Accredited for compliance with ISO/ IEC 17025 Facility No. 19159

Komp. Bintang Industrial Park 1, Lot No. 27 – 28, Batu Ampar, Batam, Indonesia – 29457 Ph : +62 778 413 007 Fax : +62 778 413 017

MAGNETIC PARTICLE INSPECTION REPORT CONTRACTOR

:

PT. REKAYASA INDUSTRI

REPORT NO.

:

PTLA/MT/020

PROJECT

:

PROVISION OF 16” OFFSHORE SECTIONAL PIPE LINE RELOCATION AND INSTALATION

CONTRACT/ JOB NO

:

-

LOCATION

:

WORKSHOP PT. LOUIS ALAIN

TEST DATE

:

17 July 2014

SPECIFICATION:

ACCEPTANCE CRITERIA:

PROCEDURE NO:

API 1104 Rev. 2010

API 1104 Rev. 2010 SECT. 9.4

NDT-OPR-004 / 2:0 NDT-TEC-M002 REV . 1

SPECIMENT DATA MATERIAL

: API 5L X52

DRAWING NO.

: N/A

TESTING TEMPERATURE

: AMBIENT

WELDING PROCESS

: N/A

SURFACE CONDITION

: AS SMOOTH

WELD PREPARATION

: N/A

MATERIAL DIMENTION

: Ø 16 “ X THK = 12.7 mm

REQUEST FOR INSPECTION (RFI) NO.: PTLA/REKAYASA/MT-0022014

MPI DATA: EQUIPMENT USED

: AC YOKE

CONTRAST PAINT

SERIAL NUMBER

: 8820

CALIBRATION

: 10 LBS

CURRENT

: 220 – 240 V

ILLUMINATION

: DAY LIGHT

SENSITIVITY

: BURMAH CASTROL

BATCH NO.

: MAGNAFLUX – WCP 2 : 13H16K

MAGNETIC (POWDER / INK) : MAGNAFLUX – 7HF BATCH NO. INSPECTION METHODS

: 13H11K :

DRY

 WET

 CONTINUOS

RESIDUAL

RESULT:

Note:

IDENTIFICATION

JOINT NUMBER

WELDER

DIMENTION

MPI TEST COUPON 1

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 2

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 3

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 4

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 5

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 6

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 7

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



MPI TEST COUPON 8

1.0 ML/WPS/REK/X52/2014

-

Ø 16 “ X THK = 12.7 mm



C = Comply

C

RESULT DNC

DNC = Does Not Comply

REMARKS/ TEST RESTRICTIONS: MPI WAS CARIED OUT 100 % ON BEVEL SURFACE AREA NO RELEVANT INDICATION WAS FOUND DURING TIME OF INSPECTION

TECHNICIANS

VERIFIED BY: (SITE SUPERVISOR)

Name : ANDREW JORDAN Qualification: MT PCN II Date : 17 July 2014

Name : ANDREW JORDAN Qualification: MT PCN II Date : 17 July 2014

CONTRACTOR'S REP:

Name : Date :

Page 1 of 1

COMPANY OWNER REP:

Name : Date :

3rd PARTY (where applicable)

Name : Date :

NDT-FRM-006 Issued 3 Rev. 0

Accredited for compliance with ISO/ IEC 17025 Facility No. 19159 "This report signifies acceptancePark or otherwise the acceptance criteria of the applicable standard. Such compliance, or otherwise, does not infer or imply suitability and/or Komp. Bintang Industrial 1, Lotwith No.regard 27 – only 28, toBatu fitness for any particular use or purpose. No other communication by Oceaneering, whether oral or written, shall be construed as an opinion as to whether the weld or other work inspected Ampar, Batam, Indonesia – 29457 should be accepted or rejected." Ph : +62 778 413 007 Fax : +62 778 413 017

Page 2 of 1

NDT-FRM-006 Issued 3 Rev. 0

Accredited for compliance with ISO/ IEC 17025 Facility No. 19159

Komp. Bintang Industrial Park 1, Lot No. 27 – 28, Batu Ampar, Batam, Indonesia – 29457 Ph : +62 778 413 007 Fax : +62 778 413 017

MAGNETIC PARTICLE INSPECTION REPORT CONTRACTOR

:

     

REPORT NO.

:

     

PROJECT

:

     

CONTRACT/ JOB NO

:

     

TEST DATE

:

     

LOCATION :       SKETCH/ PHOTOGRAPH:      

TECHNICIANS

Name :       Qualification:       Date :      

VERIFIED BY: (SITE SUPERVISOR)

Name :       Qualification:       Date :      

CONTRACTOR'S REP:

Name :       Date :      

Page 3 of 1

COMPANY OWNER REP:

Name :       Date :      

3rd PARTY (where applicable)

Name :       Date :      

NDT-FRM-006 Issued 3 Rev. 0