8 Vessel Upending Techniques for Lift Planners & Rigging Engineers Posted by Zack Parnell on Apr 8, 2015 12:30:00 PM

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

1/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Tweet

4

Share

43

Like

Share

7

0

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

2/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

When upending a vessel or similar load, there are a number of options commonly available. A lift planner or rigging engineer must decide how best to lift the head of the load as well as the tail.  The head can be lifted with cranes (various types), strand jacks, gantries (telescoping and fixed), climbing jack systems and so on. Similarly, tailing options include nearly all of the above, as well as trailers and skid mounted tilt-up frames. Any time multiple cranes (or load handling equipment) are used to lift a load, the planning and operation becomes more involved as the likelihood for human and equipment error is increased with additional people and equipment involved.  "Vessel Upending Techniques" is a lesson that reviews 8 proven upending options available to lift planners and rigging engineers. This one-hour lesson can be found in the Fundamentals of Rigging Engineering Program and is taught online by Keith Anderson, Chief Rigging Engineer for Bechtel Corporation, Engineering News Record's #1 Contractor on the 2014 Top 400 list.  Mr. Anderson also serves as Program Manager for the ITI Rigging Engineering Program and instructs dozens of lessons throughout the 10 available Courses in the Program. Mr. Anderson and ITI are in the process of finalizing accreditation for this Program with ASME and LEEA.   In this article, for the sake of time, we will dive into 3 of the upending techniques, looking at Advantages and Disadvantages. The remaining 5 techniques are described with images.

8 Vessel Upending Techniques

Crawler Crane Tailing Advantages Simplicity of coordination and signaling. Loads are all in the same plane as both booms. Disadvantages Need extended matting or prepared ground for tailing crane. May need to offload the vessel before positioning tailing crane as it could be diffiult to remove trailer with tailing http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

3/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

crane in place. If you don’t get the set-up quite right, the tail crane radius may swing out as the load comes clear and the suspensions adjust.

Crane on Outrigger Tailing Advantages Quick and easy setup. Minimal matting. Likely to be cheaper for a one-off operation than bringing in a crawler crane. Disadvantages This is only approporiate when the required tail movement (and load) is small enough to be accommodated by the swing motion of an economically available (and physically small enough) telescopic crane.  Not likely to be economic when large tail radii are required.

Tailing with Head Crane Advantages Tail crane only has to hold the tail. Tail radius is minimal, so the tail crane can be minimized. Minimal matting is required. Makes best use of the head crane and keeps the costs down. Disadvantages It may be difficult to remove “conventional” trailers unless the vessel is delivered beforehand and offloaded onto temporary supports. If a main lift crane using a Superlift tray is used  you cannot swing the head anywhere until the head crane has the entire weight at the completion of upending and the Superlift tray lifts clear of the ground. This is not an issue if you don’t need Superlift or use a Superlift bogie, ring crane or similar. http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

4/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

As discussed, the remaining 5 techniques Mr. Anderson reviews are below.

Tailing with Tilt-Up Frame

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

5/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Lift System with Crawler Crane http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

6/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Lift System with Cross Slide

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

7/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Lift System with Trailer

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

8/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Strand Jack with Trailer http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

9/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

If you'd like to learn more about this lesson and others in the Fundamentals of Rigging Engineering Program, you can Demo the Online Program and receive the Program Outline.

Take me to the demo About The Fundamentals of Rigging Engineering Program

Fundamentals of Rigging Engineering is ideal for lift planners, rigging engineers, and other key personnel http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

10/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

who plan, execute, and oversee crane and rigging activities. To learn more, visit riggingengineering.com or call Christina Lanham, ITI Manager of E-Learning at 800-727-6355. Topics: Fundamentals of Rigging Engineering

troy davis 10/4/2015 16:10:22 Interesting Reply to troy davis First Name *

Last Name

Email *

Website

Comment *

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

11/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Subscribe to follow-up comments for this post

Introduzca el texto

Submit Comment

Subscribe to Email Updates Email *

Notification Frequency *

Instant Subscribe

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

12/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

Subscribe to our Crane & Rigging Blog with your email address 

Subscribe

SITE MAP ABOUT TRAINING FIELD SERVICES BOOKSTORE E-LEARNING WORKSHOPS NEWS CONTACT CAREERS MISSION STATEMENT

INDUSTRIES WE SERVE POWER GENERATION OIL & GAS CONSTRUCTION HEAVY LIFT & TRANSPORT MANUFACTURING UTILITIES DEFENSE DEPARTMENTS

LEARN ABOUT OUR TRAINING http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

13/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

CRANES RIGGING LIFT PLANNING ENGINEERING

SOCIALIZE

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

14/15

26/6/2015

8 Vessel Upending Techniques for Lift Planners & Rigging Engineers

CRANES

RIGGING

LIFT PLANNING

ENGINEERING

© 2015 Industrial Training International, Inc.

http://www.iti.com/crane­and­rigging­success/8­vessel­upending­techniques­for­lift­planners­rigging­engineers

15/15