ITEM 1 1.01
DESCRIPCION
FECHA
und.
MET
12/02/2019
P-U
PARCIAL S/.
OBRAS PRELIMINARES MOVIMIENTO DE TIERRAS
1.01.01
ESCAVACION PARA ZAPATA TERRENO NATURAL
m3
25.55
35.00
894.25
1.01.02
ESCAVACION PARA CIMENTACION TERRENO NATURAL
m3
15.06
35.00
527.10
EXCAVACION VIGA CIMENTACION TERRENO NATURAL
M3
0.84
35.00
29.40
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km
M3
49.75
40.00
1,990.00
1.01.03 2 2.01
CONCRETO ARMADO ZAPATA
2.01.01
CONCRETO EN ZAPATAS FC=210KG/CM2
m3
10.95
380.00
4,161.00
2.01.02
ACERO
KG
224.80
4.90
1,101.52
2.01.03
SOLADO PARA ZAPATA
m3
0.65
240.00
156.00
2.02
VIGAS DE CIMENTACION
2.02.01
CONCRETO EN ZAPATAS FC=210KG/CM2
m3
1.58
320.00
505.60
2.02.02
ACERO
KG
250.52
4.80
1,202.50
2.02.03
SOLADO PARA VIGA CIMENTACION
m3
0.35
240.00
84.00
ENCONFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
12.62
32.00
403.84
4.90
7,252.00
2.02.04 2.3
COLUMNAS
2.03.01
ACERO DE REFUERZO Fy=4200KG/CM2, GRADO 60 PARA COLUMNAS
kg
1,480.00
2.03.02
ENCONFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
m2
98.40
35.00
3,444.00
2.03.03
CONCRETO EN COLUMNAS FC=210KG/CM2
m3
6.89
380.00
2,618.20
39.16
32.00
1,253.12
952.45
4.80
4,571.76
8.20
380.00
3,116.00
149.00
37.10
5,527.90
2.4
VIGAS
2.04.01
ENCONFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
2.04.02
ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 PARA VIGAS
kg
2.04.03
CONCRETO F/C=210KG/CM2 EN VIGAS
m3
2.5 2.05.01 2.05.02
LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
m2
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
und.
2.05.03
ACERO FY=4200KG/CM2 GRADO 60 PARA LOSA ALIGERADA
2.05.04
CONCRETO EN LOSAS ALIGERADAS FC=210KG/CM2
1,341.00
2.24
3,003.84
kg
648.00
4.90
3,175.20
m3
19.40
380.00
7,372.00
M2
194.20
64.00
12,428.80
3.00
ALBAÑILERIA - MURO
3.01
MURO DE LADRILLO KK 18 HCOS - SOGA
4.00
PISO Y PAVIMENTOS
4.01
FALSO PISO DE CONCRETO FROTACHADO E=4" EN 1ER PISO
M2
74.00
46.00
3,404.00
4.02
SOBREPISO e=2" FROTACHADO EN 2DO PISO
M2
68.00
36.00
2,448.00
5.00
MUROS DE CONCRETO ARMADO
5.01
ENCONFRADO Y DESENCOFRADO NORMAL EN VIGAS
m2
128.00
35.00
4,480.00
PRESUPUESTO - OBRAS CIVILES OBRA
: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR
MODALIDAD: : A TODO COSTO CLIENTE
GINA MARTEL OSORIO
LUGAR
VILLA MARIA DEL TRIUNFO -LIMA
ITEM 5.02
DESCRIPCION ACERO CORRUGADO FY=4200KG/CM2 GRADO 60 PARA VIGAS
5.03
CONCRETO F/C=210KG/CM2 EN VIGAS
5.00
INSTALACIONES ELECTRICAS
5.01
FECHA
und. kg
MET
12/02/2019
P-U
PARCIAL S/.
840.20
4.90
4,116.98
m3
11.46
380.00
4,354.80
TABLERO METALICO
Und.
2.00
280.00
560.00
5.02
SALIDA DE TECHO CON CAJA METALICA PESADA
PTO
22.00
60.00
1,320.00
5.03
SALIDA PARA TOMACORRIENTES
PTO
23.00
60.00
1,380.00
5.04
SALIDA PARA INTERRUPTORES
PTO
16.00
60.00
960.00
5.05
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
ML
60.00
6.00
360.00
6.00
SISTEMA DE DESAGUE
6.01
CAJAS DE DESAGUE
Und.
1.00
120.00
120.00
6.02
SALIDAS DE PVC SAL PARA DESAGUE DE 2"
pto
12.00
55.00
660.00
6.03
SALIDAS DE PVC SAL PARA DESAGUE DE 4"
pto
10.00
65.00
650.00
6.05
TUBERIA DE PVC SAL 2"
m
30.00
12.00
360.00
m
30.00
18.00
540.00
6.06
TUBERIA DE PVC SAL 4"
7.00
SISTEMA DE AGUA
7.01
VALVULA DE 3/4"
Und.
2.00
140.00
280.00
7.02
VALVULA DE 1/2"
Und.
5.00
120.00
600.00
7.04
RED DE AGUA 1/2"
ML
25.00
8.00
200.00
7.06
SALIDA DE AGUA 1/2"
PTO
14.00
60.00
840.00
7.07
SALIDA DE AGUA CALIENTE 1/2"
PTO
7.00
70.00
490.00
7.08
RED DE AGUA CALIENTE 1/2"
ML
35.00
10.00
350.00
COSTO DIRECTO EN SOLES ( NO INCLUYE IGV) VALIDEZ DE OFERTA TIEMPO DE EJECUCION FORMA DE PAGO
15 DIAS 45 DIAS 50% A LA FIRMA DEL CONTRATO 50 % POR VALORIZACION SEMANAL GARANTIA 7 AÑOS PERSONAL DE CONTACTO GRABIEL SANCHEZ/ 995084708-998845436 EL PERSONAL QUE PARTICIPA EN LAS ACTIVIDADES CUENTA CON EPP Y SCTR. EL PRESUPUESTO SE ELABORO TENIENDO EN CUENTA LAS CARACTERISTICAS FISICAS EXISTENTES.
NOTA: 1. El presupuesto que se adjunta contempla la construccion de Sotano y 1er Piso, teniendo en cuenta los planos proporcionados. no se considera acabados. (tarrajeo, puertas, ventanas, otros). 2. No se considera corte de terreno, no hay plano de corte y por las fotos evidencia que si habra corte y nivelacion de terreno. 3. El precio de excavacion es en terreno natural, de existir roca se tendra que modificar el precio 4. No se considera acarreo de materiales mayores a 20m de distancia. 5. El presupuesto esta calculado a todo Costo (materiales y mano de Obra), si se quiere desagregar la mano de Obra asciende al 50% del Total.
TOTAL S/.
3,440.75
5,418.52
2,195.94
13,314.20
8,940.88
19,078.94
12,428.80
5,852.00
12,951.78
TOTAL S/.
4,580.00
2,330.00
1,920.00
92,451.81