Adelanto Por Materiales Corregido

CalculoDescripción completa

Views 150 Downloads 74 File size 277KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

ENTIDAD:

Presup. Ofer.(inc 2,612,918.25 IGV) S/.

OBRA: Fecha Base May-11 INSTALACION DE LINEA DE ADUCCION Y AMPLIACION DE REDES DE DISTRIBUCION DEL P.J. ULIACHIN Y CERCADO CHAUPIMACA DISTRITO DE CHAUPIMARCA-PROVINCIA DE PASCO-DEPARTAMENTO DE PASCO CONTRATISTA: SUPERVISOR:

SOLICITUD DE ADELANTO ESPECIFICO DE MATERIALES N°01 ACTUALIZACION DE MONTOS AL MES DE NOVIEMBRE 2011 CUADRO N°01

IU 03 03 03 03 04 04 04 04 04 21 39 39 39 39 49 49 49 49 72 72 72 72

DESCRIPCIÓN

METRADOS

Tubo Acero para Soldar SCH 40 DN 100MM 61.61 Tubo Acero para Soldar SCH 40 DN 150MM 19.19 Tubo Acero negro Standard Tipo ISO I 2" 16.80 Barreno 4,004.64 Arena Gruesa 345.98 Grava 205.81 Hormigon 391.82 Tierra preparada 2,227.01 Piedra Chancada de 1/2"-3/4" 172.31 Cemento Portland Tipo I (42.5 Kg) 2,837.29 Accesorios diversos 1.00 Herramientas 1.00 Madera para encofrados 947.80 Tripplay Lupuna de 4'x8'x 6 mm 27.28 Compresora Neumatica 93 HP 335-375 PCM 1,289.29 Retroexcavadora C/martillo 80-110H.P. 0.50 1.303,227.34 YD Martillo Neumatico de 29 Kg. 306.51 Equipos Varios 1.00 Tubo PVC Agua A-15 S. presion DN 110 MM X 5M 3,511.03 Tubo PVC UF agua ISO 4422 C-7.5 DN 160 MM 480.26 Tubo PVC agua A-15 S. presion DN 90 MM X 5M2,244.34 Accesorios de PVC 1.00

P.U

PARCIAL

Ima (Mayo11)

Imo (Nov11)

Monto sin IGV S/.

Monto inc I.G.V S/.

75.00 89.00 97.60 45.00 35.00 45.00 40.00 35.00 35.00 18.50 121,221.0 10,723.40 3.25 23.00 112.05 110.00 120.00 58,481.00 25.00 35.13 30.00 37,852.63

4,620.75 1,707.91 1,639.68 90,104.40 12,109.30 9,261.45 15,672.80 78,004.24 6,031.27 52,491.30 60,610.52 10,723.40 3,079.92 627.44 117,657.02 177,503.70 36,781.20 58,481.00 43,887.88 16,871.53 33,665.10 37,852.63

578.14 578.14 578.14 578.14 893.81 893.81 893.81 893.81 893.81 354.74 362.29 362.29 362.29 362.29 240.64 240.64 240.64 240.64 347.56 347.56 347.56 347.56

529.27 529.27 529.27 529.27 883.24 883.24 883.24 883.24 883.24 354.74 370.47 370.47 370.47 370.47 235.99 235.99 235.99 235.99 348.06 348.06 348.06 348.06

5,047.41 1,865.61 1,791.08 98,424.17 12,254.22 9,372.28 15,860.36 78,937.74 6,103.45 52,491.30 59,272.24 10,486.63 3,011.92 613.59 119,975.36 181,001.28 37,505.95 59,633.32 43,824.83 16,847.29 33,616.74 37,798.25

5,955.94 2,201.42 2,113.47 116,140.52 14,459.98 11,059.29 18,715.22 93,146.53 7,202.07 61,939.73 69,941.24 12,374.22 3,554.07 724.04 141,570.92 213,581.51 44,257.02 70,367.32 51,713.30 19,879.80 39,667.75 44,601.94

TOTAL S/.

885,735.02

1,045,167.30

ADELANTO ESPECIFICO DE MATERIALES N°01 CALENDARIO DE ADQUISICION DE MATERIALES INDICE 45

03

04

21

39

47 49

72

MATERIALES

Unidad

Cantidad

MADERA MADERA ENCOFRADOS p2 947.80 MADERA TORNILLO p2 60.74 ANDAMIO DE MADERA p2 135.36 TRIPLAY LUPUNA DE 4'x8'x 6 mm pln 27.28 ACERO ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 158.90 ACERO DE REFUERZO FY=4200 GRADO 60 kg 44.00 ALAMBRE NEGRO N° 16 kg 103.53 ALAMBRE NEGRO Nº 08 kg 33.07 CLAVO CON CABEZA PRECIO PROMEDIO kg 46.30 PERNO ACERO CTE P/BRIDA DN 100 DE 16MMX90/62MM und C/TUERCA 50.00 TUBO ACERO PARA SOLDAR SCH 40 DN 100MMm 61.61 TUBO ACERO PARA SOLDAR SCH 40 DN 150MMm 19.19 TUBO ACERO NEGRO STANDARD TIPO ISO I 2"m 16.80 MARCO Y TAPA F°F° 0.60M P/BUZON pza 51.00 MARCO-TAPA AC.GALV. P/MEDIDOR E=2.0MM 9X11" pza C/SEG 383.00 BARRENO pza 4,004.64 AGREGADO FINO ARENA GRUESA M3 345.98 GRAVA M3 205.81 HORMIGON M3 391.82 TIERRA PREPARADA M3 2,227.01 PIEDRA CHANCADA DE 1/2"-3/4" M3 172.31 PIEDRA 4" - 6" M3 0.81 CEMENTO CEMENTO PORTLAND TIPO I (42.5 kg) bol 2,918.07 YESO EN BOLSA DE 20 KG BL 38.44 INDICE GENERAL DE PRECIOS AL CONSUMIDOR TUBERIAS PVC Y ACCESORIOS glb 1.00 HERRAMIENTAS glb 1.00 MANO DE OBRA (INCLUYE LEYES SOCIALES) MANO DE OBRA (INCLUYE LEYES SOCIALES) glb 427,701.79 MAQUINARIA Y EQUIPO IMPORTADO COMPRESORA NEUMATICA 93 HP 335-375 PCMHm 1,289.29 RETROEXCAVADORA C/MARTILLO 80-110H.P. 0.50 Hm 1.30 YD3,227.34 COMPACTADOR VIBR. TIPO PLANCHA 7 HP Hm 1,157.36 MARTILLO NEUMATICO DE 29 Kg. Hm 306.51 CAMION VOLQUETE 6x4 330 HP 10 M3. Hm 149.86 EQUIPOS VARIOS Hm 1.00 TUBO DE PVC TUBO PVC AGUA A-15 S. PRESION DN 110 MM XM5M 3,511.03 TUBO PVC UF AGUA ISO 4422 C-7.5 DN 160 MM M 480.26 TUBO PVC AGUA A-15 S. PRESION DN 90 MM X M 5M 2,244.34 TUBO PVC AGUA A-15 S. PRESION DN 63 MM X M 5M 1,853.75 TUBO PVC AGUA A-15 S. PRESION DN 200 MM XM5M 25.00 ACCESORIOS DE PVC GLB 1.00 TOTAL MATERIALES ( S/.)

Precio S/.

3.25 4.00 0.98 23.00 2.31 3.08 4.50 4.50 4.50 25.00 75.00 89.00 97.60 424.00 50.00 45.00 35.00 45.00 40.00 35.00 35.00 45.00 18.50 9.50 121,221.04 10,723.40 1.00 112.05 110.00 23.56 120.00 201.93 58,481.00 25.00 35.13 30.00 9.50 35.00 112,059.40

Parcial S/. 4,082.31 3,079.82 242.40 132.65 627.44 231,533.35 372.88 135.52 467.20 148.81 207.80 1,250.00 4,620.75 1,707.91 1,639.68 21,624.00 19,150.00 180,208.80 121,116.30 12,109.64 9,261.01 15,672.96 78,004.84 6,031.27 36.58 54,370.04 53,985.68 384.36 131,944.44 121,221.04 10,723.40 427,701.79 427,701.79 652,231.85 144,480.26 355,007.66 27,283.10 36,764.80 30,215.03 58,481.00 302,530.79 87,775.57 16,870.74 67,330.24 17,619.84 875.00 112,059.40 1,925,510.87

Mes 01 Dic.11 4,082.31 3,079.82 242.40 132.65 627.44 200,321.35 372.88 135.52 467.20 148.81 207.80

Mes 02 Ene.11 0.00

31,212.00 0.00

1,250.00 4,620.75 1,707.91 1,639.68 10,812.00 180,208.80 121,116.30 12,109.64 9,261.01 15,672.96 78,004.84 6,031.27 36.58 27,377.20 26,992.84 384.36 71,333.92 60,610.52 10,723.40 142,567.26 142,567.26 580,600.74 144,480.26 355,007.66 36,764.80 15,107.52 29,240.50 302,530.79 87,775.57 16,870.74 67,330.24 17,619.84 875.00 112,059.40 1,449,929.87

Mes 03 Feb.11 0.00 0

0 0.00 0 0 0 0 0 0 0 0 0

10,812.00 19,150.00 0 0.00

26,992.84 26,992.84 0.00 60,610.52 60,610.52

0.00 0 0 0.00 0

142,567.26 142,567.26 71,631.12

142,567.26 142567.26 0.00

27,283.10

0

15,107.52 29,240.50 0.00

333,013.74

0.00 0

142,567.26

ENTIDAD: OBRA:

Presup. Ofer.(inc IGV) S/.

2,612,918.25

INSTALACION DE LINEA DE ADUCCION Y AMPLIACION DE REDES DE DISTRIBUCION DEL P.J. ULIACHIN Y CERCADO CHAUPIMACA DISTRITO DE CHAUPIMARCA-PROVINCIA DE PASCO-DEPARTAMENTO DE PASCO

Fecha Base

May-11

CONTRATISTA: SUPERVISOR:

CALCULO DE MONTOS MAXIMOS ACTUALIZADOS AL MES DE NOVIEMBRE - 2011 CUADRO N°02 Mmax = CI x Sbo x (Ima / Imo)

IU

03 03 03 03

DESCRIPCIÓN

COEFICIENTE SALDO BRUTO DE DE OBRA S/IGV INCIDENCIA

Tubo Acero para Soldar SCH 40 DN 100MM Tubo Acero para Soldar SCH 40 DN 150MM = 0.063

1,925,510.87

Tubo Acero negro Standard Tipo ISO I 2" Barreno

Ima Mayo- Imo Nov- Monto Máximo 11 11 s/igv

578.14 578.14 578.14 578.14

529.27 529.27 529.27 529.27

893.81 893.81 893.81 893.81 893.81

883.24 883.24 883.24 883.24 883.24

TOTAL 4 4 4 4 4

Grava Hormigon

= 0.067

1,925,510.87

Tierra preparada Piedra Chancada de 1/2"-3/4"

TOTAL 21

1,925,510.87

Cemento Portland Tipo I (42.5 Kg)

354.74

354.74

Monto Solicitado c/IGV

Proceden cia de Otorgamie nto

126,411.36

Si

144,583.10

Si

130,553.12

5,047.41 1,865.61 1,791.08 98,424.17 107,128.27 12,254.22 9,372.28 15,860.36 78,937.74 6,103.45 122,528.05

180,998.02

52,491.30

180,998.02

52,491.30

61,939.73

Si

59,272.24 10,486.63 3,011.92 613.59 73,384.38

86,593.57

Si

469,776.77

Si

155,862.79

Si

132,508.05

132,508.05

Arena Gruesa

Monto s/IGV Solicitado

130,553.12

= 0.094 TOTAL 39 39 39 39

Accesorios diversos Herramientas

= 0.192

1,925,510.87

Madera para encofrados Tripplay Lupuna de 4'x8'x 6 mm

362.29 362.29 362.29 362.29

370.47 370.47 370.47 370.47

TOTAL 49 49 49 49

361,535.13

Compresora Neumatica 93 HP 335-375 PCM Retroexcavadora C/martillo 80-110H.P.=0.50 0.286 1.30 YD 1,925,510.87 Martillo Neumatico de 29 Kg. Equipos Varios

240.64 240.64 240.64 240.64

235.99 235.99 235.99 235.99

347.56 347.56 347.56 347.56

348.06 348.06 348.06 348.06

TOTAL 72 72 72 72

Tubo PVC UF agua ISO 4422 C-7.5 DN 160 MM Accesorios de PVC

TOTAL

561,547.15

561,547.15

Tubo PVC Agua A-15 S. presion DN 110 MM X 5M Tubo PVC agua A-15 S. presion DN 90=MM 0.072 X 5M

361,535.13

1,925,510.87

138,437.63 138,437.63 1,505,579.10

119,975.36 181,001.28 37,505.95 59,633.32 398,115.91 43,824.83 16,847.29 33,616.74 37,798.25 132,087.11 885,735.02

1,045,167.32

ENTIDAD: OBRA:

Presup. Ofer.(inc IGV) S/.

2,612,918.25

INSTALACION DE LINEA DE ADUCCION Y AMPLIACION DE REDES DE DISTRIBUCION DEL P.J. ULIACHIN Y CERCADO CHAUPIMAC DISTRITO DE CHAUPIMARCA-PROVINCIA DE PASCO-DEPARTAMENTO Fecha DE PASCO Base

May-11

CONTRATISTA: SUPERVISOR:

RESUMEN DE ADELANTO ESPECÍFICO DE MATERIALES Nº01 CUADRO N°03 IU 03 04 21 39 49 72

DESCRIPCIÓN Acero de construcción corrugado Agregado fino Cemento Portland Tipo I (42.5 Kg)

Indice General de precios Maquinaria y Equipo Importado Tubo PVC Total solicitado S/.

Monto sin IGV S/.

IGV S/.

Monto inc I.G.V S/.

107,128.27 122,528.05 52,491.30 73,384.38 398,115.91 132,087.11 885,735.02

19,283.09 22,055.05 9,448.43 13,209.19 71,660.86 23,775.68 159,432.30

126,411.36 144,583.10 61,939.73 86,593.57 469,776.77 155,862.79 1,045,167.30

ENTIDAD: OBRA:

Presup. Ofer.(inc IGV) S/. Contrato Nº

2,612,918.25

INSTALACION DE LINEA DE ADUCCION Y AMPLIACION DE REDES DE DISTRIBUCION DEL P.J. ULIACHIN Y CERCADO CHAUPIMA DISTRITO DE CHAUPIMARCA-PROVINCIA DE PASCO-DEPARTAMENTO DE PASCO

CONTRATISTA:

May-11

Fecha Base

SUPERVISOR:

1. DATOS ADELANTO ESPECIFICO DE MATERIALES Nº 01 4 (AGREGADO FINO)

INDICE UNIFICADO

2. MONTO SOLICITADO DEL ADELANTO ESPECIFICO IU 4 4 4 4 4 TOTAL S/.

DESCRIPCIÓN

UND

Arena Gruesa m3 Grava m3 Hormigon m3 Tierra preparada m3 Piedra Chancada de 1/2"-3/4" m3

P.U

METRADO

Ima

Imo

35.00

345.98

893.81

883.24

12,254.22

45.00

205.81

893.81

883.24

9,372.28

40.00

391.82

893.81

883.24

15,860.36

35.00

2,227.01

893.81

883.24

78,878.15

35.00

172.31

893.81

883.24

6,103.02 122,468.03

3. VERIFICACIÓN DE PROCEDENCIA DEL ADELANTO A máx :

[ Ci* p%*Sbo- (Aoto-Aomo)]*Ima/Imo

S/.

A máx: Monto Máximo del Adelanto a otorgar por el mismo Material Ci : Coeficiente de incidencia del material en la Fórmula Polinomica p%: Porcentaje de incidencia Sbo : Saldo Bruto de Obra por valorizar en el instante de hacerse efectivo el Adelanto Aoto: Adelanto otorgados por el mismo material Aomo: Adelantos amortizados para el mismo material Ima: Indice de Precio del material a la fecha efectiva del adelanto (Noviembre 2011) Imo: Indice de Precio del material a la fecha del presupuesto Base (Mayo 2011) MONTO SOLICITADO (sin IGV)