CAPACITY VERIFICATION 1 Part Number 4 Run@Rate 2 Part Description 5 Supplier Name 3 TRW Annual Capacity Planning
Views 83 Downloads 0 File size 188KB
CAPACITY VERIFICATION 1
Part Number
4 Run@Rate
2
Part Description
5 Supplier
Name
3
TRW Annual Capacity Planning Volume
6 Supplier
Location
Process Step Process Description Units hours shifts days weeks hours
7
II - Supplier Capacity Data
I - Supplier Working Standards
8 9 10 11 12 13 14 15 16 17 18 19 20 21
III - RUN at RATE Results
22 23 24 25 26 27 28 29
pcs/year
Working hours/shift Shifts/ day Days/ week Weeks/ year Total hours/year (9*10*11*12)
% of line for TRW parts (Allocation %) - See Example Quoted Production Rate (part # item 1) Quoted % scrap Quoted % line efficiency Adjusted production rate (15*(1-16)*17) Available capacity (15*14*(1-16)*17)*13 Utilization % (3/19) Bottleneck operation
% pcs/hour % % pcs/hour pcs/year % X
Trial run duration Total parts produced Number of bad parts First time capability % ((23-24)/23)*100 Number of good parts (23-24) Net output (26/22) Takt Time Rate (Target) (3/13*14) Downtime
hour pcs pcs % pcs pcs/ hour pcs/ hour hour
Reason
text
Run-Off utilization % (3/(27*13*14)) Bottleneck operation
% X
STEP 1
STEP 2
Date
STEP 3
STEP 4
STEP 5
STEP 6
30 31 32
0.0% X
0.0% X
0.0% X 34 SUMMARY
SHADED CELLS ARE CALCULATED and protected
The RUN@RATE results are acceptable and meet TRW capacity planning volume requirements: The attached capability study results meet TRW requirements:
33
36
Corrective actions are required:
Date:
New production readiness trial run is required:
Date:
Supplier representative signature:
Date: 03 Sep 2005 Rev: D Doc No: D_020_4_12 Page 1 of 7
Overall Process Utilization % 0.00%
0.0% X
0.0% X 35
Status Acceptable
Auditor Information Name: Company: Location:
Auditor signature:
53123415.xls; Run at Rate Form
Process Owner / Department: K. Gillis / Supplier Development Approved By: E. Carpenter / VP Purchasing
0.0% X
CAPACITY VERIFICATION 1
Part Number
30301458B
4 Run@Rate
2
Part Description
Inflator retainer bracket
5 Supplier
Name
3
TRW Annual Capacity Planning Volume
pcs/year
6 Supplier
Location
STEP 1 Process Step Stamp Part Process Description Units This is the actual time spent producing hours product and should 7.5 shifts exclude such things as 3 meals, days breaks, 5 preventative weeks maintainance etc. 48 hours 5400
7
II - Supplier Capacity Data
I - Supplier Working Standards
8 9 10 11 12 13 14 15 16 17 18 19 20 21
III - RUN@RATE Results
22 23 24 25 26 27 28 29
700,000
Working hours/shift Shifts/ day Days/ week Weeks/ year Total hours/year (9*10*11*12)
STEP 2 CNC #1
Date
February 14, 2004 Acme Machining Cleveland, OH
STEP 3 CNC #2
STEP 4 Weld Fasteners
STEP 5 Paint
STEP 6
8.5 2 5 48 4080
7.0 3 5 48 5040
7.0 3 5 48 5040
10.5 1 5 48 2520
% of line for TRW parts (Allocation %) - See Example Quoted Production Rate (part # item 1) Quoted % scrap Quoted % line efficiency Adjusted production rate (15*(1-16)*17) Available capacity (15*14*(1-16)*17)*13 Utilization % (3/19) Bottleneck operation
% pcs/hour % % pcs/hour pcs/year % X
100% 720.0 2% 97% 684 3,695,933 19%
87% 210.0 2% 94% 193 686,677 102% X
100% 164.0 5% 95% 148 745,970 94%
100% 240.0 9% 92% 201 1,012,677 69%
50% 1200.0 5% 95% 1,083 1,364,580 51%
Trial run duration Total parts produced Number of bad parts First time capability % ((23-24)/23)*100 Number of good parts (23-24) Net output (26/22) Takt Time Rate (Target) (3/13*14) Downtime
hour pcs pcs % pcs pcs/ hour pcs/ hour hour
2.00 929 5 99.46% 924 462 130
1.00 249 2 99.20% 247 247 197 0.5
2.00 290 4 98.62% 286 143 139
1.25 252 12 95.24% 240 192 139
1.00 794 4 99.50% 790 790 556
Reason
text
Run-Off utilization % (3/(27*13*14)) Bottleneck operation
% X
72.3%
70.3%
Reprogramming
30 31 32
28.1%
79.8%
SHADED CELLS ARE CALCULATED and protected
34
The RUN@RATE results are acceptable and meet TRW capacity planning volume requirements: YES 33
36
Date: 03 Sep 2005 Rev: D Doc No: D_020_4_12 Page 2 of 7
The attached capability study results meet TRW requirements: NO Corrective actions are required: NO
Date:
April 1, 2404
New production readiness trial run is required: NO
Date:
May 16, 2004
Supplier representative signature:
Tom Alison
53123415.xls; Run at Rate Form Example
97.1% X SUMMARY
35
Overall Process Utilization %
Status
97.13%
Acceptable with Caution
Auditor signature:
Auditor Information Name: Gerald Biggs Company: TRW Location: Mesa, AZ
Gerald Biggs
Process Owner / Department: K. Gillis / Supplier Development Approved by: E. Carpenter / VP Purchasing
0.0%
RUN AT RATE ACTION PLAN ITEM
STANDARD CHECKLIST ITEMS
1
ARE ALL TOOLING GAGES AND FIXTURES IN PLACE?
2
IS A MANUFACTURING FLOOR PLAN DEVELOPED?
3
ARE ALL PACKAGING REQUIREMENTS MET?
4
IS PREVENTATIVE MAINTENANCE IN PLACE?
5
IS MISTAKE PROOFING ACCEPTABLE?
6
ARE BOTH THE SUPPLIER AND RUN-OFF UTILIZATIONS