28

09 Cosmo Oil Sakai

Japan

076

Crude Distillation

04

*-

11 West Dalian Pacific Petrochem icals

China

160

General outage, turnaround, or closure

10

*-

*-

*- Chevron

Pascagou la

MS

US

330

Hydrocracking

24

10

09

25

TX

US

070

09

25

10

*-

*-

10 Alon USA Big Energy Spring 10 Sunoco Philadelp hia

PA

US

330

General outage, turnaround, or closure Hydrotreating

1

09

27

10

*-

*-

10 Valero Energy

Texas City

TX

US

225

General Equipment

1

09

27

10

*-

*-

10 Valero Energy

Port Arthur

TX

US

250

General Equipment

1

09

27

10

09

27

10 Valero Energy

Benicia

CA

US

140

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

09

27

10

09

27

10 ExxonMobi Torrance l

CA

US

150

General outage, turnaround, or closure

1

09

28

10

09

29

10 Murphy Oil Meraux

LA

US

125

General outage, turnaround, or closure

1

09

29

10

09

29

10 Flint Hills Corpus Resources Christi

TX

US

279

Fluid Catalytic Cracking

1

09

30

10

09

30

10 BP

Texas City

TX

US

451

General Equipment

3

*-

*-

10

09

30

10 Hovensa

St. Croix

Virgin US Islands

500

Fluid Catalytic Cracking

1

09

27

10

09

27

10 BP

Texas City

TX

US

451

Crude Distillation

1

09

28

10

10

04

10 BP

Carson

CA

US

252

General outage, turnaround, or closure

2 2 2 2 1

09 09 09 09 09

29 29 29 29 30

10 10 10 10 10

11 11 11 11 10

03 03 03 03 05

10 10 10 10 10

St. John St. John St. John St. John Martinez

NB NB NB NB CA

Canada Canada Canada Canada US

250 250 250 250 145

Crude Distillation Catalytic Reforming Fluid Catalytic Cracking Sulfur plant Fluid Catalytic Cracking

1

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Crude Distillation

Irving Oil Irving Oil Irving Oil Irving Oil Shell Oil

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Hydrotreating

1

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Hydrotreating

1

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Aromatics Production/Recovery

1

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Isomerization

Hydrocarbon Publishing Co. Copyright protected. 2008

71

he drop-down buttons will appear in black.

dle East, (7) Africa, (8) Asia-Pacific Unit / plant

FCCU

FCCU

HCU

Reformer

CDU

FCCU

Unit size, Production Additional details Planned/ Date of last K b/d impact, K unplanned update b/d N.A. N.A. An FCCU will be closed for p 27-Dec-10 around 40 days of planned work in early Jan. 2011. Another FCCU will be shut for maintenance in 2012. 024.0 024.0 A four-week turnaround that p 27-Dec-10 commenced at the end of Nov. is expected to be completed at the end of Dec. N.A. N.A. *Several units, including an p 27-Dec-10 HCU and a reformer, will undergo planned maintenance this autumn, according to sources close to the refinery. N.A. N.A. *Several units, including an p 27-Dec-10 HCU and a reformer, will undergo planned maintenance this autumn, according to sources close to the refinery. N.A. N.A. *The No. 2B CDU was u 27-Dec-10 restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage. N.A. N.A. *The No. 2B CDU was u 27-Dec-10 restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage.

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

N.A.

N.A.

u

27-Dec-10

200.0

*The No. 2B CDU was restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage. N.A.

FCCU

200.0

p

27-Dec-10

FCCU

035.5

N.A.

N.A.

u

27-Dec-10

Maintenance

N.A.

N.A.

p

27-Dec-10

CDU

075.0

147.0

Maintenance on an unspecified process unit slightly impacted production. *The refinery was temporarily halted by a power outage on Dec. 7. The No. 6, 75K-b/d CDU, which was shut down by the power failure, was restarted on Dec. 13, while the No. 5, 50K-b/d CDU and other primary refining units were restarted on Dec. 18.

u

27-Dec-10

CDU

050.0

147.0

*The refinery was temporarily halted by a power outage on Dec. 7. The No. 6, 75K-b/d CDU, which was shut down by the power failure, was restarted on Dec. 13, while the No. 5, 50K-b/d CDU and other primary refining units were restarted on Dec. 18.

u

27-Dec-10

FCCU

N.A.

N.A.

The FCCU, which was taken down on Dec. 7 for a repair, was expected to be restarted earlier in the month; however, Valero reported on Dec. 20 that the FCCU will remain shut until after a refinery turnaround is completed. The maintenance is slated to start in Jan. 2011 and span 36 days.

u

27-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

SRU

N.A.

N.A.

u

27-Dec-10

u

27-Dec-10

031.0

Excess emissions occurred at the SCOT-4 SRU tail gas incinerator, due to a failed flame scanner at the unit's inline heater. Production was not affected. Emissions also occurred when the unit was restarted on Dec. 19. An explosion at a heavy oil upgrader hit a 45K-b/d HTU, killing one worker and injuring six others. The unit continued to operate, despite the impact, although rates at the related vacuum residue desulfurizing unit were lowered. Korean media reported that a gas leak during maintenance was the cause of the explosion, but the company did not confirm this report. The unit was shut for repairs.

HTU

045.0

045.0

FCCU

031.0

u

27-Dec-10

VGO unit

100.0

100.0

N.A.

p

27-Dec-10

Fire

N.A.

N.A.

A fire occurred, due to a leak. Four workers were injured in the blaze, which was later extinguished. The incident did not impact production.

u

27-Dec-10

Pipeline

N.A.

N.A.

u

27-Dec-10

Pipeline

N.A.

N.A.

u

27-Dec-10

Flare

N.A.

N.A.

The refinery was closed on or around Dec. 22, due to sabotage on Dec. 6 at a pipeline supplying crude to the plant. The refinery was closed on or around Dec. 22, due to sabotage on Dec. 6 at a pipeline supplying crude to the plant. Sulfur dioxide releases occurred at the refinery as a result of maintenance activity.

u

27-Dec-10

WGC

N.A.

N.A.

A wet gas compressor tripped offline. The incident led to the release of sulfur dioxide.

u

27-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Fire

N.A.

N.A.

A small fire and a unit upset occurred late in the day. The blaze was quickly contained, with no impact to production.

u

27-Dec-10

FCCU

N.A.

N.A.

u

27-Dec-10

Alkylation unit

N.A.

N.A.

u

27-Dec-10

Fire

N.A.

N.A.

u

27-Dec-10

Valve

N.A.

N.A.

u

27-Dec-10

Fire

N.A.

N.A.

u

27-Dec-10

Flare

N.A.

N.A.

u

27-Dec-10

Pipeline

N.A.

N.A.

u

27-Dec-10

HCU

N.A.

N.A.

p

27-Dec-10

Maintenance

N.A.

N.A.

An FCCU and an alkylation unit were knocked offline, but the units were restarted and returned to normal operations later in the day. An FCCU and an alkylation unit were knocked offline, but the units were restarted and returned to normal operations later in the day. A unit upset and fire led to flaring of hydrogen sulfide and sulfur dioxide. Emissions were released from the SRU and a SCOT unit, due to a faulty solenoid valve. The glitch forced the closure of the process air valves. An explosion and fire at a tanker truck parked on refinery grounds threatened nearby tanks, but firefighters were able to extinguish the blaze before it spread to the tanks. Damage to the rest of the refinery was said to be minimal. Sulfur dioxide was released from a flare, due to an electrical malfunction. Power was restored, and affected units were restarted shortly thereafter. A propane leak on a gas cracker line was expected to be repaired on Dec. 23. A hydrocracker at the east plant was closed for repairs, leading to emissions. The unit has been closed several times in the past week for repairs on an exchanger and piping. N.A.

p

27-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

150.0

150.0

The No. 4 CDU was restarted following a shutdown due to a minor leak.

u

20-Dec-10

CDU

086.0

086.0

N.A.

p

20-Dec-10

FCCU

025.5

025.5

N.A.

p

20-Dec-10

CDU

240.0

240.0

N.A.

p

20-Dec-10

CDU

165.0

165.0

N.A.

p

20-Dec-10

Outage

N.A.

116.0

The refinery, which was taken offline for an unplanned shutdown on Oct. 30, was expected to restart late in the week to Dec. 18 or in the following week. A leak in the plant's cooling system resulted in damage to several units, including the coker.

u

20-Dec-10

HCU

N.A.

N.A.

The Unipetrol-owned refinery suffered a small fire that damaged a hydrocracker.

u

20-Dec-10

Hydrogen unit

N.A.

N.A.

u

20-Dec-10

Outage

N.A.

094.0

u

20-Dec-10

Reformer

N.A.

N.A.

p

20-Dec-10

Hydrogen unit

N.A.

N.A.

p

20-Dec-10

Maintenance

N.A.

119.0

Two weeks of flaring could occur while repairs are made to a hydrogen unit. The entire refinery was knocked offline by a technical glitch. *Processing units, including a reformer and a hydrogen plant, were down for maintenance. *Processing units, including a reformer and a hydrogen plant, were down for maintenance. N.A.

p

20-Dec-10

Maintenance

N.A.

N.A.

The southern part of the refinery will be shut for planned work in 1Q 2011.

p

20-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Fire

N.A.

N.A.

Power was fully restored over the weekend of Dec. 11-12, following a small fire at an electrical switching station on Dec. 9 that resulted in flaring and power outages in some areas of the refinery. The plant is expected to be back at planned rates by Dec. 14.

u

20-Dec-10

Outage

N.A.

N.A.

u

20-Dec-10

Outage

N.A.

N.A.

u

20-Dec-10

Compressor

N.A.

N.A.

u

20-Dec-10

Outage

N.A.

N.A.

Unplanned flaring was reported. H2S was released during a brief equipment failure. An outage at a wet gas compressor caused flaring. An equipment failure resulted in an emergency flare and the release of sulfur dioxide.

u

20-Dec-10

Outage

N.A.

N.A.

u

20-Dec-10

Fire

N.A.

N.A.

A process unit overpressurized, leading to the release of "sour hydrocarbons." A flash fire erupted at the west plant.

u

20-Dec-10

Outage

N.A.

N.A.

u

20-Dec-10

FCCU

N.A.

N.A.

p

20-Dec-10

Boiler

N.A.

N.A.

p

20-Dec-10

HCU

N.A.

N.A.

p

20-Dec-10

Flare

N.A.

N.A.

p

20-Dec-10

Maintenance

N.A.

N.A.

An operational upset resulted in the release of sulfur dioxide. The planned shutdown of an FCCU for compressor repairs was expected to require flaring. Emissions occurred during maintenance at an ESP boiler. The unit was shut for maintenance on an exchanger. The refiner warned of planned flaring. N.A.

p

20-Dec-10

CDU

050.0

N.A.

*The refiner postponed planned maintenance on a CDU and a coker from Dec. 2010 to March 2011, due to a delay in materials delivery and high diesel demand.

p

13-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Coker

028.0

N.A.

*The refiner postponed planned maintenance on a CDU and a coker from Dec. 2010 to March 2011, due to a delay in materials delivery and high diesel demand. The older, 45K-b/d CDU will be stopped for planned work in Jan. 2011. The work was delayed from 2Q 2010, as a new, 65K-b/d CDU commenced production in June. The unit was shut down to repair a wet gas compressor.

p

13-Dec-10

CDU

045.0

N.A.

p

13-Dec-10

FCCU

070.0

N.A.

u

13-Dec-10

Electrical

N.A.

N.A.

Heavy rains on Dec. 2 caused a power outage and forced the refinery to close, but the plant was operating at 70% of capacity as of Dec. 7.

u

13-Dec-10

Pump

N.A.

N.A.

u

13-Dec-10

Outage

N.A.

N.A.

u

13-Dec-10

Outage

N.A.

N.A.

u

13-Dec-10

HTU

N.A.

N.A.

An equipment failure on a pump caused a benzene release. XOM reported emissions of benzene and hydrogen sulfide due to an equipment failure. The refinery experienced instrumentation problems. Sulfur dioxide escaped from a flare due to cold weather. Citgo halted the flaring and performed a partial shutdown involving an HTU.

u

13-Dec-10

Compressor

N.A.

N.A.

u

13-Dec-10

Electrical

N.A.

N.A.

A compressor tripped offline, causing a benzene release. A power outage occurred.

u

13-Dec-10

Tank

N.A.

N.A.

Flaring occurred from a PSV on a tank. The refiner adjusted operations to decrease pressure in the tank.

u

13-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

An upset in a process unit caused flaring and forced Tesoro to depressurize the unit, but was not expected to prevent the refinery from meeting supply commitments. Nitric oxide was released from the ammonia system on the C train. An emissions release occurred due to unknown causes. An unidentified unit was closed to repair a leaking pipe. N.A.

u

13-Dec-10

Outage

N.A.

N.A.

u

13-Dec-10

Outage

N.A.

N.A.

u

13-Dec-10

Pipeline

N.A.

N.A.

u

13-Dec-10

Outage

N.A.

110.0

u

13-Dec-10

Sulfur plant

N.A.

N.A.

Two sulfur plants tripped offline, resulting in flaring.

u

13-Dec-10

Compressor

N.A.

N.A.

u

13-Dec-10

FCCU Maintenance

N.A. N.A.

N.A. N.A.

Ethylene and nitrogen oxide were released from a flare, due to a failure at an electrical breaker, which led to the shutdown of a coker wet gas compressor. N.A. N.A.

p p

13-Dec-10 13-Dec-10

Ultracracker

N.A.

N.A.

An Ultracracker and a catalytic feed hydrotreater resumed operations on Dec. 8. Flaring was expected to occur during the restarts and last until Dec. 12.

p

13-Dec-10

HTU

N.A.

N.A.

An Ultracracker and a catalytic feed hydrotreater resumed operations on Dec. 8. Flaring was expected to occur during the restarts and last until Dec. 12.

p

13-Dec-10

CDU

075.0

075.0

u

6-Dec-10

CDU

100.0

N.A.

The No. 6 CDU was restarted following several days of minor repair work. The unit and related facilities will be shut in late Feb. 2011 for scheduled maintenance.

p

6-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Fire

N.A.

012.0

A fire broke out at a distillation plant; the blaze was extinguished shortly thereafter. The fire was the third to occur at the refinery in the space of a year; in Dec. 2009, two tank fires broke out within five days of one another. An investigation into the most recent incident has been launched.

u

6-Dec-10

Tank

N.A.

N.A.

u

6-Dec-10

Maintenance

N.A.

N.A.

p

6-Dec-10

CDU

150.0

150.0

p

6-Dec-10

Maintenance

N.A.

N.A.

p

6-Dec-10

FCCU

102.0

061.0

u

6-Dec-10

Alkylation unit

N.A.

N.A.

An accident occurred at a bitumen tank, which must be cooled, emptied, and repaired. Refinery production was not impacted by the incident. Some production units were temporarily shut down. The unit will be closed for about 45 days of maintenance, according to a trade source. The refinery will be shut for maintenance from late April 2011 to the end of May. The closure will significantly impact the production and supply of naphtha. *Rates at the FCCU were cut to 60% of capacity on Nov. 23 as the restart of the alkylation unit was delayed by around two weeks, to the end of Nov. Maintenance on the units began in Aug.; the FCCU was restarted in Oct. and is expected to return to full rates over the weekend of Dec. 4-5. *Rates at the FCCU were cut to 60% of capacity on Nov. 23 as the restart of the alkylation unit was delayed by around two weeks, to the end of Nov. Maintenance on the units began in Aug.; the FCCU was restarted in Oct.

u

6-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Electrical

N.A.

N.A.

A power outage occurred as a result of a glitch at a thirdparty electricity provider. The incident forced the temporary closure of some units. One of the units suffered an additional upset during a restart attempt.

u

6-Dec-10

Outage

N.A.

N.A.

u

6-Dec-10

SRU

N.A.

N.A.

Flaring and steam venting occurred. SRU No. 3 tripped, leading to the release of hydrogen sulfide and sulfur dioxide.

u

6-Dec-10

Outage

N.A.

N.A.

u

6-Dec-10

Outage

N.A.

N.A.

u

6-Dec-10

FCCU

N.A.

N.A.

u

6-Dec-10

FCCU

N.A.

N.A.

An equipment failure and unit malfunction resulted in the release of benzene. A malfunction resulted in the release of sulfur dioxide. Unplanned emissions at the unit were reported. N.A.

u

6-Dec-10

Butamer unit

N.A.

N.A.

u

6-Dec-10

Electrical

N.A.

640.0

u

6-Dec-10

FCCU

N.A.

N.A.

Butamer unit No. 36 in the west plant was closed to repair a leak at the boiler feed water system. An electrical problem forced the temporary closure of the plant. N.A.

u

6-Dec-10

Valve

N.A.

N.A.

u

6-Dec-10

Fuel gas treater

N.A.

N.A.

u

6-Dec-10

Pipeline

N.A.

N.A.

A leaking valve at the coker gas plant resulted in flaring. The refiner isolated a failure at one of the plant's fuel gas treating units. The unit is being restored to normal rates, and all customer needs are being met. Emissions occurred after a leak was located on a line between the process units and a pump. The leak was isolated and workers blocked the line to stop the flaring.

u

6-Dec-10

Hydrogen unit

N.A.

N.A.

A hydrogen unit was briefly knocked offline, due to an electrical mishap.

u

6-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

The unit tripped, resulting in flaring. Heavy rains forced refinery processing to a minimum, but later improvement in the weather allowed processing units to resume normal operations. A boiler malfunction resulted in overpressurization of another unit and flaring. The problem was isolated, and production was minimally impacted. Several units, including one of the catalytic units, an HDS, and a viscosity reducer, were restarted from maintenance.

u

6-Dec-10

Outage

N.A.

N.A.

u

6-Dec-10

Boiler

N.A.

N.A.

u

6-Dec-10

Maintenance

N.A.

N.A.

p

6-Dec-10

Reformer Maintenance

N.A. N.A.

N.A. N.A.

N.A. N.A.

p p

6-Dec-10 6-Dec-10

Maintenance

N.A.

N.A.

Excess opacity occurred. The refiner said the incident was the result of a test to see if a different configuration would lower opacity overall.

p

6-Dec-10

Compressor

N.A.

N.A.

p

6-Dec-10

Maintenance

N.A.

N.A.

p

6-Dec-10

Maintenance

N.A.

N.A.

p

6-Dec-10

Maintenance

N.A.

N.A.

Maintenance and emissions associated with a high-stage compressor were reported. Sulfur dioxide was released through an incinerator during a turnaround. A planned release from the flare and heaters occurred. Minor maintenance work and planned flaring occurred.

p

6-Dec-10

RFCCU Maintenance

N.A. N.A.

N.A. N.A.

N.A. Planned maintenance at select areas of the refinery will result in expected flaring.

p p

6-Dec-10 6-Dec-10

HTU HCU CDU

N.A. N.A. 160.0

N.A. N.A. 160.0

p p u

6-Dec-10 6-Dec-10 29-Nov-10

CDU

140.0

140.0

N.A. N.A. The unit was restarted following a closure related to poor margins. N.A.

u

29-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Pump

N.A.

N.A.

A pumping unit was repaired.

u

29-Nov-10

Outage

N.A.

N.A.

u

29-Nov-10

CDU

120.0

120.0

u

29-Nov-10

CDU

005.0

005.0

The refiner reported a problem with an unspecified secondary that is expected to reduce middle distillate exports. The CDU will be permanently closed by Sept. 2011, as a result of weak domestic demand. N.A.

p

29-Nov-10

Maintenance

N.A.

260.0

p

29-Nov-10

CDU

140.0

140.0

p

29-Nov-10

Pipeline

N.A.

N.A.

The plant will be closed for scheduled maintenance in mid-2011. The unit will undergo planned work in 2013. Fuji decided to skip maintenance on the unit in 2011. The plant was forced to shut down after militant sabotage damaged the Warri-Escravos pipeline, which feeds crude to the refinery. The shutdown is not expected to impact supplies to fuel stations.

u

29-Nov-10

Pipeline

N.A.

N.A.

u

29-Nov-10

FCCU

N.A.

N.A.

p

29-Nov-10

FCCU

070.0

N.A.

u

29-Nov-10

Outage

N.A.

N.A.

The refinery was forced to shut down after militant activists blew up the WarriEscravos pipeline, which feeds crude to the plant. The shutdown is not expected to impact supplies to fuel stations. Shell has delayed the planned restart of an FCCU that was closed for maintenance in Sept., the company reported on Nov. 26. The unit was repaired after being knocked offline by a power outage. A process upset may have resulted in an H2S release the following day.

u

29-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

Electrical

N.A.

N.A.

Outage

N.A.

N.A.

Maintenance

N.A.

N.A.

FCCU

N.A.

N.A.

Fire

N.A.

N.A.

Pump

N.A.

N.A.

SRU

N.A.

N.A.

Compressor

N.A.

N.A.

Outage

N.A.

N.A.

A pinhole leak on a distillate line in a processing unit was discovered. The leak allowed light coker naphtha to escape. The refinery experienced a power outage on Nov. 20, due to an equipment failure at its electricity supplier, but the plant was restarted on Nov. 22. However, the refinery witnessed a small fire in an overhead line carrying diesel during the restart process on Nov. 23. The restart continued, despite the fire. Flaring of H2S occurred due to an equipment failure. Brief maintenance resulted in flaring. Operations at an FCCU were suspended after the unit tripped offline and emitted more than 500 lb (227 kg) of SO2. A small fire occurred at a processing area, but it was extinguished within half an hour, and the refinery continued to operate. Hydrogen fluoride was released due to a failure on a pump in an allocation unit. The pump was shut to contain the release. An air compressor trip forced the temporary shutdown of an SRU. Flaring from a wet gas compressor was reported after the unit, which is located at the saturated gas recovery plant, received light ends material from an unknown source. Production was not affected by the incident.

u

29-Nov-10

u

29-Nov-10

u

29-Nov-10

p

29-Nov-10

u

29-Nov-10

u

29-Nov-10

u

29-Nov-10

u

29-Nov-10

u

29-Nov-10

Natural gas and smoke were released at the refinery.

u

29-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Electrical

N.A.

N.A.

Tesoro reported an SO2 release due to a power outage. Power was quickly restored, and refinery operations were not impacted. Emissions were reported after a process upset. The emissions were routed to a control device. The refinery was restarted after longer-than-anticipated maintenance was completed.

u

29-Nov-10

Outage

N.A.

N.A.

u

29-Nov-10

Maintenance

N.A.

N.A.

p

29-Nov-10

Maintenance

N.A.

N.A.

N.A.

p

29-Nov-10

FCCU

N.A.

N.A.

N.A.

p

29-Nov-10

Coker

N.A.

N.A.

N.A.

p

29-Nov-10

Maintenance

N.A.

N.A.

N.A.

p

29-Nov-10

CDU

100.0

N.A.

u

22-Nov-10

CDU

075.0

075.0

A fire erupted at a pipe associated with the No. 7 CDU. The incident was quickly brought under control and operations were not impacted; however, two contract workers suffered slight burns. N.A.

p

22-Nov-10

CDU

330.0

330.0

N.A.

p

22-Nov-10

CDU

160.0

160.0

p

22-Nov-10

Coker

N.A.

160.0

*A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work. *A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work.

p

22-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

HCU

N.A.

160.0

CDU

N.A.

150.0

Condensate train

140.0

N.A.

Condensate train

140.0

N.A.

Maintenance

N.A.

N.A.

Maintenance

N.A.

N.A.

Maintenance

N.A.

N.A.

Maintenance

N.A.

N.A.

Maintenance

N.A.

N.A.

FCCU

N.A.

N.A.

HDS

N.A.

N.A.

*A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work. XOM halted jet fuel output at the plant on Sept. 13 after the CDU caught fire on Sept. 11, marking the second blaze in less than two weeks. The refinery was gradually ramping up rates by Nov. 19.

p

22-Nov-10

u

22-Nov-10

A condensate train and gasoline production plant were being restarted from maintenance. One of the two 140K-b/d condensate trains will be shut from mid-Jan. 2011 for planned work. Gasoline units will see planned maintenance in 2Q 2011. Diesel units will see planned maintenance in 3Q 2011. Maintenance will be carried out at gasoline and diesel units during 2Q 2011. Gasoline and diesel plants will see planned work in 2Q 2011. During 4Q 2011, gasoline and diesel units will undergo work. A brief fire knocked offline the FCCU. The unit remained offline until minor repairs were made. A worker was injured in a fire at an HDS unit. The unit, located in the Point Breeze section of the refinery, had been under turnaround for 10 days before the blaze erupted.

p

22-Nov-10

p

22-Nov-10

p

22-Nov-10

p

22-Nov-10

p

22-Nov-10

p

22-Nov-10

p

22-Nov-10

u

22-Nov-10

u

22-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

Various blowers shut down while circulating catalyst, causing opacity at an FCCU.

u

22-Nov-10

Outage

N.A.

N.A.

An equipment failure resulted in a leak in a process line.

u

22-Nov-10

ESP

N.A.

N.A.

u

22-Nov-10

Outage

N.A.

N.A.

u

22-Nov-10

Fire

N.A.

N.A.

Excess opacity was caused by an upset at the electrostatic precipitator (ESP). A restart of the ESP resulted in boiler emissions from an FCCU. Flaring was caused by excess pressure at a vessel in the east plant. A small fire broke out and was extinguished. No impact to production was seen.

u

22-Nov-10

Outage

N.A.

N.A.

u

22-Nov-10

Outage

N.A.

N.A.

u

22-Nov-10

Compressor

N.A.

N.A.

u

22-Nov-10

SRU

N.A.

N.A.

u

22-Nov-10

Flare

N.A.

N.A.

u

22-Nov-10

HTU

N.A.

N.A.

u

22-Nov-10

VDU

N.A.

N.A.

u

22-Nov-10

FCCU

N.A.

N.A.

Emissions were released during a restart of the refinery on Nov. 16. It was previously reported that repairs to the plant were being made on Nov. 9. A unit upset led to the release of sulfur dioxide and hydrogen sulfide. A sour water leak from a compressor in Power Unit 2 did not affect production. An operator error at the SRU resulted in flaring of sulfur dioxide. Erosion on the flare line resulted in the release of hydrogen sulfide. Shell is preparing to install a clamp over the line. Flaring was reported due to a compressor outage, which knocked offline an HTU. The firm prepared to restart a VDU that has been shut since a pipe explosion on Nov. 4, 2009. Several other units are still offline following the blast. N.A.

p

22-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Alkylation unit

N.A.

N.A.

N.A.

p

22-Nov-10

Maintenance

N.A.

N.A.

p

22-Nov-10

Flare

N.A.

N.A.

p

22-Nov-10

Cracker

N.A.

N.A.

Maintenance was carried out at distillation and hydrotreating units. Planned flaring is expected to occur from Nov. 25-Dec. 21. The refiner previously stated that flaring would also occur from Nov. 15-26. N.A.

p

22-Nov-10

CDU

050.0

050.0

p

15-Nov-10

Naphtha HDS

N.A.

N.A.

p

15-Nov-10

DSU

N.A.

N.A.

p

15-Nov-10

Alkylation unit

N.A.

N.A.

p

15-Nov-10

HCU

N.A.

N.A.

p

15-Nov-10

Visbreaker

N.A.

N.A.

p

15-Nov-10

Topping unit

N.A.

N.A.

p

15-Nov-10

VDU

N.A.

N.A.

The No. 5 CDU was be offline while planned work was carried out on secondary units. Two gasoline-making units that were shut for two weeks of planned work in mid-Oct. are still closed as of Nov. 10, as maintenance is taking longer than expected, the company said. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work.

p

15-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Reformer

N.A.

N.A.

Regenerator

N.A.

N.A.

FCCU

N.A.

N.A.

Outage

N.A.

N.A.

Outage

N.A.

N.A.

Outage

N.A.

N.A.

Compressor

N.A.

N.A.

Aromatics unit

N.A.

N.A.

Electrical

N.A.

N.A.

RHTU

N.A.

N.A.

Flare

N.A.

N.A.

Water treatment system

N.A.

N.A.

In 4Q 2011, runs will be cut at a catalytic reformer during scheduled work. Emissions occurred as the FCCU regenerator was being loaded with fresh catalyst and preheated, in preparation for startup. The catalyst loading was halted, and operations were returned to normal.

p

15-Nov-10

u

15-Nov-10

A processing glitch at the unit led to emissions. Emissions and an instrumentation failure were reported during a startup at the refinery. VOCs were released from a tank. An equipment failure led to the release of SO2. The company said it was working to fix the problem. Emissions associated with repairs at the plant were reported.

u

15-Nov-10

u

15-Nov-10

u

15-Nov-10

u

15-Nov-10

A compressor tripped offline, resulting in the release of SO2, NOX, and VOCs. The BTX unit was brought back online one day after being shut due to a benzene leak from a suction valve on a pump. A power outage abruptly shut down the refinery. Power was restored later that day, which allowed the refinery to begin the restart process.

u

15-Nov-10

u

15-Nov-10

u

15-Nov-10

Flaring was reported due to a frozen propane line linked to the residual hydrotreater. Emissions occured due to a slight overpressurization in a vessel. Set point pressure was raised to stop the flaring.

u

15-Nov-10

u

15-Nov-10

Sodium hydroxide was released from a water treatment system into the soil.

u

15-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Boiler

N.A.

N.A.

N.A.

u

15-Nov-10

CDU

N.A.

N.A.

*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.

p

15-Nov-10

HTU

N.A.

N.A.

*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.

p

15-Nov-10

Hydroformer

N.A.

N.A.

*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.

p

15-Nov-10

HDS

N.A.

N.A.

*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.

p

15-Nov-10

Deasphalting unit

N.A.

N.A.

*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.

p

15-Nov-10

CDU

N.A.

N.A.

*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.

p

15-Nov-10

Rheniformer

N.A.

N.A.

*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.

p

15-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.

p

15-Nov-10

Sulfur plant

N.A.

N.A.

*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.

p

15-Nov-10

Maintenance

N.A.

083.0

N.A.

p

15-Nov-10

Maintenance

N.A.

N.A.

p

15-Nov-10

Flare

N.A.

N.A.

Maintenance was performed on a number of units. Production was slightly impacted. Planned flaring is expected.

p

15-Nov-10

CDU

050.0

086.7

p

8-Nov-10

Coker

036.7

086.7

p

8-Nov-10

FCCU CDU

027.9 110.0

N.A. 110.0

*The two were closed from end-Oct. for maintenance that will last about 20 days, according to industry sources. *The two were closed from end-Oct. for maintenance that will last about 20 days, according to industry sources. N.A. N.A.

p p

8-Nov-10 8-Nov-10

CDU

260.0

260.0

N.A.

p

8-Nov-10

CDU

060.0

060.0

N.A.

p

8-Nov-10

CDU

240.0

240.0

N.A.

p

8-Nov-10

CDU

200.0

200.0

N.A.

p

8-Nov-10

Cracker

N.A.

N.A.

The refinery was evacuated following a gas leak at a naphtha cracker, which has been offline since the end of Sept. for maintenance.

u

8-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

HCU

N.A.

N.A.

FCCU Outage

N.A. N.A.

N.A. N.A.

FCCU

104.0

N.A.

Outage

N.A.

N.A.

Electrical

N.A.

N.A.

Transformer

N.A.

N.A.

Fire

N.A.

071.0

DSU

N.A.

N.A.

Electrical

N.A.

N.A.

Compressor

N.A.

N.A.

An HCU will be ramped down from Nov. 4-8 for maintenance through Nov. 20. Work includes catalyst change, inspections, and cleaning. N.A. The refinery, which has been shut since an explosion that killed seven workers, began restarting on Oct. 4 and was partially restarted, including the CDU, as of Oct. 19, but was delayed due to a boiler problem over the weekend of Oct. 23-24. The plant is expected to reach planned rates by Nov. 13.

p

8-Nov-10

p u

8-Nov-10 8-Nov-10

The unit was taken offline for repairs to fix problems with the unit's air distributor and regenerator. The refinery was back to planned rates following the loss of steam and hydrogen supplies. A portion of the refinery was still being restarted following complications from a power outage. A transformer switched, forcing the refiner to reroute power to another transformer.

u

8-Nov-10

u

8-Nov-10

u

8-Nov-10

u

8-Nov-10

A fire forced the closure of the refinery. The blaze, which occurred at an unspecified processing unit, was due to a failed gasket. A malfunction involving a valve at a DSU resulted in emissions. An external power failure knocked a unit offline and resulted in emissions of sulfur dioxide and hydrogen sulfide.

u

8-Nov-10

u

8-Nov-10

u

8-Nov-10

The unit tripped offline.

u

8-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

Operations at an FCCU were briefly disrupted when oxygen from an outside provider was cut. A wet gas compressor went down. A release of ethylene occurred while pumps were being swapped. A process upset at an FCCU resulted in emissions.

u

8-Nov-10

Compressor

N.A.

N.A.

u

8-Nov-10

Pump

N.A.

N.A.

u

8-Nov-10

FCCU

N.A.

N.A.

u

8-Nov-10

SRU

N.A.

N.A.

An isolated power blip at an SRU resulted in excess emissions of SO2. A breakdown led to flaring, Tesoro said. Trade sources said the unit involved was an HCU. Alon shut down the 40K-b/d Long Beach part of the refinery due to poor economics, trade sources said. The Paramount part of the complex remains in operation, but at reduced rates. The unit is expected to be restarted during the week to Nov. 6, according to sources close to the refinery. The unit, which went down for maintenance on or around Sept. 7, originally was expected to be restarted in the week Oct. 30.

u

8-Nov-10

HCU

N.A.

N.A.

u

8-Nov-10

Outage

N.A.

040.0

u

8-Nov-10

FCCU

120.0

N.A.

p

8-Nov-10

Maintenance

N.A.

130.0

N.A.

p

8-Nov-10

FCCU

N.A.

N.A.

p

8-Nov-10

N.A.

N.A.

The No. 3 FCCU commenced a restart on Oct. 31. Emissions related to the restart could last through Nov. 7. *The refiner was wrapping up an overhaul at an FCCU and preparing to commence planned work at the FCCU's associated alkylation unit.

FCCU

p

8-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Alkylation unit

N.A.

N.A.

*The refiner was wrapping up an overhaul at an FCCU and preparing to commence planned work at the FCCU's associated alkylation unit.

p

8-Nov-10

Maintenance

N.A.

N.A.

N.A.

p

8-Nov-10

Maintenance

N.A.

N.A.

The refiner said that maintenance is occurring at conversion units. The work is resulting in lower throughput.

p

8-Nov-10

Flare

N.A.

N.A.

p

8-Nov-10

Maintenance

N.A.

N.A.

The refiner warned of planned flaring. N.A.

p

8-Nov-10

Maintenance

N.A.

N.A.

N.A.

p

8-Nov-10

Maintenance

N.A.

N.A.

p

8-Nov-10

Electrical

N.A.

400.0

u

1-Nov-10

HTU

054.0

054.0

u

1-Nov-10

Outage

N.A.

N.A.

u

1-Nov-10

SRU

N.A.

N.A.

u

1-Nov-10

FCCU

N.A.

N.A.

Planned work will be performed during 4Q 2011. A power outage forced the plant to shut down. The coker gas oil HTU, which has been shut since a deadly explosion erupted at the refiner on Sept. 7, is expected to be restarted in early 2011. Previous reports stated that the unit was restarted later Sept. An equipment failure was related to scheduled maintenance that commenced earlier. The glitch led to the release of NOX to the flare stack. An SRU process frame tripped. *Power was lost during a thunderstorm, which triggered malfunctions at an FCCU and an alkylation unit.

u

1-Nov-10

Alkylation unit

N.A.

N.A.

*Power was lost during a thunderstorm, which triggered malfunctions at an FCCU and an alkylation unit.

u

1-Nov-10

Outage

N.A.

N.A.

Instrumentation issues caused intermittent flaring.

u

1-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

A power outage led to equipment shutdowns and flaring. A unit upset was followed by the release of SO2 and SO3.

u

1-Nov-10

Outage

N.A.

N.A.

u

1-Nov-10

Electrical

N.A.

N.A.

A transformer failed on the afternoon of Oct. 26, cutting power to the undermaintenance plant. Electricity was restored the next day, and the plant was gradually powered up over the following days. The outage was expected to extend planned maintenance, delaying the restart of a CDU by about one month to late Nov. As of Oct. 29, the FCCU is still offline as the refiner assesses any damage that might have been caused by the power outage.

u

1-Nov-10

Electrical

N.A.

N.A.

u

1-Nov-10

Depropanizer

N.A.

N.A.

u

1-Nov-10

Outage

N.A.

N.A.

u

1-Nov-10

Electrical

N.A.

N.A.

A power outage caused flaring. A leak at a depropanizer cooler in a catalytic reformer did not impact production; the leak was quickly repaired. Emissions from the repairs are expected to continue for several days. Flaring was reported on Oct. 27; the plant was still recovering from a loss of hydrogen and steam on Oct. 22. A power blip led to flaring.

u

1-Nov-10

Outage

N.A.

N.A.

u

1-Nov-10

Outage

N.A.

N.A.

u

1-Nov-10

Hydroconversion unit

N.A.

N.A.

An instrument failure led to flaring. An unspecified equipment failure led to acid gas flaring. A raffinate hydroconversion unit was taken offline to fix a leak. The shutdown of the unit resulted in flaring.

u

1-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

A unit malfunction was accompanied by evacuation alarms, but the incident was quickly brought under control and production was not impacted. An equipment malfunction resulted in excess emissions.

u

1-Nov-10

Outage

N.A.

N.A.

u

1-Nov-10

Maintenance

N.A.

N.A.

N.A.

p

1-Nov-10

HCU

N.A.

N.A.

N.A.

p

1-Nov-10

Maintenance

N.A.

N.A.

N.A.

p

1-Nov-10

CDU

N.A.

N.A.

N.A.

p

1-Nov-10

CDU

N.A.

N.A.

p

1-Nov-10

FCCU

110.0

N.A.

Planned work on a CDU compressor was not expected to impact production. N.A.

p

1-Nov-10

CDU

N.A.

N.A.

N.A.

p

1-Nov-10

Coker

N.A.

N.A.

N.A.

p

1-Nov-10

Maintenance

N.A.

140.0

p

1-Nov-10

HCU

030.0

N.A.

The plant will be closed for 36 days of work. N.A.

p

1-Nov-10

Gofiner

N.A.

N.A.

p

25-Oct-10

CDU

120.0

120.0

u

25-Oct-10

CDU Reformer

N.A. 036.0

N.A. N.A.

p u

25-Oct-10 25-Oct-10

DSU

065.0

N.A.

Planned work on several Gofiners is expected to last for several months. The unti was shut due to weak demand. N.A. *A reformer and a naphtha desulfurizer were closed due to a gas leak in the desulfurizer. *A reformer and a naphtha desulfurizer were closed due to a gas leak in the desulfurizer.

u

25-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Maintenance

N.A.

152.0

The refinery commenced a one-month closure, prompted by sluggish domestic demand. Maintenance will be performed during the economic closure.

u

25-Oct-10

Coker

025.0

067.0

u

25-Oct-10

Gas oil HDS

025.0

067.0

u

25-Oct-10

Naphtha HDS

017.0

067.0

u

25-Oct-10

Coker

160.0

N.A.

p

25-Oct-10

Maintenance

N.A.

N.A.

p

25-Oct-10

Maintenance

N.A.

N.A.

*The unit was restarted, along with several others, following inspections that commenced in Aug. *The unit was restarted, along with several others, following inspections that commenced in Aug. *The unit was restarted, along with several others, following inspections that commenced in Aug. The coker will be offline for about 15 days of routine maintenance from late Oct. Major maintenance will be performed in Feb. 2011. Unspecified units will be closed from March-April 2011 for planned maintenance.

p

25-Oct-10

Maintenance

N.A.

N.A.

The plant will be closed for around six weeks of inspections and maintenance from the end of Aug. 2011, according to sources close to the refinery.

p

25-Oct-10

Maintenance

N.A.

264.0

p

25-Oct-10

Fire

N.A.

N.A.

The refinery will be closed for maintenance sometime during 4Q 2011, according to industry sources. N.A.

u

25-Oct-10

Outage

N.A.

N.A.

An unspecified unit was shut down after an equipment malfunction led to the release of materials to the flare. The unit will require repairs.

u

25-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Butamer unit

N.A.

N.A.

A leak at the butamer unit in complex 6 of the west plant was reported on Oct. 19 and fixed by Oct. 20. The incident and repair work was expected to have resulted in the release of butane, propane, VOGs, isobutene, CO, and NOX. A compressor tripped offline, triggering flaring. Production was not impacted. Flaring was reported, due to a compressor trip at Booster Station 4. An equipment failure resulted in flaring. Also, a CDU (dubbed Pipestill 3) was undergoing a turnaround. Throughput at the unit has been reduced while work is performed on a booster station.

p

25-Oct-10

Compressor

N.A.

N.A.

u

25-Oct-10

Compressor

N.A.

N.A.

u

25-Oct-10

Flare

N.A.

N.A.

u

25-Oct-10

CDU

N.A.

N.A.

u

25-Oct-10

Alkylation unit

N.A.

N.A.

p

25-Oct-10

N.A.

Work is expected to commence in Nov. on an alkylation unit. N.A.

Maintenance

N.A.

p

25-Oct-10

Coker

N.A.

N.A.

N.A.

p

25-Oct-10

FCCU

N.A.

N.A.

N.A.

p

25-Oct-10

TGTU

N.A.

N.A.

Tail gas treating unit 2 was shut for several hours for maintenance to remove sulfur from the distribution manifold.

p

25-Oct-10

Sulfur plant

N.A.

N.A.

N.A.

p

25-Oct-10

RHTU

N.A.

N.A.

A residual hydrotreater resumed normal operations on Oct. 22. The unit had been down for maintenance.

p

25-Oct-10

Flare

N.A.

N.A.

The refiner warned of planned flaring.

p

25-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

An unplanned overhaul at an FCCU was extended by at least one week, trade sources noted. Tesoro originally said the unit was taken offline on Sept. 30 for around one week of work. Flaring was reported amid repairs to the flare system. A diesel HTU was knocked offline by a compressor fire on Oct. 5; repairs to the damaged HTU began on Oct. 7. The incident at the compressor led to the release of SO2 and NOX. A fire at a sludge tank injured one worker. The blaze erupted while maintenance was being performed on the tank; production was not impacted.

u

18-Oct-10

Flare

N.A.

N.A.

u

18-Oct-10

HTU

N.A.

N.A.

u

18-Oct-10

Tank

N.A.

N.A.

u

18-Oct-10

Pipeline

N.A.

N.A.

A hydrogen sulfide leak from a pipe was repaired; the leak was said to have affected production. A worker collapsed and died while in the process of repairing the leak on Oct. 6, but it has yet to be determined if the death was related to the leaking gas. Operations were back to normal as of Oct. 14.

u

18-Oct-10

FCCU

145.0

N.A.

The 145K-b/d FCCU is anticipated to reach normal rates by the weekend of Oct. 16-17, after being closed on Oct. 6 by a weather-related power outage, and then later restarted on Oct. 8.

u

18-Oct-10

Compressor

N.A.

N.A.

Flaring occurred when a wet gas compressor tripped offline at a heavy oil cracker at the west plant. The unit was quickly returned to service, and production was not affected.

p

18-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

SRU

N.A.

N.A.

SCOT

N.A.

N.A.

SRU

N.A.

N.A.

Compressor

N.A.

N.A.

Outage

N.A.

N.A.

Outage

N.A.

N.A.

FCCU

N.A.

N.A.

SRU

N.A.

N.A.

Maintenance

N.A.

N.A.

Flare

N.A.

N.A.

Flare

N.A.

N.A.

Boiler

N.A.

N.A.

*Sinclair cut feed to the sulfur units and restarted the SCOT unit. The refiner stated in a regulatory filing, "Hydrocarbon carryover to the No. 3 and No. 4 SRUs caused the TTO on No. 3 to shut down, and the SCOT and TTO on No. 4 to shut down." *Sinclair cut feed to the sulfur units and restarted the SCOT unit. The refiner stated in a regulatory filing, "Hydrocarbon carryover to the No. 3 and No. 4 SRUs caused the TTO on No. 3 to shut down, and the SCOT and TTO on No. 4 to shut down." A glitch occurred at the No. 1 SRU; the upset did not impact production. Flaring was reported, due to the loss of a compressor. Operations were curbed to reduce the flaring. An unspecified equipment failure occurred after H2S was released.

u

18-Oct-10

u

18-Oct-10

u

18-Oct-10

p

18-Oct-10

u

18-Oct-10

An unspecified unit was shut down, due to a jet fuel leak on a pipeline. The FCCU suffered a glitch. Workers stabilized the unit shortly thereafter. An SRU was closed, which caused SO2 flaring.

u

18-Oct-10

u

18-Oct-10

p

18-Oct-10

Maintenance on unspecified units was scheduled. The refiner warned of planned flaring. The refiner warned of planned flaring. A boiler was replaced at the refinery over the weekend of Oct. 16-17 as part of routine maintenance.

p

18-Oct-10

p

18-Oct-10

p

18-Oct-10

p

18-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

N.A.

110.0

p

11-Oct-10

N.A.

The plant was closed down from Aug. to carry out a refurbishment at a CDU. N.A.

FCCU

035.5

u

11-Oct-10

FCCU

041.0

N.A.

N.A.

u

11-Oct-10

FCCU

024.0

N.A.

N.A.

u

11-Oct-10

CDU

150.0

150.0

N.A.

p

11-Oct-10

CDU

140.0

140.0

N.A.

p

11-Oct-10

Outage

N.A.

N.A.

An emergency shutdown of a unit was performed. The incident caused flaring, which resulted in a small grass fire.

u

11-Oct-10

Compressor

N.A.

N.A.

u

11-Oct-10

SRU

N.A.

N.A.

A gas compressor was shut to repair a leak in a hydrogen quench line supplying reactor No. 4. N.A.

u

11-Oct-10

Coker

N.A.

N.A.

u

11-Oct-10

Outage

N.A.

N.A.

u

11-Oct-10

Hydrogen unit

N.A.

N.A.

u

11-Oct-10

Electrical

N.A.

N.A.

u

11-Oct-10

Compressor

N.A.

N.A.

u

11-Oct-10

Ultraformer

N.A.

N.A.

p

11-Oct-10

Maintenance

N.A.

121.0

The unit malfunctioned, triggering flaring. A process unit upset resulted in the release of H2S and SO2. Flaring and a release of SO2 occurred due to the shutdown of a third-party hydrogen plant. A power outage caused flaring. A glitch with a coupling at a reformer hydrogen compressor impacted production. Ultraformer No. 3 was restarted, following a maintenance closure. The restart process was slated to last three days. A four-week maintenance closure commenced on or around Oct. 4.

p

11-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

180.0

180.0

u

11-Oct-10

N.A.

The last of the plant's three 180K-b/d CDUs was restarted after an oil leak sparked a fire at a residual desulfurization unit. N.A.

FCCU

024.0

u

11-Oct-10

CDU

100.0

100.0

N.A.

p

11-Oct-10

RDSU

030.0

N.A.

N.A.

p

11-Oct-10

CDU

100.0

100.0

N.A.

p

11-Oct-10

Coker

036.7

N.A.

N.A.

p

11-Oct-10

FCCU

023.3

N.A.

p

11-Oct-10

FCCU

021.5

N.A.

p

11-Oct-10

Electrical

N.A.

119.0

The unit will be closed for more than 40 days of planned work. One of the two 21.5K-b/d FCCUs will be closed for scheduled work. The refinery suffered a power failure and saw complications during a restart attempt.

p

11-Oct-10

Maintenance

N.A.

N.A.

p

11-Oct-10

Maintenance

N.A.

N.A.

Shell said on Oct. 15 that it has postponed maintenance on a hydrocracker to spring 2011; the work had been scheduled to take place in 4Q 2010. Units at the plant that were shut in Sept. will be restarted by the end of Oct., to boost fuel output in response to strikes over pension reforms in France, which have crippled the country's refining industry.

p

11-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

013.0

N.A.

The No. 1 CDU, which was damaged in a pipe explosion, commenced a restart on Feb. 17. After the CDU reaches planned rates, the refiner will restart, one by one, the VDU, the SRU, and the reformer. The distillate dewaxing unit, where the explosion occurred, is expected to be restarted following the recent conclusion of an investigation into the incident, Silver Eagle said on Sept. 27.

u

4-Oct-10

Maintenance

N.A.

024.0

p

4-Oct-10

CDU

080.0

080.0

The plant will be shut for 45 days of annual maintenance. Stocks are said to be adequate to cover requirements. N.A.

p

4-Oct-10

Maintenance

N.A.

160.0

The refiner plans to carry out a major, 45-day turnaround in March and April 2011. The work is performed once every four years.

p

4-Oct-10

HCU

N.A.

N.A.

u

4-Oct-10

Flare

N.A.

N.A.

u

4-Oct-10

HTU

N.A.

N.A.

u

4-Oct-10

Compressor

N.A.

N.A.

u

4-Oct-10

Compressor

N.A.

N.A.

u

4-Oct-10

Fire

N.A.

N.A.

The unit was hit by a fire; the fire was quickly extinguished, and no other units were impacted. Emissions occurred due to a heavy thunderstorm. A diesel hydrotreater unit was shut, due to an upset that resulted in the release of a diesel mist into the atmosphere. A compressor malfunction occurred in Complex 7 of the refinery, causing flaring. A wet gas compressor tripped in the delayed coker, but it did not impact production. A small fire was extinguished at the plant; the incident did not impact operations.

u

4-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Flare

N.A.

N.A.

Electrical

N.A.

N.A.

FCCU

N.A.

N.A.

Pipeline

N.A.

N.A.

FCCU

N.A.

N.A.

CDU

N.A.

N.A.

Flare

N.A.

N.A.

CDU Rheniformer FCCU Sulfur plant FCCU

N.A. N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A. N.A.

CDU

N.A.

N.A.

Production was not affected by unplanned flaring. The flaring occurred due to surplus pressure on the plant's vapor recovery system. An overnight power outage was due to a transformer failure in a substation. Operations were returned to normal the next day. Flaring beyond permitted levels was reported from the FCCU in the east plant. A crude leak from a pipeline within the refinery was contained. The leak occurred when a piece of equipment struck the line. A malfunctioning FCCU was returned to operation on the afternoon of Sept. 30. The unit is expected to operate at a reduced rate for around two weeks while repairs are completed, the refiner said. Brief maintenance was to be carried out at the No. 1 FCCU. The refiner warned of planned flaring amid maintenance, which has been ongoing since early Sept. N.A. N.A. N.A. N.A. An FCCU was taken offline for around one week of work.

u

4-Oct-10

u

4-Oct-10

u

4-Oct-10

u

4-Oct-10

u

4-Oct-10

p

4-Oct-10

p

4-Oct-10

p p p p p

4-Oct-10 4-Oct-10 4-Oct-10 4-Oct-10 4-Oct-10

*The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported.

u

4-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

HTU

N.A.

N.A.

Hydrobon

N.A.

N.A.

Sulfolane

N.A.

N.A.

DIH

N.A.

N.A.

*The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported.

u

4-Oct-10

u

4-Oct-10

u

4-Oct-10

u

4-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Description of labels Shutdown Region** date

Date of World region shutdown

Restart date

Date of restart

Refiner

City

State

Operator of the refinery at which the shutdown Location of Location of took place refinery refinery

Country

Location of refinery

Refinery capacity

Unit

The type of problem The capacity encountered or of refinery in the unit at which barrels per the problem was day encountered

When a filter is in place, the dropdown arrows and the numbers appear in blue. To unfilter the results, click on the drop-down menu, scroll to the top, and select the (All) option. This will un-filter the column.

Please note: All shutdown and restart dates are considered approximate. Shutdown and restart information is primarily derived from Reuters, Platts, and Bloomsberg newswire services. Refinery and unit capacity figures may be derived from primary source material (stated above) or from Oil and Gas Journal 's a Some capacities for "Unit size" and "Production impact" are not available or not applicable and are therefore designated "N.A."

Unit size, K b/d

The size of the unit affected in thousand barrels per day

Production impact, K b/d

Details

The capacity impact of the shutdown in Further details thousand barrels about the per day shutdown

Planned/unplanned

Whether the shutdown was planned, symbolized by (p), or unplanned, symbolized by (u).

swire services. r from Oil and Gas Journal 's annual Worldwide Refining Survey. re therefore designated "N.A."

If you see no entries after you have applied a filter, scroll to the top.

ies after you e applied a r, scroll to the