Monitor the Construction Status of Piping Interface

Measuring the Piping Progress   Dia Inch unit of Measure is used to measure the progress of the Piping. The weld join

Views 135 Downloads 0 File size 469KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Measuring the Piping Progress  

Dia Inch unit of Measure is used to measure the progress of the Piping. The weld joint of the pipe size is converted to the equivalent Dia Inch of welding

Examples: 1. One welding joint of 8 inch diameter pipe = 8 Dia Inch 2. Two welding joints of 12 inch diameter pipe = 24 Dia Inch

Measuring the Piping Progress

Welding Control System- WCS   

UO1 Contractor (GS) using WCS to monitor the dia inch of all piping works at Shop as well as field. WCS shall be updated on daily basis by contractor. Status of individual line by service, area etc., shall be checked in WCS database and it shall be saved in excel sheet. Below table (excel) is extracted from WCS. Total Dia-Inch Welded Dia

Ratio

Shop Total Shop Welded Field Total Dia-inch Dia-Inch Dia-Inch

Field Welded Dia-Inch

Area

Service

UGC340

OWS

2272

848

37.3

650

550

1622

298

N200

UA

5313.5

2420

45.5

822.75

734

4490.75

1686

N100

LS

11220

4276.25

38.1

5543.25

4266.25

5676.75

10

N200

EL1

2668

1509

56.6

586

561

2082

948

N200

HS

20463.5

7717

37.7

7615

6811

12848.5

906

N100

FG

2943

1113

37.8

1029

981

1914

132

N100

N

1239

444

35.8

396

348

843

96

S330

LC

551.25

0

0

0

0

551.25

0

Total Piping (AG/UG) Construction Status DESCRIPTION

TOTAL DIA-INCH

THIS WEEKLY

THIS MONTH

JOINTS

DIA-INCH

JOINTS

DIA-INCH

TOTAL JOINTS DONE

TOTAL WELDED DIA-ICH

BALANCE DIAINCH

PROGRESS (%)

SHOP

23,057.50

0

0

2

4.00

1,410

17,931.00

5,126.50

77.77%

FIELD

108,889.00

109

1,348

452

4,875.00

3,848

56,049.50

52,839.50

51.47%

131,946.50

109

1,348.00

454

4,879.00

5,258

73,980.50

57,966.00

56.07%

SHOP

115,136.00

109

1,215

617

6,651.00

7,915

78,622.00

36,514.00

68.29%

FIELD

299,991.00

270

2,519

1,214

10,382.00

6,934

58,224.00

241,767.00

19.41%

Sub-TOTAL

415,127.00

379

3,734.00

1,831

17,033.00

14,849

136,846.00

278,281.00

32.96%

SHOP

51,641.00

67

375

353

1,255.00

5,039

35,098.50

16,542.50

67.97%

FIELD

136,284.00

218

1,012

776

4,220.00

6,213

41,900.00

94,384.00

30.74%

Sub-TOTAL

187,925.00

285

1,387.00

1,129

5,475.00

11,252

76,998.50

110,926.50

40.97%

SHOP

60,881.00

14

154

253

1,310.75

2,305

16,358.00

44,523.00

26.87%

FIELD

103,656.00

15

57

90

770.00

466

4,046.00

99,610.00

3.90%

Sub-TOTAL

164,537.00

29

210.75

343

2,080.75

2,771

20,404.00

144,133.00

12.40%

A/G TOTAL

767,589.00

693

5,331.75

3,303.00

24,588.75

28,872.00

234,248.50

533,340.50

30.52%

GRAND TOTAL

899,535.50

802

6,679.75

3,757

29,467.75

34,130

308,229.00

591,306.50

34.27%

UG PIPING WORK (RAYMOND) U/G TOTAL SMP-4 PIPING WORK (DAEAH)

SMP-5 PIPING WORK (GS DIRECT)

SMP-6 PIPING WORK (AL-GHAMDI)

Interface Test Package - ITP Each Interface Test Package (ITP) between Contractors will be identified by unique ITP number. Only one unique ITP will be assigned for verification of related activity to close interface point. The minimum document to close interface point shall be included in ITP. In some case, one ITP can cover multi-ful IPs.

Interface Test Package - ITP Issued Interface PKG numbers shall not be reused or reassigned. IPs shall be numbered according to the following format.

Interface Test Package - ITP The IP package including inspection reports approved by Company required from Contractor A&B is as follows,

Monitor The Construction Status of Piping.   

WCS status Total Piping Construction status Interface Test Package (ITP) status

All the above status must be known before proceeding with hydrotest/pneumatic of piping. Same time Company can check, whether contractor can meet the IP testing schedule or not. All the above information's shall be provided by Contractor to Company on weekly/daily basis.