Installation qualification protocol for air handling unit & air distribution system OBJECTIVE The objective of
Views 61 Downloads 1 File size 340KB
Installation qualification protocol for air handling unit & air distribution system
OBJECTIVE The objective of this protocol is to provide an outline for the inspection of static attributes, written procedure and guidelines and respective acceptance criteria for the Installation and Operational Qualification of Air handling unit . The Air-Handling unit caters to:-
AREA DETAILS
Sr. No
Name of the area
Area (SQFT)
Height (FT)
Installation Qualification
Each installed components and sub component complies with the engineering design and manufacture recommendations. To ensure that appropriate interconnections are made for utilities / equipment that all the features are defined before the start up of operational qualification. The system meets the current good manufacturing practice requirements. To prepare tentative standard operating procedures. Calibration of instruments Functional keys. Design parameters Alarms & interlock systems Verification of standard operating procedures. Sequential operation Effect of power failure on the equipment SYSTEM / EQUIPMENT DESCRIPTION The Air Handling unit is designed to provide and maintain the following conditions in the area where it caters AHU Capacity of air filtration – __________ CFM. Temperature — NMT 25 ºC RH — NMT 60 % Description: Air handling unit is a recirculation system, in double skin modular construction. AHU will have extruded aluminium frame with sandwiched panel of G.I. sheet duly pre coated from outside & 43 mm thick PUF filled in between. Fresh air enters through 10µ fresh air filter. Air then passes through mixing section with (10 +5) µ pre-filter, 6 rows deep chilled water coil (CH W) coil & 2 rows deep Hot water (H W) coil is placed on condensate tray, Sandwiched type in SS-304 construction with proper drain point. The air will then pass through 3µ fine filter installed in AHU supply plenum. FA damper are provide with 10µ G-4 pre- filter, EA damper are provide with (0.3µ)H-13 HEPA filter.
Filtered air after 3µ filter will be supplied to the room via leak proof GSS Ducting through ceiling mounted Supply air Hepa (0.3 µ) H-13 and air will return through return air Riser via return duct to mixing chamber. Both ends of the GI ducts will have flanges & flanges will have neoprene gasket. GI ducts will be thermally insulated by Polyethylene foam insulation. Air volume control dampers shall be installed at (fresh, return) air inlet, (supply, bleed) air outlet of AHU and Supply air Hepa & Risers. Fire damper should be installed on supply & return air duct near to AHU. RESPONSIBILITY Engineering and Maintenance Department Preparation of the IQ protocol in conjunction with user . Checking the protocol for adequacy and accuracy prior to the approval. Providing guidance, wherever required to the related departments. Quality Assurance Department Providing guidance and check the protocol document. Head Operations Checking the protocol for adequacy and accuracy. Providing required details to the Engineering / Maintenance. Collection of data and preparation of final design. Execution of the protocol and preparation of IQ summary report. User department Approval of protocol. ABBREVIATIONS:
Sr. No.
Term
Explanation
1
AHU
Air Handling Unit
2
DQ
Design Qualification.
3
IQ
Installation Qualification
4
OQ
Operational Qualification
5
GI
Galvanized Iron
6
SS
Stainless Steel.
7
Temp
Temperature
8
RH
Relative Humidity
9
ACPH
Air Changes per Hour.
10
CFM
Cubic Feet per minute
11
MOC
Material of construction
12
Cont.
Continued
13
WC
Water column
14
SOP
Standard Operating Procedures
15
0
Degree centigrade
16
m
Micron
17
cGMP
Current Good manufacturing practices
18
Min
Minimum
19
Max
Maximum
20
NMT
Not more than
21
NLT
Not less than
22
NA
Not Applicable
23
EPS
Expanded polystyrene
C
24
DX
Direct Expansion
25
HEPA
High efficiency particulate air
Sr. No.
Term
Explanation
26
FPI
Fins per Inch.
27
ADP
Apparatus dew point
28
ISO
International Organization for Standardization.
29
URS
User requirement specification
30
Q. A. Head
Quality Assurance Head
31
VCD
Volume Control Damper.
32
GSS
Galvanized sheet steel
33
AL.
Aluminium
34
NR
Not Required
35
DIDW
Double Inlet Double Width
36
DB
Dry Bulb
37
FLP
Flame Proof
38
KW
Kilo Watt
39
HP
Horse Power
40
Ph
Phase
41
Sq. Cg.
Squirrel Cage
42
Pa
Pascal
EXECUTION TEAM
Department
Responsibility
Quality Assurance
Monitoring and reviewing the validation activities
Engineering
Execute the validation activity and provide necessary support for the proper installation of the equipment
Production
Participate and provide necessary support for the validation activity
Name
Designation
Signature / Date
The following components were checked if they are according to the design specification: Design Verification Room Data Sheet Floor Plan Drawing INSTALLATION VERIFICATION It was checked and proved that the Air Handling unit and the documentation correspond to the order. In addition, changes and supplements were identified and documented. This review is the basis for further functional reviews, maintenance and modification control. The IQ protocol defines test procedures, acceptance criteria and the documents that are necessary to prove that the Air Handling unit was installed correctly and corresponds to the specifications of the manufacturers as well as client and that it is suitable for the planned application. The completely executed and finally approved protocol confirms that the Air Handling system is corresponds to all acceptance criteria. The Installation-Qualification is valid as documented evidence, that the Air Handling Unit corresponds with all checkpoints of design plans, all components of manufacturer’s documentation,
rules of technique and the defined requests, The basis for the installation qualification was the detailed design, room tables and the technical Manufacturers documentation. The following appendices, in the qualification protocol attached, were used for execution of the installation qualification to prove the Air Handling Unit corresponds with the defined requests. The following drawings were compared on site to the existing installation: Fresh air filter (G-4) Pre Filter (G-4 +F-5 ) Combo Fine Filter (F-7) Bleed Air Filter (H-13) Supply Blower – Motor Cooling coil Heating Coil Supply/Return Air dampers Fire Dampers Duct work INSTALLATION CHECK The listed drawings shall be compared on site to the existing installed and any discrepancy shall be marked by redlining in the drawing. After the completion of the walk down, the checked drawings have to be signed with date and signature and have to be attached to these protocols. General Verification:Acceptance criteria fulfilled YES / NO
Title
Acceptance criteria
Layout
The drawing reflects “as built” conditions
Room Data Sheet
The drawing reflects “as built” conditions
Grills Location Drawing
The drawing reflects “as built” conditions
Remarks___________________________________________________________________ Component: Fresh air Pre Filter Acceptance
Feature
Specification = Acceptance Criteria
Manufacturer
Air Tech.
Location
AHU
Filter Class / Efficiency
10 µ
criteria fulfilled YES / NO
How verified
Physical Inspection along with Unit Drawing
Model / Type
Flange type
Dimensions of Filters(mm)
305 x 305 x 50 mm
Number of Filters
1 Nos
Installation
Installed in Fresh air Module
Remarks____________________________________________________________________ Component: Pre Filter (Combo)
Feature
Specification
Manufacturer
Air tech.
Location
Coil protection in mixing chamber
Filter Class / Separation Efficiency
10 µ +5 µ
Model / Type
Flange type Filter
Acceptance criteria fulfilled YES / NO
How verified
Physical Inspection along with Unit Drawing
610 x 610 x 380 Dimensions (mm) 305 x 610 x 380
Number of Filters
1 Nos Each
Pressure difference measuring
4-5 mm
Installation
Installed in Return Plenum at clean condition
Remarks_________________________________________________________________ Component: Fine Filter
Feature
Specification
Acceptance criteria fulfilled YES / NO
How verified
Manufacturer
Air tech.
Location
Supply Chamber in AHU
Filter Class / Separation Efficiency
3µ
Model / Type
Flange type Filter
Physical Inspection along with Unit Drawing
610 x 610 x 305 Dimensions (mm) 305 x 610 x 305
Number of Filters
1 Nos Each
Pressure difference measuring
7.5-8.5 mm
Installation
Installed in Supply Plenum at clean condition
Remarks__________________________________________________________________ Component: Bleed air Filter
Feature
Specification
Manufacturer
Air Tech.
Location
AHU
Filter Class / Efficiency
0.3 µ
Model / Type
Flange type
Dimensions of Filters(mm)
305 x 305 x 305 mm
Acceptance criteria fulfilled YES / NO
How verified
Physical Inspection along with Unit Drawing
Number of Filters
1 Nos
Installation
Installed in Exhaust air Module
Remarks__________________________________________________________________ Component: HEPA Filter
Feature
Specification
Manufacturer
NA
Location
NA
Filter Class / Separation Efficiency
NA
Model / Type
NA
Dimensions (mm)
NA
Number of Filters
NA
Pressure difference measuring
NA
Installation
NA
Acceptance criteria fulfilled YES / NO
How verified
Physical Inspection along with Unit Drawing
Remarks__________________________________________________________________ Component: Fan – Motor
Feature
Specification
Make
Punker
Acceptance criteria fulfilled YES / NO
How verified
Type
PLUG Type (non spark proof)
Capacity
2718 cfm
Total Static Pressure
115 mm of wc
Fan/ Blower speed(RPM)
2754
Motor
Make
CG / BBL / ABB / Siemens or equivalent make
Type
TEFC 3Ph / 4Pole
Rating
3.7 kw,2 Pole EFF-2
Remarks_________________________________________________________________ Component: Damper
Feature
Specification = AcceptanceCriteria
Location
Supply, Return, Fresh & Bleed air damper
Model / Type
Opposed blade low leakage GI damper
Acceptance criteria fulfilled YES / NO
How verified
Visual Inspection
Remarks__________________________________________________________________ Component: Ductwork
Feature
Specification = Acceptance criteria
Acceptance criteria fulfilled YES / NO
How verified
Material
GI sheets
Manufacturer of Sheets
Jindal / Tata
Zinc Coating Thickness
Coating of 120g/Sqmtr
Duct joints
All joints are with angle iron flanges and neoprene rubber gaskets.
Type of sealing at joints
Silicon sealant at all the longitudinal & transverse joints.
Sheet thickness
20/22/24 SWG
Installation
Completed under clean condition
Ducting Layout & Visual Inspecti on
Remarks__________________________________________________________________ Component: Outlet Terminal Box
Feature
Specification = Acceptance criteria
Manufacturer
MKP
Type
Swirl Diffuser
Installation
Completed
Acceptance criteria fulfilled YES / NO
How verified
Ducting Layout & Visual Inspection
Remarks________________________________________________________________________ DOCUMENTATION REQUIREMENT The purpose of documentation is to provide basis for further validation (OQ) and generated documented evidence that the equipment / system was manufactured as per the desired design criteria. General : Purchase order : System specification
Instrumentation calibration : Calibration certificate for the
Magnehelic Gauge Other certificates : Certification Manifold valves, Ducting, & Insulation Lists : Equipment and instrument list with Component descriptions. : Electrical component parts list with descriptions. Spare parts list.
DEVIATION REPORT All discrepancies between specification and Acceptance criteria fulfilled yes / no on site concerning the installation equipment, piping, supply and supervision facilities which are discovered during the Acceptance criteria fulfilled yes / no of this protocol have to be documented in this divergence report. This page may be copied (as often as you need it in case of more than one discovered divergence). Deviation No.: ______________________
Deviation
Observed by:
Date:
Assessment and Action
Conducted by:
Date:
Action taken
Executed by:
Verified by:
Date:
Date:
IQ SUMMARY AND CONCLUSION: SUMMARY ——————————————————————————————————————————— ———–
CONCLUSION ——————————————————————————————————————————— ———–
Forms and Records (Annexures) Not Applicable Distribution
Master copy – Quality Assurance Controlled copies- Quality Assurance, User Departments History Date
Revision Number
Reason for Revision
–
00
New