18002-INT-FQE-CL-ECI-001-0 - Checklist - Earthing Conductor

EARTHING CONDUCTOR Checklist 18002-INT-FQE-CL-ECI-001-0 Sub contractor: Sl.No Location Date Status Yes No Description

Views 104 Downloads 0 File size 142KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

EARTHING CONDUCTOR Checklist 18002-INT-FQE-CL-ECI-001-0 Sub contractor: Sl.No

Location Date Status Yes No

Description

Remarks

Ensure earthing conductor laid as per the approved earthing layout drawing. Ensure proper exothermic weld done as per the approved 2 method statement. 3 Ensure that welded joints are applied with bitumen paint. Weather proofing membrane done after applying bituminous 4 paint. 5 Proper backfilling done after laying of earth mat. 6 Earth pits installed as per the approved earthing drawing. Ensure that the earthing links are properly connected and 7 tightened Check the completion of masonry work and fixing of cover on pit 8 and identification Check for Tightness of all connection & proper provision for test 9 links 10 Ensure that the connected grid value is as per Specification 1

Remarks Sub con/ EPC con/EPC

Sub Quality EPC

Client