Table A.2 Note: Surface and Hoisting Equipment DS-1 Category 3 is equal to API RP-7G Equipment Category Intermediate
Views 101 Downloads 1 File size 18KB
Table A.2 Note:
Surface and Hoisting Equipment
DS-1 Category 3 is equal to API RP-7G
Equipment Category
Intermediate Inspection frequency
Major Inspection Frequency
Drilling Mast & (Raising Lines) * see note below
1 year
4 years
Relevant Standards
API 9A (Wire) / RB 9B (Care) / API RP 4G / 4F ASTM E165 ASTM E709 Manufacturers Recommendations
Substructure
1 year
4 years
6 months
1year
Crown Block
1 year
3 years
API 8C / RP 8B ASTM E165 ASTM E709 Manufacturers Recommendations
Travelling Block
1 year
3 years
API 8C / RP 8B ASTM E165 ASTM E709 Manufacturers Recommendations
Drilling Hook
6 months
3 years
API 8C / RP 8B ASTM E165 ASTM E709 Manufacturers Recommendations
Links Elevator
6 months
Elevators
6 months
2 years
API 8C / RP 8B ASTM E165 ASTM E709 Manufacturers Recommendations
1 year
4 years
API 7K / RP 7L ASTM E165 Manufacturers Recommendations
Kelly D. Bushing
6 months
1 year
API 7K / RP 7L ASTM E165 ASTM E709 Manufacturers Recommendations
Master Bushing
6 months
1 year
API 7K / RP 7L ASTM E165 Manufacturers Recommendations
Slips
6 months
6 months
API 7K / RP 7L ASTM E709 Manufacturers Recommendations
Spiders
6 months
6 months
API RP 7L ASTM E165 ASTM E709 Manufacturers Recommendations
Safety Clamp
6 months
6 months
API RP 7L ASTM E165 ASTM E709 Manufacturers Recommendations
Tongs
6 months
6 months
API RP 7L ASTM E165 ASTM E709 Manufacturers Recommendations
Kelly Spinner
6 months
1 year
ASTM E165 ASTM E709 Manufacturers Recommendations
Stabbing Board, including Monkey board.
Rotary Table
API RP4G, App A ASTM E165 ASTM E709 ASTM E165
API 8C / RP 8B ASTM E165 ASTM E709 Manufacturers Recommendations
PDF created with FinePrint pdfFactory trial version www.pdffactory.com
Equipment Category
Intermediate Inspection frequency
Major Inspection Frequency
Relevant Standards
Brake Bands & Linkages
6 months or when Blocks changed which ever comes first
1 year after last inspection
API RP 7L ASTM E165 ASTM E709 Manufacturers Recommendations
Dead Line Anchor
6 months
2 years
ASTM E165 ASTM E709 Manufacturers Recommendations
Lifting Plugs
6 months
Air Winches
1 year
1 year
ASTM E165 ASTM E709 PDO ERD 80-01 Manufacturers Recommendations
Swivels
6 months
2 years
API 8C / RP 8B IADC Chpt H Sect 4 ASTM E165 ASTM E709 Manufacturers Recommendations
Spelters
6 months
ASTM E165 ASTM E709 PDO ERD 80-01
Trailer King Pings
6 months
ASTM E165 ASTM E709
Slings & Shackles
6 months
6 months
API RP 9B (Care) / / RP 8B ASTM E165 ASTM E709 PDO ERD 80-01
Personnel Basket
6 months
4 years
ASTM E165 ASTM E709
Cranes (Hook Inspection)
6 months
1 year
ASTM E165 ASTM E709 PDO ERD 80-01 Manufacturers Recommendations
Forklifts (Fork & Forks Support)
6 months
1 year
ASTM E165 ASTM E709 PDO ERD 80-01 Manufacturers Recommendations
ASTM E165 ASTM E709 E709 PDO ERD 80-01 Manufacturers Recommendations
* Note: Raising Lines can be separated from mast inspection. Medium rigs change out as per manufacture recommendations. Heavy rigs should inspect raising lines after each move.
PDF created with FinePrint pdfFactory trial version www.pdffactory.com