INSPECTION AND TEST PLAN STEEL STRUCTURE "R" = REVIEW AND COMMENT QUALITY ACTIVITY/PROCESS DESCRIPTION CONTROL ACTIVITY
Views 121 Downloads 1 File size 329KB
INSPECTION AND TEST PLAN STEEL STRUCTURE
"R" = REVIEW AND COMMENT QUALITY ACTIVITY/PROCESS DESCRIPTION CONTROL ACTIVITY
DISCIPLINE ITP N
"A" = APPROVAL DOCUMENT
1.
ALL
=
PP-0512-GN-GG-004-0
"I" = INFORMATION
INSPECTION ACTIVITIES
QUALITY CONTROL PROCEDURE REFERENCE
ACCEPTANCE CRITERIA
VERIFYING DOCUMENT
Verify
Contract Document
Contract Document
Verify
Standard & Code
Verify
TJE
CPI
OTHERS
Contract Documents
R
A
N/A
Procedure and vendor manual
Contract Documents
R
R/A
N/A
Technical Specification & Proc., Contract Documents
Approval sheet
Contract Documents
R
R/A
N/A
Verify
Technical Specification & Proc., Contract Documents
A36 or eq
IR-009
R
R
N/A
DOCUMENT REVIEW
1.1.
Contract Documents, Tech. Specification, Procedures Review
1.2.
Review Client's or Owners approved technical specification, project procedures, vendor manual, drawings or other documents as the reference to be followed
1.3.
=
Finalise deviation, amendments or queries and generate new procedure as required
2.
STRUCTURAL STEEL WORK
2.1.
Material verification; visual
2.2.
Anchor bolt alignment / center line verification
Visual Inspection
Technical Specification & Proc., Contract Documents
AISC-ASD
IR-009
SW
R
N/A
2.3.
Padding plate elevation check
Visual Inspection
Technical Specification & Proc., Contract Documents
AISC-ASD
IR-009
SW
R
N/A
2.4.
Alignment check / Verticality
Visual Inspection
Technical Specification & Proc., Contract Documents
SP-CI-SS-001
IR-009
SW
R
N/A
2.5.
Bolt Tightening check
Visual Inspection
Technical Specification & Proc., Contract Documents
AISC-ASD
IR-009
SW
R
N/A
2.6.
Grouting ( Follow ITP Grouting)
Visual Inspection
Technical Specification & Proc., Contract Documents
AWS D1.1
IR-009
SW
R
N/A
3.
3.1.
WELDING ACTIVITY
Welding Visual inspection
INSPECTION AND TEST PLAN STEEL STRUCTURE
"R" = REVIEW AND COMMENT QUALITY ACTIVITY/PROCESS DESCRIPTION CONTROL ACTIVITY
DISCIPLINE ITP N
"A" = APPROVAL DOCUMENT
4.
=
ALL
=
PP-0512-GN-GG-004-0
"I" = INFORMATION QUALITY CONTROL PROCEDURE REFERENCE
INSPECTION ACTIVITIES
ACCEPTANCE CRITERIA
VERIFYING DOCUMENT
TJE
CPI
OTHERS
PAINTING WORK
4.1.
Surface preparation ( check surface material )
Visual Inspection
Project Specification, Vendor Manual
Project Specification SP-MEME-025, SSPC
IR-006
W
SW
N/A
4.2.
Check DFT and visual appearance
Visual Inspection
Project Specification SP-MEME-025, Vendor Manual
Primer, second and finish coat
IR-006
W
SW
N/A
Visual Inspection
Technical Specification & Proc., Contract Documents
Approved drawing
PL-008
W
W
N/A
Verify
Contract Documents Site Instruction Form Scope of Work
Approved Documents
Turn-over Documents
P/R
R/A
N/A
TING 5.
FINAL INSPECTION AND PUNCH LISTING
6.
DOCUMENTATION
6.1
QA/QC Review of site generated handover document