Hydraulic Calculations for Date: 26/09/2019 Design Remote area number: Remote area location: Occupancy classification:
Views 76 Downloads 0 File size 667KB
Hydraulic Calculations for
Date: 26/09/2019 Design Remote area number: Remote area location: Occupancy classification: Density: Area of application: Coverage per sprinkler: Type of sprinklers calculated: No. of sprinklers calculated: In rack demand: Hose streams: Total water required (including hose streams): Type of system: Volume of dry or preaction system:
NA NA light hazard NA NA NA Cálculo de GCI 0 NA NA outside + 100gpm inside 250.0 gpm at 138.5 psi [ 17.64 psi safety margin (11.3%) ] wet pipe NA
Water Supply Information Date: NA Location: NA Source: NA Contractor: Under contract with: Ing. Luis De la Cruz Martinez CIP 137691 Name of designer: Ing. Alejandro Chumpitaz CIP 177342 Authority having jurisdiction: Cuerpo Gemeral Bomberos Voluntarios del Perú (CGVBP)
Notes
26/09/2019
Cálculo Red Gabinetes
Page 2
Hydraulic Demand Graph
210
180
Water Source: A) 175 psi Static B) 350 gpm at 139.85 psi
(A)
Demand at Source: C) 250 gpm at 138.5 psi
150 (B)
(C) P S I
120
90
60
30
0 0 50
100
150
200
250 GPM
300
350
report created by the "Simple Hydraulic Calculator" version 2.3.6 from www.igneusinc.com
26/09/2019
Cálculo Red Gabinetes
Page 3
Supply Analysis Node at
Static Pressure [psi]
Residual Pressure [psi]
Flow [gpm]
Available Pressure [psi]
Total Demand [gpm]
Required Pressure [psi]
PUMP
175.0
130.0
400.0
156.14
250.0
138.5
Node Analysis Node Tag
Elev [M]
Type
CGBVP N01 N02 N03 N04 N05 MAN PUMP
15.200 0.000 0.000 0.000 0.000 -4.000 -4.000 -4.000
ref ref ref ref ref ref ref source
Pressure Req Disch Discharge [psi] [gpm] [gpm] 100.000 123.196 124.770 128.417 131.812 313.501 138.436 138.501
250.000
250.000 0.000 0.000 0.000 0.000 0.000 0.000 -250.000
report created by the "Simple Hydraulic Calculator" version 2.3.6 from www.igneusinc.com
26/09/2019
Cálculo Red Gabinetes
Page 4
Pipe Information negative pipe flow (Q) indicates flow is from node 2 towards node 1 Node 1 Pipe Node 2
Elev [M]
CGBVP
15.200
P01 N01
0.000
N04
0.000
MAN
-4.000
MAN
-4.000
PUMP
-4.000
PUMP
-4.000
N05
-4.000
N01
0.000
N02
0.000
N02
0.000
N03
0.000
N03
0.000
N04
0.000
P05
P06
P07
P02
P03
p04
Discharge & Flow K-factor [gpm]
Nom i.d. [in]
Fittings num & length [M]
L [M] F [M] T [M]
material C factor psi/M
Pressure Summary [psi]
q= 250.000 4 Q=-250.000 4.026 q= 0.000
1T=6.100 1E=3.050
15.200 9.150 24.350
S40 C=120 0.065
Pt=100.000 Pe=-21.605 Pf= 1.591 Pv= 0.267 Pt=123.196 V= 1.92m/s
q= 0.000 4 Q=-250.000 4.026 q= 0.000
1E=3.050 1G=0.610 1C=6.710
4.000 10.370 14.370
S40 C=120 0.065
Pt=131.812 Pe= -5.685 Pf= 0.939 Pv= 0.267 Pt=138.436 V= 1.92m/s
q= 0.000 4 Q=-250.000 4.026 q=-250.000
1.000 0.000 1.000
S40 C=120 0.065
Pt=138.436 Pe= 0.000 Pf= 0.065 Pv= 0.267 Pt=138.501 V= 1.92m/s
q=-250.000 4 Q= 0.000 4.026 q= 0.000
0.500 0.000 0.500
S40 C=120 0
Pt=138.501 Pe= 0.000 Pdev=-175.0 psi Pf= 0.000 Pv= 0.000 Pt=313.501 V= 0.00m/s
q= 0.000 4 Q=-250.000 4.06 q= 0.000
1E=4.787 2T=19.148
14.000 23.935 37.935
PVC200 Pt=123.196 Pe= 0.000 C=150 Pf= 1.574 Pv= 0.258 0.042 Pt=124.770 V= 1.89m/s
q= 0.000 4 Q=-250.000 4.06 q= 0.000
1E=4.787 1T=9.574
73.500 14.361 87.861
PVC200 Pt=124.770 Pe= 0.000 C=150 Pf= 3.647 Pv= 0.258 0.042 Pt=128.417 V= 1.89m/s
q= 0.000 4 Q=-250.000 4.06 q= 0.000
3E=14.361 1T=9.574
57.850 23.935 81.785
PVC200 Pt=128.417 Pe= 0.000 C=150 Pf= 3.395 Pv= 0.258 0.042 Pt=131.812 V= 1.89m/s
Material Codes Pipe Material S40 - Schedule 40 Steel PVC200 - PVC C900 Pressure Class 200
C E G T
-
Fittings Check Valve Standard 90 degree elbow Gate Valve Tee - Flow turn 90 degrees
report created by the "Simple Hydraulic Calculator" version 2.3.6 from www.igneusinc.com
Notes
26/09/2019
Cálculo Red Gabinetes
Page 5
Fire Pump in Pipe "P07" 210
180 (A)
Given Values: A) 175 psi at 0.0 gpm B) 400 gpm at 130 psi C) 600 gpm at 84.5 psi
150
Extrapolated: D) 700 gpm at 56.05 psi (B)
P S I
120
90
(C)
(D)
60
30
0 0100
200
300
400
500 GPM
600
700
report created by the "Simple Hydraulic Calculator" version 2.3.6 from www.igneusinc.com