Date of last update: December 27, 2010 To start a new search, be certain to un-filter your results by pointing to Filter
Views 88 Downloads 6 File size 821KB
Date of last update: December 27, 2010 To start a new search, be certain to un-filter your results by pointing to Filter on the Data menu, and then click Show All. The drop-down buttons will appea In the "Shutdown date" and "Restart date" columns, "*-" indicates an unknown month, day, or year. See "Key" sheet for additional notes. *For refineries that have multiple unit shutdowns, an entry was created for each unit. **Regions: (1) United States, (2) Canada, (3) Latin America & Caribbean, (4) Western Europe, (5) Eastern Europe, (6) Middle East, (7) Africa, (8) Asia-Pac Shutdown date Restart date Region** M D Y M D Y Refiner City State or Country Refinery Refinery process province capacity, K b/d 1 01 01 11 **- 11 Citgo Lake LA US 440 Fluid Catalytic Cracking Petroleum Charles
1
11
25
10
12
25
10 Holly
1
09
25
10
12
20
1
09
25
10
12
3
03
01
10
3
03
01
10
Tulsa
OK
US
125
Fluid Catalytic Cracking
10 ExxonMobi Beaumon l t
TX
US
345
Hydrocracking
20
10 ExxonMobi Beaumon l t
TX
US
345
Catalytic Reforming
12
23
10 PDVSA
Refineria Isla Curazao
Netherlan ds Antilles
320
Crude Distillation
12
23
10 PDVSA
Refineria Isla Curazao
Netherlan ds Antilles
320
Fluid Catalytic Cracking
Hydrocarbon Publishing Co. Copyright protected. 2008
71
3
03
01
10
12
23
10 PDVSA
8
01
*-
11
02
*-
8
12
07
10
12
20
1
12
04
10
12
18
8
12
07
10
12
18
8
12
07
10
12
1
12
07
10
02
Refineria Isla Curazao
Netherlan ds Antilles
320
Crude Distillation
11 Reliance Jamnagar Industries
India
660
Fluid Catalytic Cracking
10 Kashima Kashima Oil 10 Chalmette Chalmett Refining e
Japan
210
Fluid Catalytic Cracking
US
193
General outage, turnaround, or closure
10 Cosmo Oil Yokkaichi
Japan
147
Crude Distillation
18
10 Cosmo Oil Yokkaichi
Japan
147
Crude Distillation
*-
11 Valero Energy
US
140
Fluid Catalytic Cracking
Benicia
LA
CA
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
12
17
10
12
19
10 Valero Energy
8
12
20
11
*-
*-
8
12
24
10
12
8
01
*-
11
7
12
19
7
12
7
Port Arthur
TX
US
250
Sulfur Plant
*- SK Energy Ulsan
South Korea
817
Hydrotreating
28
10 Cosmo Oil Yokkaichi
Japan
147
Fluid Catalytic Cracking
02
*-
11 Reliance Jamnagar Industries
India
660
Hydrotreating
10
*-
*-
*- Naftec
Algeria
060
General outage, turnaround, or closure
22
10
*-
*-
*- Nigerian Kaduna National Petroleum
Nigeria
110
General Equipment
12
22
10
*-
*-
*- Nigerian Port National Harcourt Petroleum
Nigeria
150
General Equipment
1
12
18
10
12
19
10 BP
WA
US
222
General outage, turnaround, or closure
1
12
20
10
12
20
10 ConocoPhi Wood llips River
IL
US
306
Fluid Catalytic Cracking
Arzew
Ferndale
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
12
20
10
12
20
10 Motiva Convent Enterprise s
LA
US
227
General outage, turnaround, or closure
1
12
20
10
12
20
10 ExxonMobi Torrance l
CA
US
150
Fluid Catalytic Cracking
1
12
20
10
12
20
10 ExxonMobi Torrance l
CA
US
150
Alkylation
1
12
23
10
12
*-
10 ExxonMobi Joliet l
IL
US
238
General outage, turnaround, or closure
1
12
23
10
12
23
10 Alon USA Big Energy Spring
TX
US
070
General Equipment
1
12
23
10
12
23
10 San Joaquin Refining
Bakersfiel d
CA
US
015
General outage, turnaround, or closure
1
12
23
10
12
23
10 US Oil & Refining
Tacoma
WA
US
039
General outage, turnaround, or closure
2
*-
*-
10
12
23
10 Imperial Oil
Sarnia
ON
Canada
121
General Equipment
1
12
22
10
12
24
10 Valero Energy
Corpus Christi
TX
US
205
Hydrocracking
1
03
*-
11
*-
*-
11 Marathon Oil
Robinson
IL
US
204
General outage, turnaround, or closure
Hydrocarbon Publishing Co. Copyright protected. 2008
71
8
12
10
10
12
15
10 JX Holdings
Negishi
Japan
340
Crude Distillation
8
11
17
10
12
25
8
11
17
10
12
25
8
05
25
11
06
*-
10 Bharat Mumbai Petroleum 10 Bharat Mumbai Petroleum 11 S-Oil Onsan
India
240
Crude Distillation
India
240
Fluid Catalytic Cracking
South Korea South Korea Oman
520
Crude Distillation
8
09
*-
11
10
*-
11 GS Caltex Yosu
680
Crude Distillation
6
10
30
10
12
18
10 Oman Refinery
116
General outage, turnaround, or closure
5
12
03
10
12
17
10 Ceska Litvinov Rafinerska
Czech Republic
101
Hydrocracking
4
12
13
10
12
27
10 Petroplus Ingolstadt
Germany
110
12
22
10 Tamoil
Italy
094
H2 Production/Purification/Rec overy General outage, turnaround, or closure
4
12
16
10
6
10
25
10
12
14
10 Oil Haifa Refineries Ltd.
Israel
130
Catalytic Reforming
6
10
25
10
12
14
10 Oil Haifa Refineries Ltd.
Israel
130
H2 Production/Purification/Rec overy
4
01
13
11
02
17
France
119
*-
*-
11
*-
*-
11 ExxonMobi Fos-surl Mer 11 ERG Priolo
Italy
225
General outage, turnaround, or closure General outage, turnaround, or closure
4
Sohar
Cremona
Sicily
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
12
09
10
12
11
10 Tesoro
1
12
10
10
12
10
1
12
11
10
12
1
12
14
10
1
12
14
1
12
1
Martinez
CA
US
161
General outage, turnaround, or closure
CA
US
139
11
10 ConocoPhi Wilmingt llips on 10 Frontier Oil El Dorado
KS
US
135
12
14
10 Sunoco
PA
US
175
General outage, turnaround, or closure General outage, turnaround, or closure General Equipment
10
12
14
10 Valero Energy
TN
US
180
General outage, turnaround, or closure
15
10
12
15
10 Citgo Lake Petroleum Charles
LA
US
440
General outage, turnaround, or closure
12
15
10
12
15
10 Flint Hills Corpus Resources Christi
TX
US
279
General outage, turnaround, or closure
1
12
15
10
12
15
10 LyondellB Houston asell
TX
US
268
General outage, turnaround, or closure
1
12
08
10
12
14
10 Valero Energy
TX
US
090
Fluid Catalytic Cracking
1
12
10
10
12
14
10 Alon USA Big Energy Spring
TX
US
070
Utilities Production
1
12
14
10
12
16
10 Valero Energy
Corpus Christi
TX
US
205
Hydrocracking
1
12
15
10
01
05
11 BP
Carson
CA
US
252
3
*-
*-
11
*-
*-
8
03
*-
11
03
*-
11 ExxonMobi Acajutla l 11 Sinopec Jinling
General outage, turnaround, or closure General outage, turnaround, or closure Crude Distillation
Marcus Hook Memphis
Houston
El Salvador Jiangsu China
022 270
Hydrocarbon Publishing Co. Copyright protected. 2008
71
8
03
*-
11
03
*-
11 Sinopec
Jinling
Jiangsu China
270
Coking
4
01
*-
11
*-
*-
*- Motor Oil Hellas
Aghii Theodori
Corinth Greece
110
Crude Distillation
1
11
29
10
12
07
10 Valero Energy
Memphis
US
180
Fluid Catalytic Cracking
3
12
02
10
12
07
10 PDVSA
Cardon
Venezuel a
940
General outage, turnaround, or closure
1
12
04
10
12
04
10 Chevron
Pascagou la
MS
US
330
General Equipment
1
12
04
10
12
04
10 ExxonMobi Beaumon l t
TX
US
345
General outage, turnaround, or closure
1
12
05
10
12
07
IL
US
159
1
12
08
10
12
08
10 Citgo Lemont Petroleum 10 Citgo Lemont Petroleum
IL
US
159
General outage, turnaround, or closure Hydrotreating
1
12
05
10
12
05
TX
US
247
General Equipment
1
12
09
10
12
09
TX
US
247
1
12
05
10
12
05
10 ConocoPhi Sweeny llips 10 ConocoPhi Sweeny llips 10 LyondellB Houston asell
TX
US
268
General outage, turnaround, or closure General Equipment
TN
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
12
06
10
12
06
10 Tesoro
Anacorte s
WA
US
113
General outage, turnaround, or closure
1
12
07
10
12
07
10 Chevron
El Segundo
CA
US
269
General outage, turnaround, or closure
1
12
08
10
12
08
10 Valero Energy
Paulsbor o
NJ
US
166
General outage, turnaround, or closure
1
12
08
10
12
08
10 ConocoPhi Westlake llips
LA
US
239
General Equipment
3
12
08
10
12
09
110
12
03
10
12
03
Esmerald as Norco
Ecuador
1
LA
US
220
General outage, turnaround, or closure Sulfur plant
1
12
07
10
12
07
10 Petroecua dor 10 Motiva Enterprise s 10 Motiva Enterprise s
Norco
LA
US
220
General Equipment
1 1
09 12
17 05
10 10
12 12
06 08
10 BP 10 Tesoro
IN CA
US US
385 100
1
*-
*-
*-
12
08
10 BP
Whiting Wilmingt on Texas City
TX
US
451
Fluid Catalytic Cracking General outage, turnaround, or closure Hydrocracking
1
*-
*-
*-
12
08
10 BP
Texas City
TX
US
451
Hydrotreating
8
11
*-
10
11
30
10 Cosmo Oil Yokkaichi
Japan
147
Crude Distillation
8
02
25
11
*-
*-
*- Sinopec
Guangzh Guangdo China ou ng
210
Crude Distillation
Hydrocarbon Publishing Co. Copyright protected. 2008
71
4
11
10
10
12
01
10 AB Nynas Dundee Petroleum
4
11
29
10
11
29
10 IES
Mantova
4
11
30
10
11
30
6
02
*-
11
03
*-
6
04
25
11
05
31
10 AB Nynas Petroleum 11 Saudi Aramco Shell Refinery 11 Saudi Aramco
1
11
23
10
11
30
10 ConocoPhi Belle llips Chasse
1
11
23
10
11
30
10 ConocoPhi Belle llips Chasse
Scotland UK
012
General outage, turnaround, or closure
Italy
069
General Equipment
Nynasha mn Al-Jubail
Sweden
028
Saudi Arabia
290
General outage, turnaround, or closure Crude Distillation
Rabigh
Saudi Arabia
400
General outage, turnaround, or closure
LA
US
247
Fluid Catalytic Cracking
LA
US
247
Alkylation
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
24
10
11
30
10 ExxonMobi Torrance l
CA
US
150
General outage, turnaround, or closure
2
11
26
10
11
26
AB
Canada
187
1
11
27
10
11
27
10 Imperial Oil 10 Coffeyville Resources
KS
US
114
General outage, turnaround, or closure Sulfur Plant
1
11
27
10
11
27
LA
US
220
General outage, turnaround, or closure
1
11
28
10
11
28
OK
US
125
1
11
28
10
11
28
1
11
29
10
11
29
1
11
29
10
11
29
1
11
29
10
12
1
11
30
10
1
11
30
1
12
1
1
Edmonto n Coffeyvill e
10 Motiva Norco Enterprise s 10 Holly Tulsa 10 ConocoPhi llips 10 LyondellB asell 10 Valero Energy
Sweeny
TX
US
247
General outage, turnaround, or closure Fluid Catalytic Cracking
Houston
TX
US
268
Fluid Catalytic Cracking
Corpus Christi
TX
US
205
Isomerization
02
10 PDVSA
Amuay
Venezuel a
640
General outage, turnaround, or closure
11
30
10 Chevron
10
11
30
01
10
12
01
12
01
10
12
12
01
10
12
Pascagou la 10 ExxonMobi Beaumon l t 10 ExxonMobi Baton l Rouge
MS
US
330
Fluid Catalytic Cracking
TX
US
345
General Equipment
LA
US
505
General outage, turnaround, or closure
01
10 Flint Hills Corpus Resources Christi
TX
US
279
General Equipment
01
10 BP
CA
US
252
H2 Production/Purification/Rec overy
Carson
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
12
01
10
12
01
10 Valero Energy 10 PDVSA
Benicia
3
12
02
10
12
02
1
12
02
10
12
02
10 ExxonMobi Joliet l
3
10
*-
10
12
01
10 Pemex
Salina Cruz
1 1
10 11
25 26
10 10
11 *-
27 *-
1
11
29
10
11
29
10 BP *- ExxonMobi l 10 Alon USA Energy
Carson Beaumon t Big Spring
1
11
30
10
11
30
1
11
30
10
11
1
12
01
10
1
12
01
2 1
12 12
1 1 8
8
CA
US
140
Fluid Catalytic Cracking
Venezuel a
127
General outage, turnaround, or closure
US
238
Utilities Production
Mexico
330
General outage, turnaround, or closure
CA TX
US US
252 345
TX
US
070
Catalytic Reforming General outage, turnaround, or closure General outage, turnaround, or closure
10 Alon USA Big Energy Spring
TX
US
070
General Equipment
30
10 Shell Chemical
Saraland
AL
US
085
General outage, turnaround, or closure
12
01
TX
US
205
10
12
03
10 Valero Corpus Energy Christi 10 ExxonMobi Torrance l
CA
US
150
General outage, turnaround, or closure General outage, turnaround, or closure
01 05
10 10
12 12
04 07
10 Irving Oil 10 Tesoro
St. John Wilmingt on
NB CA
Canada US
250 100
Fluid Catalytic Cracking General outage, turnaround, or closure
02 04 10
*20 22
11 11 10
03 05 11
*20 20
10 Shell Oil 10 Shell Oil 10 Idemitsu Kosan
Martinez Martinez Chita
CA CA Aichi
US US Japan
145 145 152
Hydrotreating Hydrocracking Crude Distillation
11
15
10
11
20
10 Idemitsu Kosan
Tomakom Hokkaido Japan ai
133
Crude Distillation
El Palito
IL
Hydrocarbon Publishing Co. Copyright protected. 2008
71
8
11
23
10
11
23
10 Pertamina Balongan
Indonesia
125
General Equipment
8
11
26
10
12
15
10 TonenGen Kawasaki eral
Japan
296
General outage, turnaround, or closure
8
09
*-
11
*-
*-
*- Toa Oil
Kawasaki Japan
110
Crude Distillation
8
05
15
11
06
05
005
Crude Distillation
8
*-
*-
11
*-
*-
11 Tesiki Kubiki Japan Topping Plant *- Pertamina Balikpapa Kalimanta Indonesia n n
260
General outage, turnaround, or closure
8
*-
*-
13
*-
*-
*- Fuji Oil
Japan
192
Crude Distillation
7
11
15
10
*-
*-
*- Nigerian Kaduna National Petroleum
Nigeria
110
General Equipment
7
11
21
10
*-
*-
*- Nigerian Warri National Petroleum
Nigeria
125
General Equipment
4
09
*-
10
*-
*-
*- Royal Dutch Shell
Pernis, Rotterda m
Netherlan ds
406
Fluid Catalytic Cracking
1
11
10
10
11
19
10 Hess
Port Reading
NJ
US
070
Fluid Catalytic Cracking
1
11
18
10
11
19
10 BP
Carson
CA
US
252
General outage, turnaround, or closure
Keihin
Sodegaur a
Chiba
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
20
10
11
20
10 ExxonMobi Baton l Rouge
LA
US
505
General outage, turnaround, or closure
1
11
20
10
11
23
10 LyondellB Houston asell
TX
US
268
General outage, turnaround, or closure
1
11
20
10
11
21
10 Frontier Oil El Dorado
KS
US
135
1
11
23
10
11
24
IL
US
238
1
11
24
10
11
24
10 ExxonMobi Joliet l 10 ConocoPhi Wood llips River
IL
US
306
General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking
1
11
24
10
11
24
10 ExxonMobi Beaumon l t
TX
US
345
General outage, turnaround, or closure
1
11
24
10
11
24
10 Big West Oil
Salt Lake City
UT
US
030
General Equipment
1
11
26
10
11
27
Port Arthur
TX
US
174
Sulfur Plant
1
11
26
10
11
26
10 Total Petrochem icals 10 Valero Energy
Port Arthur
TX
US
250
General Equipment
1
11
26
10
11
26
10 Shell Oil
Martinez
CA
US
145
General outage, turnaround, or closure
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
26
10
11
26
10 Tesoro
Kapolei
HI
US
094
General outage, turnaround, or closure
1
11
27
10
11
27
10 ConocoPhi Borger llips
TX
US
146
General outage, turnaround, or closure
1
09
22
10
11
23
10 ConocoPhi Linden llips
NJ
US
238
General outage, turnaround, or closure
1
10
15
10
11
20
Detroit
MI
US
102
1
10
15
10
11
22
Lima
OH
US
162
General outage, turnaround, or closure Fluid Catalytic Cracking
1
10
15
10
11
22
Lima
OH
US
162
Coking
1
*-
*-
*-
11
24
10 Marathon Oil 10 Husky Energy 10 Husky Energy 10 Holly
UT
US
030
8
11
17
10
11
17
Taiwan
270
General outage, turnaround, or closure Crude Distillation
8
10
08
10
11
13
Japan
193
Crude Distillation
8
10
25
10
11
19
10 Showa Yokkaichi Shell Sekiyu 10 Reliance Jamnagar Industries
India
660
Crude Distillation
8
11
20
10
12
*-
10 Sinopec
Gaoqiao
China
230
Crude Distillation
8
11
20
10
12
*-
10 Sinopec
Gaoqiao
China
230
Coking
Woods Cross 10 CPC Corp. Kaohsiun g
Hydrocarbon Publishing Co. Copyright protected. 2008
71
8
11
20
10
12
*-
10 Sinopec
Gaoqiao
4
09
11
10
11
19
10 ExxonMobi Sarpom l
6
10
15
10
11
14
6
01
15
11
*-
5
*-
*-
11
5
*-
*-
5
*-
5
230
Hydrocracking
Trecate Italy
230
Crude Distillation
10 Abu Dhabi Ruwais National Oil
Abu Dhabi UAE
350
Vapor Recovery/Gas Plant
*-
*- Abu Dhabi Ruwais National Oil
Abu Dhabi UAE
350
Vapor Recovery/Gas Plant
*-
*-
11 MOL
Százhalo mbatta
Hungary
161
General outage, turnaround, or closure
11
*-
*-
11 MOL
Hungary
161
*-
11
*-
*-
11 Slovnaft
Százhalo mbatta Bratislava
Slovakia
115
General outage, turnaround, or closure General outage, turnaround, or closure
*-
*-
11
*-
*-
11 INA
Rijeka
Croatia
090
General outage, turnaround, or closure
5
*-
*-
11
*-
*-
*- INA
Sisak
Croatia
080
General outage, turnaround, or closure
1
11
02
10
11
18
10 Citgo Lemont Petroleum
IL
US
159
Fluid Catalytic Cracking
1
11
12
10
*-
*-
*- Sunoco
PA
US
330
Hydrotreating
Philadelp hia
China
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
12
10
11
12
10 Motiva Port Enterprise Arthur s
TX
US
285
Fluid Catalytic Cracking
1
11
13
10
11
13
10 Chevron
MS
US
330
General outage, turnaround, or closure
1
11
15
10
11
19
10 Alon USA Big Energy Spring
TX
US
070
Fluid Catalytic Cracking
1
11
15
10
11
15
10 Valero Energy
Corpus Christi
TX
US
205
General outage, turnaround, or closure
2
11
15
10
11
15
10 Imperial Oil
Sarnia
ON
Canada
121
General outage, turnaround, or closure
1
11
09
10
11
16
10 Coffeyville Coffeyvill Resources e
KS
US
114
General outage, turnaround, or closure
1
11
16
10
11
16
LA
US
227
General outage, turnaround, or closure
1
11
16
10
11
16
10 Motiva Convent Enterprise s 10 BP Texas City
TX
US
451
General Equipment
1
11
17
10
11
17
10 US Oil & Refining
Tacoma
WA
US
039
Sulfur Plant
1
11
17
10
*-
*-
*- Shell Oil
Anacorte s
WA
US
149
General outage, turnaround, or closure
1
11
18
10
11
19
10 Chevron
Richmon d
CA
US
243
Hydrotreating
1
11
04
09
11
15
10 Silver Eagle Refining
Woods Cross
UT
US
013
Crude Distillation
1
10
15
10
11
*-
10 Chevron
Richmon d
CA
US
243
Fluid Catalytic Cracking
Pascagou la
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
10
15
10
11
*-
3
10
*-
10
10
1
11
25
10
3
10
*-
8
09
6
10 Chevron
CA
*-
Richmon d 10 Petrobras Cubatao
US
243
Alkylation
Brazil
170
General outage, turnaround, or closure
12
21
10 BP
CA
US
252
General outage, turnaround, or closure
10
11
17
10 Petrobras Revap
Sao Jose Brazil dos Campos 10 Cosmo Oil Yokkaichi Japan
241
Visbreaking/Thermal Cracking
22
10
11
11
147
Crude Distillation
10
15
10
11
*-
10 Kuwait Mina AlNational Ahmadi Petroleum
466
Hydrotreating
4
*-
*-
11
*-
*-
11 Saras
Sarroch
Sardinia Italy
300
Hydrotreating
4
*-
*-
11
*-
*-
11 Saras
Sarroch
Sardinia Italy
300
Alkylation
4
*-
*-
11
*-
*-
11 Saras
Sarroch
Sardinia Italy
300
Hydrocracking
4
*-
*-
11
*-
*-
11 Saras
Sarroch
Sardinia Italy
300
Visbreaking/Thermal Cracking
4
*-
*-
11
*-
*-
11 Saras
Sarroch
Sardinia Italy
300
Crude Distillation
4
*-
*-
11
*-
*-
11 Saras
Sarroch
Sardinia Italy
300
Crude Distillation
Carson
Kuwait
Hydrocarbon Publishing Co. Copyright protected. 2008
71
4
*-
*-
11
*-
*-
11 Saras
Sarroch
300
Catalytic Reforming
1
11
05
10
11
05
10 Motiva Port Enterprise Arthur s
TX
US
285
Fluid Catalytic Cracking
1
11
06
10
11
07
1
11
06
10
11
06
10 ConocoPhi Borger llips 10 ExxonMobi Beaumon l t
TX
US
146
Fluid Catalytic Cracking
TX
US
345
General outage, turnaround, or closure
1
11
08
10
*-
*-
*- Shell Oil
CA
US
145
General outage, turnaround, or closure
1
11
09
10
11
09
10 Coffeyville Coffeyvill Resources e
KS
US
114
General outage, turnaround, or closure
1
11
10
10
11
10
10 Motiva Norco Enterprise s 10 Citgo Corpus Petroleum Christi
LA
US
220
General Equipment
1
11
10
10
11
11
TX
US
157
Aromatics Production/Recovery
1
11
10
10
11
10
10 Tesoro
Martinez
CA
US
161
General outage, turnaround, or closure
1
11
11
10
11
11
10 BP
Texas City
TX
US
451
Hydrotreating
1
11
12
10
11
12
10 ExxonMobi Joliet l
IL
US
238
General outage, turnaround, or closure
1
11
12
10
11
12
10 Valero Energy
TX
US
167
Waste Water Treatment
Martinez
McKee (Sunray)
Sardinia Italy
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
*-
*-
*-
11
12
10 Imperial Sarnia Oil 10 ExxonMobi Baytown l
ON
Canada
121
Utilities Production
1
08
*-
10
11
11
TX
US
576
Crude Distillation
1
08
*-
10
11
11
10 ExxonMobi Baytown l
TX
US
576
Hydrotreating
1
08
*-
10
11
11
10 ExxonMobi Baytown l
TX
US
576
Hydrotreating
1
08
*-
10
11
11
10 ExxonMobi Baytown l
TX
US
576
Hydrotreating
1
08
*-
10
11
11
10 ExxonMobi Baytown l
TX
US
576
Solvent Extraction and Deasphalting
2
09
29
10
11
13
10 Irving Oil
St. John
NB
Canada
250
Crude Distillation
2
09
29
10
11
13
10 Irving Oil
St. John
NB
Canada
250
Catalytic Reforming
Hydrocarbon Publishing Co. Copyright protected. 2008
71
2
09
29
10
11
13
10 Irving Oil
St. John
NB
Canada
250
Fluid Catalytic Cracking
2
09
29
10
11
13
10 Irving Oil
St. John
NB
Canada
250
Sulfur plant
1
10
01
10
11
09
10 National McPherso Cooperativ n e Refining
KS
US
083
General outage, turnaround, or closure
1
10
17
10
11
11
10 ExxonMobi Joliet l
IL
US
238
General outage, turnaround, or closure
1
11
15
10
11
26
10 BP
Carson
CA
US
252
8
10
*-
10
11
*-
10 Sinopec
Maoming Guangdo China ng
270
General outage, turnaround, or closure Crude Distillation
8
10
*-
10
11
*-
10 Sinopec
Maoming Guangdo China ng
270
Coking
8 8
11 03
03 *-
10 11
12 04
**-
240 310
Fluid Catalytic Cracking Crude Distillation
8
05
05
11
06
05
10 CNOOC Huizhou 11 Hyundai Daesan Oil 11 SK Energy Ulsan
817
Crude Distillation
8
07
15
11
08
25
11 SK Energy Ulsan
817
Crude Distillation
8
05
*-
11
*-
*-
*- S-Oil
520
Crude Distillation
8
06
15
11
07
25
11 SK Energy Inchon
270
Crude Distillation
4
11
01
10
*-
*-
*- Total
357
Visbreaking/Thermal Cracking
Onsan
Antwerp
China South Korea South Korea South Korea South Korea South Korea Belgium
Hydrocarbon Publishing Co. Copyright protected. 2008
71
4
11
04
10
11
20
10 Total
Vlissinge n
Netherlan ds
147
Hydrocracking
4 1
11 04
04 02
10 10
11 10
19 04
10 Total 10 Shell Oil
Donges Anacorte s
France US
230 149
Fluid Catalytic Cracking General outage, turnaround, or closure
3
10
05
10
10
29
10 PDVSA
Amuay
Venezuel a
640
Fluid Catalytic Cracking
1
10
27
10
11
02
10 ConocoPhi Rodeo llips
CA
US
120
General outage, turnaround, or closure
1
10
26
10
*-
*-
*- ConocoPhi Linden llips
NJ
US
238
General outage, turnaround, or closure
1
11
02
10
11
02
10 ConocoPhi Linden llips
NJ
US
238
Utilities Production
2
10
28
10
11
01
10 Shell Canada
Sarnia
ON
Canada
071
General outage, turnaround, or closure
1
10
30
10
10
30
10 Valero Energy
Three Rivers
TX
US
096
Hydrotreating
1
11
01
10
11
01
10 Murphy Oil Superior
WI
US
033
General outage, turnaround, or closure
1
11
01
10
11
01
11 Valero Energy
CA
US
080
General Equipment
Wilmingt on
WA
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
02
10
11
02
10 ExxonMobi Baytown l
TX
US
576
Fluid Catalytic Cracking
1
11
03
10
11
03
US
306
General Equipment
11
03
10
11
03
Wood River Norco
IL
1
LA
US
220
General Equipment
1
11
03
10
11
03
10 ConocoPhi llips 10 Motiva Enterprise s 10 ConocoPhi llips
Borger
TX
US
146
Fluid Catalytic Cracking
1
11
02
11
11
03
11 Delek Refining
Tyler
TX
US
060
Sulfur Plant
1
11
04
10
11
04
10 Tesoro
Wilmingt on
CA
US
100
Hydrocracking
1
11
04
10
*-
*-
*- Alon USA Paramou Energy nt
CA
US
088
General outage, turnaround, or closure
1
09
07
10
11
06
10 ConocoPhi Belle llips Chasse
LA
US
247
Fluid Catalytic Cracking
1
10
04
10
11
01
10 Suncor
QB
Canada
130
1
*-
*-
*-
10
31
10 Motiva Port Enterprise Arthur s
TX
US
285
General outage, turnaround, or closure Fluid Catalytic Cracking
1
*-
*-
*-
10
31
10 ConocoPhi Wilmingt llips on
CA
US
139
Fluid Catalytic Cracking
Montréal
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
01
10
11
15
10 ConocoPhi Wilmingt llips on
CA
US
139
Alkylation
2
11
02
10
*-
*-
Scotford
AB
Canada
100
1
11
05
10
*-
*-
*- Shell Canada *- Tesoro
Martinez
CA
US
161
General outage, turnaround, or closure General outage, turnaround, or closure
1
11
05
10
11
12
10 BP
Carson
CA
US
252
1
11
30
10
12
*-
10 Holly
Tulsa
OK
US
125
1
01
15
11
*-
*-
El Paso
TX
US
125
1
*-
*-
11
*-
*-
Gallup
NM
US
023
6
10
23
10
10
25
09
07
10
*-
*-
Saudi Arabia Mexico
400
3
*- Western Refining *- Western Refining 10 Saudi Aramco 11 Pemex
1
10
22
10
10
22
10 ExxonMobi Joliet l
IL
US
238
General outage, turnaround, or closure
1
10
24
10
10
24
10 BP
Whiting
IN
US
385
Sulfur Plant
1
10
24
10
10
24
10 Delek Refining
Tyler
TX
US
060
Fluid Catalytic Cracking
1
10
24
10
10
24
10 Delek Refining
Tyler
TX
US
060
Alkylation
1
10
25
10
10
25
10 Citgo Lemont Petroleum
IL
US
159
General outage, turnaround, or closure
Rabigh Cadereyt a
275
Hydrocarbon Publishing Co. Copyright protected. 2008
General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Hydrotreating
71
1
10
27
10
10
27
10 Citgo Lemont Petroleum
IL
US
159
General outage, turnaround, or closure
1
10
25
10
10
25
10 ConocoPhi Westlake llips
LA
US
239
General outage, turnaround, or closure
1
10
26
10
10
27
10 ConocoPhi Linden llips
NJ
US
238
General outage, turnaround, or closure
1
10
26
10
10
26
LA
US
083
1
10
26
10
11
02
10 Alon USA Energy 10 Valero Energy
TX
US
250
General outage, turnaround, or closure Isomerization
1
10
22
10
10
27
10 ConocoPhi Rodeo llips
CA
US
120
General outage, turnaround, or closure
1
10
28
10
10
28
IL
US
306
1
10
28
10
10
28
1
10
28
10
10
28
1
10
28
10
10
28
10 ConocoPhi llips 10 ExxonMobi l 10 Husky Energy 10 ExxonMobi l
General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Hydrocracking
Krotz Springs Port Arthur
Wood River Baton Rouge Lima
LA
US
505
OH
US
162
Baytown
TX
US
576
Hydrocarbon Publishing Co. Copyright protected. 2008
71
2
10
28
10
10
28
10 Shell Canada
1
10
29
10
10
29
2
09
11
10
10
1
10
04
10
1
10
12
1
10
1
Scotford
AB
Canada
100
General outage, turnaround, or closure
10 Coffeyville Coffeyvill Resources e
KS
US
114
General outage, turnaround, or closure
27
10 Suncor
ON
Canada
085
10
29
10 Flint Hills Corpus Resources Christi
TX
US
279
General outage, turnaround, or closure Hydrocracking
10
10
23
10 Suncor
AB
Canada
135
16
10
10
23
IL
US
204
General outage, turnaround, or closure Crude Distillation
10
27
10
10
27
10 Marathon Oil 10 Valero Energy
Edmonto n Robinson Corpus Christi
TX
US
205
Crude Distillation
1
01
*-
11
*-
*-
Houston
TX
US
268
Fluid Catalytic Cracking
1
01
*-
11
*-
*-
US
250
Crude Distillation
01
*-
11
*-
*-
TX
US
250
Coking
1
01
*-
11
02
*-
Port Arthur Port Arthur Benicia
TX
1
CA
US
140
1
03
*-
11
*-
*-
TX
US
167
General outage, turnaround, or closure Hydrocracking
1
08
25
10
10
16
*- LyondellB asell *- Valero Energy *- Valero Energy 11 Valero Energy *- Valero Energy 10 ExxonMobi l
TX
US
576
Hydrotreating
8
09
21
10
10
21
120
Crude Distillation
10 10
03 12
10 10
10 10
18 19
Tokuyam a Cadiz Muroran
Japan
4 8
10 Idemitsu Kosan 10 CEPSA 10 JX Holdings
Spain Japan
240 180
Crude Distillation Catalytic Reforming
8
10
12
10
10
19
10 JX Holdings
Muroran
Japan
180
Hydrotreating
Sarnia
McKee (Sunray) Baytown
Hydrocarbon Publishing Co. Copyright protected. 2008
71
8
10
21
10
11
21
10 Idemitsu Kosan
8
08
*-
10
10
16
8
08
*-
10
10
8
08
*-
10
8
10
25
7
02
4
Chita
Aichi
Japan
152
General outage, turnaround, or closure
10 Cosmo Oil Sakai
Japan
076
Coking
16
10 Cosmo Oil Sakai
Japan
076
Hydrotreating
10
16
10 Cosmo Oil Sakai
Japan
076
Hydrotreating
10
11
*-
10 Reliance Jamnagar Industries
India
660
Coking
*-
11
*-
*-
11
Khartoum
Sudan
050
03
*-
11
04
*-
11 Eni
Gela
General outage, turnaround, or closure General outage, turnaround, or closure
4
08
31
11
09
*-
11 BP
Lingen
Germany
086
General outage, turnaround, or closure
5
10
*-
11
*-
*-
11 BP
Gelsenkir chen
Germany
264
General outage, turnaround, or closure
3
10
16
10
10
18
10 Petrotrin
Pointe-aPierre
168
General outage, turnaround, or closure
1
10
19
10
*-
*-
10 Coffeyville Coffeyvill Resources e
Trinidad and Tobago US
114
General outage, turnaround, or closure
Ragusa Italy
KS
105
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
10
19
10
10
20
10 Valero Energy
Corpus Christi
TX
US
205
Isomerization
1
10
19
10
10
19
10 Valero Energy
Wilmingt on
CA
US
080
General Equipment
1
10
20
10
10
20
10 ExxonMobi Baytown l
TX
US
576
General Equipment
1
10
21
10
10
21
IL
US
238
1
10
21
10
*-
*-
10 ExxonMobi Joliet l 10 ExxonMobi Baytown l
TX
US
576
General outage, turnaround, or closure Crude Distillation
1
11
*-
10
*-
*-
*- ConocoPhi Belle llips Chasse
LA
US
247
Alkylation
1
10
15
10
*-
*-
Detroit
MI
US
102
1
10
15
10
11
25
Lima
OH
US
162
General outage, turnaround, or closure Coking
1
10
15
10
11
25
Lima
OH
US
162
Fluid Catalytic Cracking
1
10
18
10
10
18
*- Marathon Oil 10 Husky Energy 10 Husky Energy 10 Motiva Enterprise s
Port Arthur
TX
US
285
Sulfur Plant
1
*-
*-
10
10
18
TX
US
247
Sulfur plant
1
*-
*-
10
10
22
10 ConocoPhi Sweeny llips 10 BP Texas City
TX
US
451
Hydrotreating
1
10
22
10
11
08
10 BP
CA
US
252
General outage, turnaround, or closure
Carson
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
09
30
10
10
14
10 Tesoro
Martinez
CA
US
161
Fluid Catalytic Cracking
1
10
04
10
10
04
10 Shell Oil
Martinez
CA
US
145
1
10
05
10
10
14
10 ExxonMobi Joliet l
IL
US
238
General outage, turnaround, or closure Hydrotreating
1
10
09
10
10
09
10 Tesoro
Martinez
CA
US
161
General Equipment
1
10
06
10
10
10
10 Chalmette Chalmett Refining e
LA
US
193
General Equipment
3
10
06
10
10
16
10 Hovensa
Virgin US Islands
500
Fluid Catalytic Cracking
1
10
08
10
10
08
10 Flint Hills Corpus Resources Christi
279
General Equipment
St. Croix
TX
US
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
10
09
10
10
09
10 Sinclair Oil Sinclair
WY
US
066
Sulfur Plant
1
10
09
10
10
09
10 Sinclair Oil Sinclair
WY
US
066
Sulfur Plant
1
10
12
10
10
12
10 Valero Energy
Three Rivers
TX
US
096
Sulfur Plant
1
10
14
10
10
*-
10 ConocoPhi Linden llips
NJ
US
238
General Equipment
1
10
14
10
10
*-
10 Coffeyville Coffeyvill Resources e
KS
US
114
General outage, turnaround, or closure
1
10
14
10
10
*-
10 ExxonMobi Baton l Rouge
LA
US
505
General outage, turnaround, or closure
1
10
14
10
10
14
10 Delek Refining
Tyler
TX
US
060
Fluid Catalytic Cracking
1
10
09
10
*-
*-
Convent
LA
US
227
Sulfur Plant
2
10
12
10
10
25
Canada
187
10
13
10
10
20
Edmonto n Carson
AB
1
10 Motiva Enterprise s 10 Imperial Oil 10 BP
CA
US
252
1
10
14
10
10
15
10 Tesoro
CA
US
100
1
10
16
10
10
17
10 Husky Energy
Wilmingt on Lima
OH
US
162
General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Utilities Production
Hydrocarbon Publishing Co. Copyright protected. 2008
71
3
08
*-
10
10
07
10 Petroecua Esmerald dor as
Ecuador
110
Crude Distillation
8
09
27
10
09
29
Japan
210
Fluid Catalytic Cracking
8
09
27
10
10
05
Japan
340
Fluid Catalytic Cracking
8
10
05
10
*-
*-
10 Kashima Kashima Oil 10 JX Negishi Holdings *- Cosmo Oil Sakai
Japan
076
Fluid Catalytic Cracking
8
09
19
10
10
15
Negishi
Japan
340
Crude Distillation
8
10
04
10
11
02
250
Crude Distillation
10
02
10
*-
*-
Mizushim a Westlake
Japan
1
10 JX Holdings 10 JX Holdings *- ConocoPhi llips
LA
US
239
General outage, turnaround, or closure
1
10
02
10
10
02
10 ConocoPhi Sweeny llips
TX
US
247
General Equipment
1
10
04
10
10
05
10 Chevron
UT
US
045
Sulfur Plant
1
10
05
10
10
05
TX
US
146
Coking
1
10
06
10
10
06
10 ConocoPhi Borger llips 10 BP Toledo
OH
US
152
General outage, turnaround, or closure
1
10
06
10
10
06
10 ConocoPhi Rodeo llips
CA
US
120
H2 Production/Purification/Rec overy
1
10
07
10
10
07
TX
US
327
1
10
08
10
*-
*-
10 Deer Park Deer Park Refining 10 Valero Norco Energy
LA
US
310
General outage, turnaround, or closure General Equipment
1
10
02
10
10
04
10 BP
Texas City
TX
US
451
Catalytic Reforming
2
10
04
10
*-
*-
*- Shell Canada
Montréal
QB
Canada
121
General outage, turnaround, or closure
Salt Lake City
Hydrocarbon Publishing Co. Copyright protected. 2008
71
8
07
25
10
10
14
10 Formosa Mailiao Petrochem ical
Taiwan
540
Crude Distillation
8
10
05
10
10
12
10 Cosmo Oil Sakai
Japan
076
Fluid Catalytic Cracking
8
10
09
10
11
11
10 CPC Corp. Talin
Taiwan
300
Crude Distillation
8
11
01
10
12
06
10 CPC Corp. Taoyuan
Taiwan
200
Hydrotreating
8
12
*-
10
*-
*-
*- CPC Corp. Taoyuan
Taiwan
200
Crude Distillation
8
11
*-
10
11
*-
10 Sinopec
270
Coking
8
12
*-
10
01
*-
11 Sinopec
Maoming Guangdo China ng Jiujiang Jiangxi China
080
Fluid Catalytic Cracking
8
03
*-
11
06
*-
11 Caltex
Kurnell
Australia
106
Fluid Catalytic Cracking
7
10
07
10
10
13
10 Engen Durban Petroleum
South Africa
119
General outage, turnaround, or closure
4
*-
*-
11
*-
*-
11 Royal Dutch Shell
Pernis, Rotterda m
Netherlan ds
406
General outage, turnaround, or closure
4
09
*-
10
10
*-
10 Royal Dutch Shell
Pernis, Rotterda m
Netherlan ds
406
General outage, turnaround, or closure
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
11
04
09
02
17
10 Silver Eagle Refining
7
10
01
10
11
15
8
08
27
09
09
8
03
*-
11
1
09
13
1
09
1
Woods Cross
UT
US
013
Crude Distillation
10 Indeni Oil Ndola
Zambia
024
General outage, turnaround, or closure
28
09 Cosmo Oil Sakai
Japan
076
Crude Distillation
04
*-
11 West Dalian Pacific Petrochem icals
China
160
General outage, turnaround, or closure
10
*-
*-
*- Chevron
Pascagou la
MS
US
330
Hydrocracking
24
10
09
25
TX
US
070
09
25
10
*-
*-
10 Alon USA Big Energy Spring 10 Sunoco Philadelp hia
PA
US
330
General outage, turnaround, or closure Hydrotreating
1
09
27
10
*-
*-
10 Valero Energy
Texas City
TX
US
225
General Equipment
1
09
27
10
*-
*-
10 Valero Energy
Port Arthur
TX
US
250
General Equipment
1
09
27
10
09
27
10 Valero Energy
Benicia
CA
US
140
General outage, turnaround, or closure
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
09
27
10
09
27
10 ExxonMobi Torrance l
CA
US
150
General outage, turnaround, or closure
1
09
28
10
09
29
10 Murphy Oil Meraux
LA
US
125
General outage, turnaround, or closure
1
09
29
10
09
29
10 Flint Hills Corpus Resources Christi
TX
US
279
Fluid Catalytic Cracking
1
09
30
10
09
30
10 BP
Texas City
TX
US
451
General Equipment
3
*-
*-
10
09
30
10 Hovensa
St. Croix
Virgin US Islands
500
Fluid Catalytic Cracking
1
09
27
10
09
27
10 BP
Texas City
TX
US
451
Crude Distillation
1
09
28
10
10
04
10 BP
Carson
CA
US
252
General outage, turnaround, or closure
2 2 2 2 1
09 09 09 09 09
29 29 29 29 30
10 10 10 10 10
11 11 11 11 10
03 03 03 03 05
10 10 10 10 10
St. John St. John St. John St. John Martinez
NB NB NB NB CA
Canada Canada Canada Canada US
250 250 250 250 145
Crude Distillation Catalytic Reforming Fluid Catalytic Cracking Sulfur plant Fluid Catalytic Cracking
1
10
01
10
10
01
10 Flint Hills Corpus Resources Christi
TX
US
279
Crude Distillation
Irving Oil Irving Oil Irving Oil Irving Oil Shell Oil
Hydrocarbon Publishing Co. Copyright protected. 2008
71
1
10
01
10
10
01
10 Flint Hills Corpus Resources Christi
TX
US
279
Hydrotreating
1
10
01
10
10
01
10 Flint Hills Corpus Resources Christi
TX
US
279
Hydrotreating
1
10
01
10
10
01
10 Flint Hills Corpus Resources Christi
TX
US
279
Aromatics Production/Recovery
1
10
01
10
10
01
10 Flint Hills Corpus Resources Christi
TX
US
279
Isomerization
Hydrocarbon Publishing Co. Copyright protected. 2008
71
he drop-down buttons will appear in black.
dle East, (7) Africa, (8) Asia-Pacific Unit / plant
FCCU
FCCU
HCU
Reformer
CDU
FCCU
Unit size, Production Additional details Planned/ Date of last K b/d impact, K unplanned update b/d N.A. N.A. An FCCU will be closed for p 27-Dec-10 around 40 days of planned work in early Jan. 2011. Another FCCU will be shut for maintenance in 2012. 024.0 024.0 A four-week turnaround that p 27-Dec-10 commenced at the end of Nov. is expected to be completed at the end of Dec. N.A. N.A. *Several units, including an p 27-Dec-10 HCU and a reformer, will undergo planned maintenance this autumn, according to sources close to the refinery. N.A. N.A. *Several units, including an p 27-Dec-10 HCU and a reformer, will undergo planned maintenance this autumn, according to sources close to the refinery. N.A. N.A. *The No. 2B CDU was u 27-Dec-10 restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage. N.A. N.A. *The No. 2B CDU was u 27-Dec-10 restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage.
Hydrocarbon Publishing Co. Copyright protected. 2008
71
CDU
N.A.
N.A.
u
27-Dec-10
200.0
*The No. 2B CDU was restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage. N.A.
FCCU
200.0
p
27-Dec-10
FCCU
035.5
N.A.
N.A.
u
27-Dec-10
Maintenance
N.A.
N.A.
p
27-Dec-10
CDU
075.0
147.0
Maintenance on an unspecified process unit slightly impacted production. *The refinery was temporarily halted by a power outage on Dec. 7. The No. 6, 75K-b/d CDU, which was shut down by the power failure, was restarted on Dec. 13, while the No. 5, 50K-b/d CDU and other primary refining units were restarted on Dec. 18.
u
27-Dec-10
CDU
050.0
147.0
*The refinery was temporarily halted by a power outage on Dec. 7. The No. 6, 75K-b/d CDU, which was shut down by the power failure, was restarted on Dec. 13, while the No. 5, 50K-b/d CDU and other primary refining units were restarted on Dec. 18.
u
27-Dec-10
FCCU
N.A.
N.A.
The FCCU, which was taken down on Dec. 7 for a repair, was expected to be restarted earlier in the month; however, Valero reported on Dec. 20 that the FCCU will remain shut until after a refinery turnaround is completed. The maintenance is slated to start in Jan. 2011 and span 36 days.
u
27-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
SRU
N.A.
N.A.
u
27-Dec-10
u
27-Dec-10
031.0
Excess emissions occurred at the SCOT-4 SRU tail gas incinerator, due to a failed flame scanner at the unit's inline heater. Production was not affected. Emissions also occurred when the unit was restarted on Dec. 19. An explosion at a heavy oil upgrader hit a 45K-b/d HTU, killing one worker and injuring six others. The unit continued to operate, despite the impact, although rates at the related vacuum residue desulfurizing unit were lowered. Korean media reported that a gas leak during maintenance was the cause of the explosion, but the company did not confirm this report. The unit was shut for repairs.
HTU
045.0
045.0
FCCU
031.0
u
27-Dec-10
VGO unit
100.0
100.0
N.A.
p
27-Dec-10
Fire
N.A.
N.A.
A fire occurred, due to a leak. Four workers were injured in the blaze, which was later extinguished. The incident did not impact production.
u
27-Dec-10
Pipeline
N.A.
N.A.
u
27-Dec-10
Pipeline
N.A.
N.A.
u
27-Dec-10
Flare
N.A.
N.A.
The refinery was closed on or around Dec. 22, due to sabotage on Dec. 6 at a pipeline supplying crude to the plant. The refinery was closed on or around Dec. 22, due to sabotage on Dec. 6 at a pipeline supplying crude to the plant. Sulfur dioxide releases occurred at the refinery as a result of maintenance activity.
u
27-Dec-10
WGC
N.A.
N.A.
A wet gas compressor tripped offline. The incident led to the release of sulfur dioxide.
u
27-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Fire
N.A.
N.A.
A small fire and a unit upset occurred late in the day. The blaze was quickly contained, with no impact to production.
u
27-Dec-10
FCCU
N.A.
N.A.
u
27-Dec-10
Alkylation unit
N.A.
N.A.
u
27-Dec-10
Fire
N.A.
N.A.
u
27-Dec-10
Valve
N.A.
N.A.
u
27-Dec-10
Fire
N.A.
N.A.
u
27-Dec-10
Flare
N.A.
N.A.
u
27-Dec-10
Pipeline
N.A.
N.A.
u
27-Dec-10
HCU
N.A.
N.A.
p
27-Dec-10
Maintenance
N.A.
N.A.
An FCCU and an alkylation unit were knocked offline, but the units were restarted and returned to normal operations later in the day. An FCCU and an alkylation unit were knocked offline, but the units were restarted and returned to normal operations later in the day. A unit upset and fire led to flaring of hydrogen sulfide and sulfur dioxide. Emissions were released from the SRU and a SCOT unit, due to a faulty solenoid valve. The glitch forced the closure of the process air valves. An explosion and fire at a tanker truck parked on refinery grounds threatened nearby tanks, but firefighters were able to extinguish the blaze before it spread to the tanks. Damage to the rest of the refinery was said to be minimal. Sulfur dioxide was released from a flare, due to an electrical malfunction. Power was restored, and affected units were restarted shortly thereafter. A propane leak on a gas cracker line was expected to be repaired on Dec. 23. A hydrocracker at the east plant was closed for repairs, leading to emissions. The unit has been closed several times in the past week for repairs on an exchanger and piping. N.A.
p
27-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
CDU
150.0
150.0
The No. 4 CDU was restarted following a shutdown due to a minor leak.
u
20-Dec-10
CDU
086.0
086.0
N.A.
p
20-Dec-10
FCCU
025.5
025.5
N.A.
p
20-Dec-10
CDU
240.0
240.0
N.A.
p
20-Dec-10
CDU
165.0
165.0
N.A.
p
20-Dec-10
Outage
N.A.
116.0
The refinery, which was taken offline for an unplanned shutdown on Oct. 30, was expected to restart late in the week to Dec. 18 or in the following week. A leak in the plant's cooling system resulted in damage to several units, including the coker.
u
20-Dec-10
HCU
N.A.
N.A.
The Unipetrol-owned refinery suffered a small fire that damaged a hydrocracker.
u
20-Dec-10
Hydrogen unit
N.A.
N.A.
u
20-Dec-10
Outage
N.A.
094.0
u
20-Dec-10
Reformer
N.A.
N.A.
p
20-Dec-10
Hydrogen unit
N.A.
N.A.
p
20-Dec-10
Maintenance
N.A.
119.0
Two weeks of flaring could occur while repairs are made to a hydrogen unit. The entire refinery was knocked offline by a technical glitch. *Processing units, including a reformer and a hydrogen plant, were down for maintenance. *Processing units, including a reformer and a hydrogen plant, were down for maintenance. N.A.
p
20-Dec-10
Maintenance
N.A.
N.A.
The southern part of the refinery will be shut for planned work in 1Q 2011.
p
20-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Fire
N.A.
N.A.
Power was fully restored over the weekend of Dec. 11-12, following a small fire at an electrical switching station on Dec. 9 that resulted in flaring and power outages in some areas of the refinery. The plant is expected to be back at planned rates by Dec. 14.
u
20-Dec-10
Outage
N.A.
N.A.
u
20-Dec-10
Outage
N.A.
N.A.
u
20-Dec-10
Compressor
N.A.
N.A.
u
20-Dec-10
Outage
N.A.
N.A.
Unplanned flaring was reported. H2S was released during a brief equipment failure. An outage at a wet gas compressor caused flaring. An equipment failure resulted in an emergency flare and the release of sulfur dioxide.
u
20-Dec-10
Outage
N.A.
N.A.
u
20-Dec-10
Fire
N.A.
N.A.
A process unit overpressurized, leading to the release of "sour hydrocarbons." A flash fire erupted at the west plant.
u
20-Dec-10
Outage
N.A.
N.A.
u
20-Dec-10
FCCU
N.A.
N.A.
p
20-Dec-10
Boiler
N.A.
N.A.
p
20-Dec-10
HCU
N.A.
N.A.
p
20-Dec-10
Flare
N.A.
N.A.
p
20-Dec-10
Maintenance
N.A.
N.A.
An operational upset resulted in the release of sulfur dioxide. The planned shutdown of an FCCU for compressor repairs was expected to require flaring. Emissions occurred during maintenance at an ESP boiler. The unit was shut for maintenance on an exchanger. The refiner warned of planned flaring. N.A.
p
20-Dec-10
CDU
050.0
N.A.
*The refiner postponed planned maintenance on a CDU and a coker from Dec. 2010 to March 2011, due to a delay in materials delivery and high diesel demand.
p
13-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Coker
028.0
N.A.
*The refiner postponed planned maintenance on a CDU and a coker from Dec. 2010 to March 2011, due to a delay in materials delivery and high diesel demand. The older, 45K-b/d CDU will be stopped for planned work in Jan. 2011. The work was delayed from 2Q 2010, as a new, 65K-b/d CDU commenced production in June. The unit was shut down to repair a wet gas compressor.
p
13-Dec-10
CDU
045.0
N.A.
p
13-Dec-10
FCCU
070.0
N.A.
u
13-Dec-10
Electrical
N.A.
N.A.
Heavy rains on Dec. 2 caused a power outage and forced the refinery to close, but the plant was operating at 70% of capacity as of Dec. 7.
u
13-Dec-10
Pump
N.A.
N.A.
u
13-Dec-10
Outage
N.A.
N.A.
u
13-Dec-10
Outage
N.A.
N.A.
u
13-Dec-10
HTU
N.A.
N.A.
An equipment failure on a pump caused a benzene release. XOM reported emissions of benzene and hydrogen sulfide due to an equipment failure. The refinery experienced instrumentation problems. Sulfur dioxide escaped from a flare due to cold weather. Citgo halted the flaring and performed a partial shutdown involving an HTU.
u
13-Dec-10
Compressor
N.A.
N.A.
u
13-Dec-10
Electrical
N.A.
N.A.
A compressor tripped offline, causing a benzene release. A power outage occurred.
u
13-Dec-10
Tank
N.A.
N.A.
Flaring occurred from a PSV on a tank. The refiner adjusted operations to decrease pressure in the tank.
u
13-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Outage
N.A.
N.A.
An upset in a process unit caused flaring and forced Tesoro to depressurize the unit, but was not expected to prevent the refinery from meeting supply commitments. Nitric oxide was released from the ammonia system on the C train. An emissions release occurred due to unknown causes. An unidentified unit was closed to repair a leaking pipe. N.A.
u
13-Dec-10
Outage
N.A.
N.A.
u
13-Dec-10
Outage
N.A.
N.A.
u
13-Dec-10
Pipeline
N.A.
N.A.
u
13-Dec-10
Outage
N.A.
110.0
u
13-Dec-10
Sulfur plant
N.A.
N.A.
Two sulfur plants tripped offline, resulting in flaring.
u
13-Dec-10
Compressor
N.A.
N.A.
u
13-Dec-10
FCCU Maintenance
N.A. N.A.
N.A. N.A.
Ethylene and nitrogen oxide were released from a flare, due to a failure at an electrical breaker, which led to the shutdown of a coker wet gas compressor. N.A. N.A.
p p
13-Dec-10 13-Dec-10
Ultracracker
N.A.
N.A.
An Ultracracker and a catalytic feed hydrotreater resumed operations on Dec. 8. Flaring was expected to occur during the restarts and last until Dec. 12.
p
13-Dec-10
HTU
N.A.
N.A.
An Ultracracker and a catalytic feed hydrotreater resumed operations on Dec. 8. Flaring was expected to occur during the restarts and last until Dec. 12.
p
13-Dec-10
CDU
075.0
075.0
u
6-Dec-10
CDU
100.0
N.A.
The No. 6 CDU was restarted following several days of minor repair work. The unit and related facilities will be shut in late Feb. 2011 for scheduled maintenance.
p
6-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Fire
N.A.
012.0
A fire broke out at a distillation plant; the blaze was extinguished shortly thereafter. The fire was the third to occur at the refinery in the space of a year; in Dec. 2009, two tank fires broke out within five days of one another. An investigation into the most recent incident has been launched.
u
6-Dec-10
Tank
N.A.
N.A.
u
6-Dec-10
Maintenance
N.A.
N.A.
p
6-Dec-10
CDU
150.0
150.0
p
6-Dec-10
Maintenance
N.A.
N.A.
p
6-Dec-10
FCCU
102.0
061.0
u
6-Dec-10
Alkylation unit
N.A.
N.A.
An accident occurred at a bitumen tank, which must be cooled, emptied, and repaired. Refinery production was not impacted by the incident. Some production units were temporarily shut down. The unit will be closed for about 45 days of maintenance, according to a trade source. The refinery will be shut for maintenance from late April 2011 to the end of May. The closure will significantly impact the production and supply of naphtha. *Rates at the FCCU were cut to 60% of capacity on Nov. 23 as the restart of the alkylation unit was delayed by around two weeks, to the end of Nov. Maintenance on the units began in Aug.; the FCCU was restarted in Oct. and is expected to return to full rates over the weekend of Dec. 4-5. *Rates at the FCCU were cut to 60% of capacity on Nov. 23 as the restart of the alkylation unit was delayed by around two weeks, to the end of Nov. Maintenance on the units began in Aug.; the FCCU was restarted in Oct.
u
6-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Electrical
N.A.
N.A.
A power outage occurred as a result of a glitch at a thirdparty electricity provider. The incident forced the temporary closure of some units. One of the units suffered an additional upset during a restart attempt.
u
6-Dec-10
Outage
N.A.
N.A.
u
6-Dec-10
SRU
N.A.
N.A.
Flaring and steam venting occurred. SRU No. 3 tripped, leading to the release of hydrogen sulfide and sulfur dioxide.
u
6-Dec-10
Outage
N.A.
N.A.
u
6-Dec-10
Outage
N.A.
N.A.
u
6-Dec-10
FCCU
N.A.
N.A.
u
6-Dec-10
FCCU
N.A.
N.A.
An equipment failure and unit malfunction resulted in the release of benzene. A malfunction resulted in the release of sulfur dioxide. Unplanned emissions at the unit were reported. N.A.
u
6-Dec-10
Butamer unit
N.A.
N.A.
u
6-Dec-10
Electrical
N.A.
640.0
u
6-Dec-10
FCCU
N.A.
N.A.
Butamer unit No. 36 in the west plant was closed to repair a leak at the boiler feed water system. An electrical problem forced the temporary closure of the plant. N.A.
u
6-Dec-10
Valve
N.A.
N.A.
u
6-Dec-10
Fuel gas treater
N.A.
N.A.
u
6-Dec-10
Pipeline
N.A.
N.A.
A leaking valve at the coker gas plant resulted in flaring. The refiner isolated a failure at one of the plant's fuel gas treating units. The unit is being restored to normal rates, and all customer needs are being met. Emissions occurred after a leak was located on a line between the process units and a pump. The leak was isolated and workers blocked the line to stop the flaring.
u
6-Dec-10
Hydrogen unit
N.A.
N.A.
A hydrogen unit was briefly knocked offline, due to an electrical mishap.
u
6-Dec-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
FCCU
N.A.
N.A.
The unit tripped, resulting in flaring. Heavy rains forced refinery processing to a minimum, but later improvement in the weather allowed processing units to resume normal operations. A boiler malfunction resulted in overpressurization of another unit and flaring. The problem was isolated, and production was minimally impacted. Several units, including one of the catalytic units, an HDS, and a viscosity reducer, were restarted from maintenance.
u
6-Dec-10
Outage
N.A.
N.A.
u
6-Dec-10
Boiler
N.A.
N.A.
u
6-Dec-10
Maintenance
N.A.
N.A.
p
6-Dec-10
Reformer Maintenance
N.A. N.A.
N.A. N.A.
N.A. N.A.
p p
6-Dec-10 6-Dec-10
Maintenance
N.A.
N.A.
Excess opacity occurred. The refiner said the incident was the result of a test to see if a different configuration would lower opacity overall.
p
6-Dec-10
Compressor
N.A.
N.A.
p
6-Dec-10
Maintenance
N.A.
N.A.
p
6-Dec-10
Maintenance
N.A.
N.A.
p
6-Dec-10
Maintenance
N.A.
N.A.
Maintenance and emissions associated with a high-stage compressor were reported. Sulfur dioxide was released through an incinerator during a turnaround. A planned release from the flare and heaters occurred. Minor maintenance work and planned flaring occurred.
p
6-Dec-10
RFCCU Maintenance
N.A. N.A.
N.A. N.A.
N.A. Planned maintenance at select areas of the refinery will result in expected flaring.
p p
6-Dec-10 6-Dec-10
HTU HCU CDU
N.A. N.A. 160.0
N.A. N.A. 160.0
p p u
6-Dec-10 6-Dec-10 29-Nov-10
CDU
140.0
140.0
N.A. N.A. The unit was restarted following a closure related to poor margins. N.A.
u
29-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Pump
N.A.
N.A.
A pumping unit was repaired.
u
29-Nov-10
Outage
N.A.
N.A.
u
29-Nov-10
CDU
120.0
120.0
u
29-Nov-10
CDU
005.0
005.0
The refiner reported a problem with an unspecified secondary that is expected to reduce middle distillate exports. The CDU will be permanently closed by Sept. 2011, as a result of weak domestic demand. N.A.
p
29-Nov-10
Maintenance
N.A.
260.0
p
29-Nov-10
CDU
140.0
140.0
p
29-Nov-10
Pipeline
N.A.
N.A.
The plant will be closed for scheduled maintenance in mid-2011. The unit will undergo planned work in 2013. Fuji decided to skip maintenance on the unit in 2011. The plant was forced to shut down after militant sabotage damaged the Warri-Escravos pipeline, which feeds crude to the refinery. The shutdown is not expected to impact supplies to fuel stations.
u
29-Nov-10
Pipeline
N.A.
N.A.
u
29-Nov-10
FCCU
N.A.
N.A.
p
29-Nov-10
FCCU
070.0
N.A.
u
29-Nov-10
Outage
N.A.
N.A.
The refinery was forced to shut down after militant activists blew up the WarriEscravos pipeline, which feeds crude to the plant. The shutdown is not expected to impact supplies to fuel stations. Shell has delayed the planned restart of an FCCU that was closed for maintenance in Sept., the company reported on Nov. 26. The unit was repaired after being knocked offline by a power outage. A process upset may have resulted in an H2S release the following day.
u
29-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Outage
N.A.
N.A.
Electrical
N.A.
N.A.
Outage
N.A.
N.A.
Maintenance
N.A.
N.A.
FCCU
N.A.
N.A.
Fire
N.A.
N.A.
Pump
N.A.
N.A.
SRU
N.A.
N.A.
Compressor
N.A.
N.A.
Outage
N.A.
N.A.
A pinhole leak on a distillate line in a processing unit was discovered. The leak allowed light coker naphtha to escape. The refinery experienced a power outage on Nov. 20, due to an equipment failure at its electricity supplier, but the plant was restarted on Nov. 22. However, the refinery witnessed a small fire in an overhead line carrying diesel during the restart process on Nov. 23. The restart continued, despite the fire. Flaring of H2S occurred due to an equipment failure. Brief maintenance resulted in flaring. Operations at an FCCU were suspended after the unit tripped offline and emitted more than 500 lb (227 kg) of SO2. A small fire occurred at a processing area, but it was extinguished within half an hour, and the refinery continued to operate. Hydrogen fluoride was released due to a failure on a pump in an allocation unit. The pump was shut to contain the release. An air compressor trip forced the temporary shutdown of an SRU. Flaring from a wet gas compressor was reported after the unit, which is located at the saturated gas recovery plant, received light ends material from an unknown source. Production was not affected by the incident.
u
29-Nov-10
u
29-Nov-10
u
29-Nov-10
p
29-Nov-10
u
29-Nov-10
u
29-Nov-10
u
29-Nov-10
u
29-Nov-10
u
29-Nov-10
Natural gas and smoke were released at the refinery.
u
29-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Electrical
N.A.
N.A.
Tesoro reported an SO2 release due to a power outage. Power was quickly restored, and refinery operations were not impacted. Emissions were reported after a process upset. The emissions were routed to a control device. The refinery was restarted after longer-than-anticipated maintenance was completed.
u
29-Nov-10
Outage
N.A.
N.A.
u
29-Nov-10
Maintenance
N.A.
N.A.
p
29-Nov-10
Maintenance
N.A.
N.A.
N.A.
p
29-Nov-10
FCCU
N.A.
N.A.
N.A.
p
29-Nov-10
Coker
N.A.
N.A.
N.A.
p
29-Nov-10
Maintenance
N.A.
N.A.
N.A.
p
29-Nov-10
CDU
100.0
N.A.
u
22-Nov-10
CDU
075.0
075.0
A fire erupted at a pipe associated with the No. 7 CDU. The incident was quickly brought under control and operations were not impacted; however, two contract workers suffered slight burns. N.A.
p
22-Nov-10
CDU
330.0
330.0
N.A.
p
22-Nov-10
CDU
160.0
160.0
p
22-Nov-10
Coker
N.A.
160.0
*A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work. *A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work.
p
22-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
HCU
N.A.
160.0
CDU
N.A.
150.0
Condensate train
140.0
N.A.
Condensate train
140.0
N.A.
Maintenance
N.A.
N.A.
Maintenance
N.A.
N.A.
Maintenance
N.A.
N.A.
Maintenance
N.A.
N.A.
Maintenance
N.A.
N.A.
FCCU
N.A.
N.A.
HDS
N.A.
N.A.
*A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work. XOM halted jet fuel output at the plant on Sept. 13 after the CDU caught fire on Sept. 11, marking the second blaze in less than two weeks. The refinery was gradually ramping up rates by Nov. 19.
p
22-Nov-10
u
22-Nov-10
A condensate train and gasoline production plant were being restarted from maintenance. One of the two 140K-b/d condensate trains will be shut from mid-Jan. 2011 for planned work. Gasoline units will see planned maintenance in 2Q 2011. Diesel units will see planned maintenance in 3Q 2011. Maintenance will be carried out at gasoline and diesel units during 2Q 2011. Gasoline and diesel plants will see planned work in 2Q 2011. During 4Q 2011, gasoline and diesel units will undergo work. A brief fire knocked offline the FCCU. The unit remained offline until minor repairs were made. A worker was injured in a fire at an HDS unit. The unit, located in the Point Breeze section of the refinery, had been under turnaround for 10 days before the blaze erupted.
p
22-Nov-10
p
22-Nov-10
p
22-Nov-10
p
22-Nov-10
p
22-Nov-10
p
22-Nov-10
p
22-Nov-10
u
22-Nov-10
u
22-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
FCCU
N.A.
N.A.
Various blowers shut down while circulating catalyst, causing opacity at an FCCU.
u
22-Nov-10
Outage
N.A.
N.A.
An equipment failure resulted in a leak in a process line.
u
22-Nov-10
ESP
N.A.
N.A.
u
22-Nov-10
Outage
N.A.
N.A.
u
22-Nov-10
Fire
N.A.
N.A.
Excess opacity was caused by an upset at the electrostatic precipitator (ESP). A restart of the ESP resulted in boiler emissions from an FCCU. Flaring was caused by excess pressure at a vessel in the east plant. A small fire broke out and was extinguished. No impact to production was seen.
u
22-Nov-10
Outage
N.A.
N.A.
u
22-Nov-10
Outage
N.A.
N.A.
u
22-Nov-10
Compressor
N.A.
N.A.
u
22-Nov-10
SRU
N.A.
N.A.
u
22-Nov-10
Flare
N.A.
N.A.
u
22-Nov-10
HTU
N.A.
N.A.
u
22-Nov-10
VDU
N.A.
N.A.
u
22-Nov-10
FCCU
N.A.
N.A.
Emissions were released during a restart of the refinery on Nov. 16. It was previously reported that repairs to the plant were being made on Nov. 9. A unit upset led to the release of sulfur dioxide and hydrogen sulfide. A sour water leak from a compressor in Power Unit 2 did not affect production. An operator error at the SRU resulted in flaring of sulfur dioxide. Erosion on the flare line resulted in the release of hydrogen sulfide. Shell is preparing to install a clamp over the line. Flaring was reported due to a compressor outage, which knocked offline an HTU. The firm prepared to restart a VDU that has been shut since a pipe explosion on Nov. 4, 2009. Several other units are still offline following the blast. N.A.
p
22-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Alkylation unit
N.A.
N.A.
N.A.
p
22-Nov-10
Maintenance
N.A.
N.A.
p
22-Nov-10
Flare
N.A.
N.A.
p
22-Nov-10
Cracker
N.A.
N.A.
Maintenance was carried out at distillation and hydrotreating units. Planned flaring is expected to occur from Nov. 25-Dec. 21. The refiner previously stated that flaring would also occur from Nov. 15-26. N.A.
p
22-Nov-10
CDU
050.0
050.0
p
15-Nov-10
Naphtha HDS
N.A.
N.A.
p
15-Nov-10
DSU
N.A.
N.A.
p
15-Nov-10
Alkylation unit
N.A.
N.A.
p
15-Nov-10
HCU
N.A.
N.A.
p
15-Nov-10
Visbreaker
N.A.
N.A.
p
15-Nov-10
Topping unit
N.A.
N.A.
p
15-Nov-10
VDU
N.A.
N.A.
The No. 5 CDU was be offline while planned work was carried out on secondary units. Two gasoline-making units that were shut for two weeks of planned work in mid-Oct. are still closed as of Nov. 10, as maintenance is taking longer than expected, the company said. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work.
p
15-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Reformer
N.A.
N.A.
Regenerator
N.A.
N.A.
FCCU
N.A.
N.A.
Outage
N.A.
N.A.
Outage
N.A.
N.A.
Outage
N.A.
N.A.
Compressor
N.A.
N.A.
Aromatics unit
N.A.
N.A.
Electrical
N.A.
N.A.
RHTU
N.A.
N.A.
Flare
N.A.
N.A.
Water treatment system
N.A.
N.A.
In 4Q 2011, runs will be cut at a catalytic reformer during scheduled work. Emissions occurred as the FCCU regenerator was being loaded with fresh catalyst and preheated, in preparation for startup. The catalyst loading was halted, and operations were returned to normal.
p
15-Nov-10
u
15-Nov-10
A processing glitch at the unit led to emissions. Emissions and an instrumentation failure were reported during a startup at the refinery. VOCs were released from a tank. An equipment failure led to the release of SO2. The company said it was working to fix the problem. Emissions associated with repairs at the plant were reported.
u
15-Nov-10
u
15-Nov-10
u
15-Nov-10
u
15-Nov-10
A compressor tripped offline, resulting in the release of SO2, NOX, and VOCs. The BTX unit was brought back online one day after being shut due to a benzene leak from a suction valve on a pump. A power outage abruptly shut down the refinery. Power was restored later that day, which allowed the refinery to begin the restart process.
u
15-Nov-10
u
15-Nov-10
u
15-Nov-10
Flaring was reported due to a frozen propane line linked to the residual hydrotreater. Emissions occured due to a slight overpressurization in a vessel. Set point pressure was raised to stop the flaring.
u
15-Nov-10
u
15-Nov-10
Sodium hydroxide was released from a water treatment system into the soil.
u
15-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Boiler
N.A.
N.A.
N.A.
u
15-Nov-10
CDU
N.A.
N.A.
*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.
p
15-Nov-10
HTU
N.A.
N.A.
*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.
p
15-Nov-10
Hydroformer
N.A.
N.A.
*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.
p
15-Nov-10
HDS
N.A.
N.A.
*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.
p
15-Nov-10
Deasphalting unit
N.A.
N.A.
*A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work.
p
15-Nov-10
CDU
N.A.
N.A.
*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.
p
15-Nov-10
Rheniformer
N.A.
N.A.
*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.
p
15-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
FCCU
N.A.
N.A.
*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.
p
15-Nov-10
Sulfur plant
N.A.
N.A.
*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.
p
15-Nov-10
Maintenance
N.A.
083.0
N.A.
p
15-Nov-10
Maintenance
N.A.
N.A.
p
15-Nov-10
Flare
N.A.
N.A.
Maintenance was performed on a number of units. Production was slightly impacted. Planned flaring is expected.
p
15-Nov-10
CDU
050.0
086.7
p
8-Nov-10
Coker
036.7
086.7
p
8-Nov-10
FCCU CDU
027.9 110.0
N.A. 110.0
*The two were closed from end-Oct. for maintenance that will last about 20 days, according to industry sources. *The two were closed from end-Oct. for maintenance that will last about 20 days, according to industry sources. N.A. N.A.
p p
8-Nov-10 8-Nov-10
CDU
260.0
260.0
N.A.
p
8-Nov-10
CDU
060.0
060.0
N.A.
p
8-Nov-10
CDU
240.0
240.0
N.A.
p
8-Nov-10
CDU
200.0
200.0
N.A.
p
8-Nov-10
Cracker
N.A.
N.A.
The refinery was evacuated following a gas leak at a naphtha cracker, which has been offline since the end of Sept. for maintenance.
u
8-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
HCU
N.A.
N.A.
FCCU Outage
N.A. N.A.
N.A. N.A.
FCCU
104.0
N.A.
Outage
N.A.
N.A.
Electrical
N.A.
N.A.
Transformer
N.A.
N.A.
Fire
N.A.
071.0
DSU
N.A.
N.A.
Electrical
N.A.
N.A.
Compressor
N.A.
N.A.
An HCU will be ramped down from Nov. 4-8 for maintenance through Nov. 20. Work includes catalyst change, inspections, and cleaning. N.A. The refinery, which has been shut since an explosion that killed seven workers, began restarting on Oct. 4 and was partially restarted, including the CDU, as of Oct. 19, but was delayed due to a boiler problem over the weekend of Oct. 23-24. The plant is expected to reach planned rates by Nov. 13.
p
8-Nov-10
p u
8-Nov-10 8-Nov-10
The unit was taken offline for repairs to fix problems with the unit's air distributor and regenerator. The refinery was back to planned rates following the loss of steam and hydrogen supplies. A portion of the refinery was still being restarted following complications from a power outage. A transformer switched, forcing the refiner to reroute power to another transformer.
u
8-Nov-10
u
8-Nov-10
u
8-Nov-10
u
8-Nov-10
A fire forced the closure of the refinery. The blaze, which occurred at an unspecified processing unit, was due to a failed gasket. A malfunction involving a valve at a DSU resulted in emissions. An external power failure knocked a unit offline and resulted in emissions of sulfur dioxide and hydrogen sulfide.
u
8-Nov-10
u
8-Nov-10
u
8-Nov-10
The unit tripped offline.
u
8-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
FCCU
N.A.
N.A.
Operations at an FCCU were briefly disrupted when oxygen from an outside provider was cut. A wet gas compressor went down. A release of ethylene occurred while pumps were being swapped. A process upset at an FCCU resulted in emissions.
u
8-Nov-10
Compressor
N.A.
N.A.
u
8-Nov-10
Pump
N.A.
N.A.
u
8-Nov-10
FCCU
N.A.
N.A.
u
8-Nov-10
SRU
N.A.
N.A.
An isolated power blip at an SRU resulted in excess emissions of SO2. A breakdown led to flaring, Tesoro said. Trade sources said the unit involved was an HCU. Alon shut down the 40K-b/d Long Beach part of the refinery due to poor economics, trade sources said. The Paramount part of the complex remains in operation, but at reduced rates. The unit is expected to be restarted during the week to Nov. 6, according to sources close to the refinery. The unit, which went down for maintenance on or around Sept. 7, originally was expected to be restarted in the week Oct. 30.
u
8-Nov-10
HCU
N.A.
N.A.
u
8-Nov-10
Outage
N.A.
040.0
u
8-Nov-10
FCCU
120.0
N.A.
p
8-Nov-10
Maintenance
N.A.
130.0
N.A.
p
8-Nov-10
FCCU
N.A.
N.A.
p
8-Nov-10
N.A.
N.A.
The No. 3 FCCU commenced a restart on Oct. 31. Emissions related to the restart could last through Nov. 7. *The refiner was wrapping up an overhaul at an FCCU and preparing to commence planned work at the FCCU's associated alkylation unit.
FCCU
p
8-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Alkylation unit
N.A.
N.A.
*The refiner was wrapping up an overhaul at an FCCU and preparing to commence planned work at the FCCU's associated alkylation unit.
p
8-Nov-10
Maintenance
N.A.
N.A.
N.A.
p
8-Nov-10
Maintenance
N.A.
N.A.
The refiner said that maintenance is occurring at conversion units. The work is resulting in lower throughput.
p
8-Nov-10
Flare
N.A.
N.A.
p
8-Nov-10
Maintenance
N.A.
N.A.
The refiner warned of planned flaring. N.A.
p
8-Nov-10
Maintenance
N.A.
N.A.
N.A.
p
8-Nov-10
Maintenance
N.A.
N.A.
p
8-Nov-10
Electrical
N.A.
400.0
u
1-Nov-10
HTU
054.0
054.0
u
1-Nov-10
Outage
N.A.
N.A.
u
1-Nov-10
SRU
N.A.
N.A.
u
1-Nov-10
FCCU
N.A.
N.A.
Planned work will be performed during 4Q 2011. A power outage forced the plant to shut down. The coker gas oil HTU, which has been shut since a deadly explosion erupted at the refiner on Sept. 7, is expected to be restarted in early 2011. Previous reports stated that the unit was restarted later Sept. An equipment failure was related to scheduled maintenance that commenced earlier. The glitch led to the release of NOX to the flare stack. An SRU process frame tripped. *Power was lost during a thunderstorm, which triggered malfunctions at an FCCU and an alkylation unit.
u
1-Nov-10
Alkylation unit
N.A.
N.A.
*Power was lost during a thunderstorm, which triggered malfunctions at an FCCU and an alkylation unit.
u
1-Nov-10
Outage
N.A.
N.A.
Instrumentation issues caused intermittent flaring.
u
1-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Outage
N.A.
N.A.
A power outage led to equipment shutdowns and flaring. A unit upset was followed by the release of SO2 and SO3.
u
1-Nov-10
Outage
N.A.
N.A.
u
1-Nov-10
Electrical
N.A.
N.A.
A transformer failed on the afternoon of Oct. 26, cutting power to the undermaintenance plant. Electricity was restored the next day, and the plant was gradually powered up over the following days. The outage was expected to extend planned maintenance, delaying the restart of a CDU by about one month to late Nov. As of Oct. 29, the FCCU is still offline as the refiner assesses any damage that might have been caused by the power outage.
u
1-Nov-10
Electrical
N.A.
N.A.
u
1-Nov-10
Depropanizer
N.A.
N.A.
u
1-Nov-10
Outage
N.A.
N.A.
u
1-Nov-10
Electrical
N.A.
N.A.
A power outage caused flaring. A leak at a depropanizer cooler in a catalytic reformer did not impact production; the leak was quickly repaired. Emissions from the repairs are expected to continue for several days. Flaring was reported on Oct. 27; the plant was still recovering from a loss of hydrogen and steam on Oct. 22. A power blip led to flaring.
u
1-Nov-10
Outage
N.A.
N.A.
u
1-Nov-10
Outage
N.A.
N.A.
u
1-Nov-10
Hydroconversion unit
N.A.
N.A.
An instrument failure led to flaring. An unspecified equipment failure led to acid gas flaring. A raffinate hydroconversion unit was taken offline to fix a leak. The shutdown of the unit resulted in flaring.
u
1-Nov-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Outage
N.A.
N.A.
A unit malfunction was accompanied by evacuation alarms, but the incident was quickly brought under control and production was not impacted. An equipment malfunction resulted in excess emissions.
u
1-Nov-10
Outage
N.A.
N.A.
u
1-Nov-10
Maintenance
N.A.
N.A.
N.A.
p
1-Nov-10
HCU
N.A.
N.A.
N.A.
p
1-Nov-10
Maintenance
N.A.
N.A.
N.A.
p
1-Nov-10
CDU
N.A.
N.A.
N.A.
p
1-Nov-10
CDU
N.A.
N.A.
p
1-Nov-10
FCCU
110.0
N.A.
Planned work on a CDU compressor was not expected to impact production. N.A.
p
1-Nov-10
CDU
N.A.
N.A.
N.A.
p
1-Nov-10
Coker
N.A.
N.A.
N.A.
p
1-Nov-10
Maintenance
N.A.
140.0
p
1-Nov-10
HCU
030.0
N.A.
The plant will be closed for 36 days of work. N.A.
p
1-Nov-10
Gofiner
N.A.
N.A.
p
25-Oct-10
CDU
120.0
120.0
u
25-Oct-10
CDU Reformer
N.A. 036.0
N.A. N.A.
p u
25-Oct-10 25-Oct-10
DSU
065.0
N.A.
Planned work on several Gofiners is expected to last for several months. The unti was shut due to weak demand. N.A. *A reformer and a naphtha desulfurizer were closed due to a gas leak in the desulfurizer. *A reformer and a naphtha desulfurizer were closed due to a gas leak in the desulfurizer.
u
25-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Maintenance
N.A.
152.0
The refinery commenced a one-month closure, prompted by sluggish domestic demand. Maintenance will be performed during the economic closure.
u
25-Oct-10
Coker
025.0
067.0
u
25-Oct-10
Gas oil HDS
025.0
067.0
u
25-Oct-10
Naphtha HDS
017.0
067.0
u
25-Oct-10
Coker
160.0
N.A.
p
25-Oct-10
Maintenance
N.A.
N.A.
p
25-Oct-10
Maintenance
N.A.
N.A.
*The unit was restarted, along with several others, following inspections that commenced in Aug. *The unit was restarted, along with several others, following inspections that commenced in Aug. *The unit was restarted, along with several others, following inspections that commenced in Aug. The coker will be offline for about 15 days of routine maintenance from late Oct. Major maintenance will be performed in Feb. 2011. Unspecified units will be closed from March-April 2011 for planned maintenance.
p
25-Oct-10
Maintenance
N.A.
N.A.
The plant will be closed for around six weeks of inspections and maintenance from the end of Aug. 2011, according to sources close to the refinery.
p
25-Oct-10
Maintenance
N.A.
264.0
p
25-Oct-10
Fire
N.A.
N.A.
The refinery will be closed for maintenance sometime during 4Q 2011, according to industry sources. N.A.
u
25-Oct-10
Outage
N.A.
N.A.
An unspecified unit was shut down after an equipment malfunction led to the release of materials to the flare. The unit will require repairs.
u
25-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Butamer unit
N.A.
N.A.
A leak at the butamer unit in complex 6 of the west plant was reported on Oct. 19 and fixed by Oct. 20. The incident and repair work was expected to have resulted in the release of butane, propane, VOGs, isobutene, CO, and NOX. A compressor tripped offline, triggering flaring. Production was not impacted. Flaring was reported, due to a compressor trip at Booster Station 4. An equipment failure resulted in flaring. Also, a CDU (dubbed Pipestill 3) was undergoing a turnaround. Throughput at the unit has been reduced while work is performed on a booster station.
p
25-Oct-10
Compressor
N.A.
N.A.
u
25-Oct-10
Compressor
N.A.
N.A.
u
25-Oct-10
Flare
N.A.
N.A.
u
25-Oct-10
CDU
N.A.
N.A.
u
25-Oct-10
Alkylation unit
N.A.
N.A.
p
25-Oct-10
N.A.
Work is expected to commence in Nov. on an alkylation unit. N.A.
Maintenance
N.A.
p
25-Oct-10
Coker
N.A.
N.A.
N.A.
p
25-Oct-10
FCCU
N.A.
N.A.
N.A.
p
25-Oct-10
TGTU
N.A.
N.A.
Tail gas treating unit 2 was shut for several hours for maintenance to remove sulfur from the distribution manifold.
p
25-Oct-10
Sulfur plant
N.A.
N.A.
N.A.
p
25-Oct-10
RHTU
N.A.
N.A.
A residual hydrotreater resumed normal operations on Oct. 22. The unit had been down for maintenance.
p
25-Oct-10
Flare
N.A.
N.A.
The refiner warned of planned flaring.
p
25-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
FCCU
N.A.
N.A.
An unplanned overhaul at an FCCU was extended by at least one week, trade sources noted. Tesoro originally said the unit was taken offline on Sept. 30 for around one week of work. Flaring was reported amid repairs to the flare system. A diesel HTU was knocked offline by a compressor fire on Oct. 5; repairs to the damaged HTU began on Oct. 7. The incident at the compressor led to the release of SO2 and NOX. A fire at a sludge tank injured one worker. The blaze erupted while maintenance was being performed on the tank; production was not impacted.
u
18-Oct-10
Flare
N.A.
N.A.
u
18-Oct-10
HTU
N.A.
N.A.
u
18-Oct-10
Tank
N.A.
N.A.
u
18-Oct-10
Pipeline
N.A.
N.A.
A hydrogen sulfide leak from a pipe was repaired; the leak was said to have affected production. A worker collapsed and died while in the process of repairing the leak on Oct. 6, but it has yet to be determined if the death was related to the leaking gas. Operations were back to normal as of Oct. 14.
u
18-Oct-10
FCCU
145.0
N.A.
The 145K-b/d FCCU is anticipated to reach normal rates by the weekend of Oct. 16-17, after being closed on Oct. 6 by a weather-related power outage, and then later restarted on Oct. 8.
u
18-Oct-10
Compressor
N.A.
N.A.
Flaring occurred when a wet gas compressor tripped offline at a heavy oil cracker at the west plant. The unit was quickly returned to service, and production was not affected.
p
18-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
SRU
N.A.
N.A.
SCOT
N.A.
N.A.
SRU
N.A.
N.A.
Compressor
N.A.
N.A.
Outage
N.A.
N.A.
Outage
N.A.
N.A.
FCCU
N.A.
N.A.
SRU
N.A.
N.A.
Maintenance
N.A.
N.A.
Flare
N.A.
N.A.
Flare
N.A.
N.A.
Boiler
N.A.
N.A.
*Sinclair cut feed to the sulfur units and restarted the SCOT unit. The refiner stated in a regulatory filing, "Hydrocarbon carryover to the No. 3 and No. 4 SRUs caused the TTO on No. 3 to shut down, and the SCOT and TTO on No. 4 to shut down." *Sinclair cut feed to the sulfur units and restarted the SCOT unit. The refiner stated in a regulatory filing, "Hydrocarbon carryover to the No. 3 and No. 4 SRUs caused the TTO on No. 3 to shut down, and the SCOT and TTO on No. 4 to shut down." A glitch occurred at the No. 1 SRU; the upset did not impact production. Flaring was reported, due to the loss of a compressor. Operations were curbed to reduce the flaring. An unspecified equipment failure occurred after H2S was released.
u
18-Oct-10
u
18-Oct-10
u
18-Oct-10
p
18-Oct-10
u
18-Oct-10
An unspecified unit was shut down, due to a jet fuel leak on a pipeline. The FCCU suffered a glitch. Workers stabilized the unit shortly thereafter. An SRU was closed, which caused SO2 flaring.
u
18-Oct-10
u
18-Oct-10
p
18-Oct-10
Maintenance on unspecified units was scheduled. The refiner warned of planned flaring. The refiner warned of planned flaring. A boiler was replaced at the refinery over the weekend of Oct. 16-17 as part of routine maintenance.
p
18-Oct-10
p
18-Oct-10
p
18-Oct-10
p
18-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
CDU
N.A.
110.0
p
11-Oct-10
N.A.
The plant was closed down from Aug. to carry out a refurbishment at a CDU. N.A.
FCCU
035.5
u
11-Oct-10
FCCU
041.0
N.A.
N.A.
u
11-Oct-10
FCCU
024.0
N.A.
N.A.
u
11-Oct-10
CDU
150.0
150.0
N.A.
p
11-Oct-10
CDU
140.0
140.0
N.A.
p
11-Oct-10
Outage
N.A.
N.A.
An emergency shutdown of a unit was performed. The incident caused flaring, which resulted in a small grass fire.
u
11-Oct-10
Compressor
N.A.
N.A.
u
11-Oct-10
SRU
N.A.
N.A.
A gas compressor was shut to repair a leak in a hydrogen quench line supplying reactor No. 4. N.A.
u
11-Oct-10
Coker
N.A.
N.A.
u
11-Oct-10
Outage
N.A.
N.A.
u
11-Oct-10
Hydrogen unit
N.A.
N.A.
u
11-Oct-10
Electrical
N.A.
N.A.
u
11-Oct-10
Compressor
N.A.
N.A.
u
11-Oct-10
Ultraformer
N.A.
N.A.
p
11-Oct-10
Maintenance
N.A.
121.0
The unit malfunctioned, triggering flaring. A process unit upset resulted in the release of H2S and SO2. Flaring and a release of SO2 occurred due to the shutdown of a third-party hydrogen plant. A power outage caused flaring. A glitch with a coupling at a reformer hydrogen compressor impacted production. Ultraformer No. 3 was restarted, following a maintenance closure. The restart process was slated to last three days. A four-week maintenance closure commenced on or around Oct. 4.
p
11-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
CDU
180.0
180.0
u
11-Oct-10
N.A.
The last of the plant's three 180K-b/d CDUs was restarted after an oil leak sparked a fire at a residual desulfurization unit. N.A.
FCCU
024.0
u
11-Oct-10
CDU
100.0
100.0
N.A.
p
11-Oct-10
RDSU
030.0
N.A.
N.A.
p
11-Oct-10
CDU
100.0
100.0
N.A.
p
11-Oct-10
Coker
036.7
N.A.
N.A.
p
11-Oct-10
FCCU
023.3
N.A.
p
11-Oct-10
FCCU
021.5
N.A.
p
11-Oct-10
Electrical
N.A.
119.0
The unit will be closed for more than 40 days of planned work. One of the two 21.5K-b/d FCCUs will be closed for scheduled work. The refinery suffered a power failure and saw complications during a restart attempt.
p
11-Oct-10
Maintenance
N.A.
N.A.
p
11-Oct-10
Maintenance
N.A.
N.A.
Shell said on Oct. 15 that it has postponed maintenance on a hydrocracker to spring 2011; the work had been scheduled to take place in 4Q 2010. Units at the plant that were shut in Sept. will be restarted by the end of Oct., to boost fuel output in response to strikes over pension reforms in France, which have crippled the country's refining industry.
p
11-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
CDU
013.0
N.A.
The No. 1 CDU, which was damaged in a pipe explosion, commenced a restart on Feb. 17. After the CDU reaches planned rates, the refiner will restart, one by one, the VDU, the SRU, and the reformer. The distillate dewaxing unit, where the explosion occurred, is expected to be restarted following the recent conclusion of an investigation into the incident, Silver Eagle said on Sept. 27.
u
4-Oct-10
Maintenance
N.A.
024.0
p
4-Oct-10
CDU
080.0
080.0
The plant will be shut for 45 days of annual maintenance. Stocks are said to be adequate to cover requirements. N.A.
p
4-Oct-10
Maintenance
N.A.
160.0
The refiner plans to carry out a major, 45-day turnaround in March and April 2011. The work is performed once every four years.
p
4-Oct-10
HCU
N.A.
N.A.
u
4-Oct-10
Flare
N.A.
N.A.
u
4-Oct-10
HTU
N.A.
N.A.
u
4-Oct-10
Compressor
N.A.
N.A.
u
4-Oct-10
Compressor
N.A.
N.A.
u
4-Oct-10
Fire
N.A.
N.A.
The unit was hit by a fire; the fire was quickly extinguished, and no other units were impacted. Emissions occurred due to a heavy thunderstorm. A diesel hydrotreater unit was shut, due to an upset that resulted in the release of a diesel mist into the atmosphere. A compressor malfunction occurred in Complex 7 of the refinery, causing flaring. A wet gas compressor tripped in the delayed coker, but it did not impact production. A small fire was extinguished at the plant; the incident did not impact operations.
u
4-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Flare
N.A.
N.A.
Electrical
N.A.
N.A.
FCCU
N.A.
N.A.
Pipeline
N.A.
N.A.
FCCU
N.A.
N.A.
CDU
N.A.
N.A.
Flare
N.A.
N.A.
CDU Rheniformer FCCU Sulfur plant FCCU
N.A. N.A. N.A. N.A. N.A.
N.A. N.A. N.A. N.A. N.A.
CDU
N.A.
N.A.
Production was not affected by unplanned flaring. The flaring occurred due to surplus pressure on the plant's vapor recovery system. An overnight power outage was due to a transformer failure in a substation. Operations were returned to normal the next day. Flaring beyond permitted levels was reported from the FCCU in the east plant. A crude leak from a pipeline within the refinery was contained. The leak occurred when a piece of equipment struck the line. A malfunctioning FCCU was returned to operation on the afternoon of Sept. 30. The unit is expected to operate at a reduced rate for around two weeks while repairs are completed, the refiner said. Brief maintenance was to be carried out at the No. 1 FCCU. The refiner warned of planned flaring amid maintenance, which has been ongoing since early Sept. N.A. N.A. N.A. N.A. An FCCU was taken offline for around one week of work.
u
4-Oct-10
u
4-Oct-10
u
4-Oct-10
u
4-Oct-10
u
4-Oct-10
p
4-Oct-10
p
4-Oct-10
p p p p p
4-Oct-10 4-Oct-10 4-Oct-10 4-Oct-10 4-Oct-10
*The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported.
u
4-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
HTU
N.A.
N.A.
Hydrobon
N.A.
N.A.
Sulfolane
N.A.
N.A.
DIH
N.A.
N.A.
*The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported.
u
4-Oct-10
u
4-Oct-10
u
4-Oct-10
u
4-Oct-10
Hydrocarbon Publishing Co. Copyright protected. 2008
71
Description of labels Shutdown Region** date
Date of World region shutdown
Restart date
Date of restart
Refiner
City
State
Operator of the refinery at which the shutdown Location of Location of took place refinery refinery
Country
Location of refinery
Refinery capacity
Unit
The type of problem The capacity encountered or of refinery in the unit at which barrels per the problem was day encountered
When a filter is in place, the dropdown arrows and the numbers appear in blue. To unfilter the results, click on the drop-down menu, scroll to the top, and select the (All) option. This will un-filter the column.
Please note: All shutdown and restart dates are considered approximate. Shutdown and restart information is primarily derived from Reuters, Platts, and Bloomsberg newswire services. Refinery and unit capacity figures may be derived from primary source material (stated above) or from Oil and Gas Journal 's a Some capacities for "Unit size" and "Production impact" are not available or not applicable and are therefore designated "N.A."
Unit size, K b/d
The size of the unit affected in thousand barrels per day
Production impact, K b/d
Details
The capacity impact of the shutdown in Further details thousand barrels about the per day shutdown
Planned/unplanned
Whether the shutdown was planned, symbolized by (p), or unplanned, symbolized by (u).
swire services. r from Oil and Gas Journal 's annual Worldwide Refining Survey. re therefore designated "N.A."
If you see no entries after you have applied a filter, scroll to the top.
ies after you e applied a r, scroll to the