LEGEND C-1 Regrinding hydrocyclone feeder C-2 O/F regringding cyclone C-3 U/F regringding cyclone C-4 Discharging of reg
Views 182 Downloads 1 File size 2MB
LEGEND C-1 Regrinding hydrocyclone feeder C-2 O/F regringding cyclone C-3 U/F regringding cyclone C-4 Discharging of regrinding mill C-5 Copper cleaner feed C-6 Copper cleaner concentrate C-7 Copper cleaner tailings C-8 copper concentrate thickener feed C-9 U/F concentrate thickener C-10 O/F concentrate thickener C-11 Cleaner scavenger feed C-12 Cleaner scavenger concentrate C-13 Cleaner scavenger tailings
010
MILK OF LIME 000-FS-T-001
002
FROM BULK CONCENTRATE CONDITIONING TANK
M
C2
COPPER REGRIND MILL CYCLONE CLUSTER CYCLONE (13)
MOLY ROUGHER FLOTATION CELLS (4) M
HOLD
C5
M M HOLD
COPPER CLEANER FEED ROTARY DISTRIBUTOR
C1
C3
COPPER REGRIND MILL (1)
C4
COPPER CLEANER FLOTATION COLUMNS (4)
BY VENDOR
C6
M
COPPER CLEANER SCAVENGER FLOTATION CELLS (4)
C11
COPPER REGRIND MILL MOLY ROUGHER CYCLONES FEED CONCENTRATE PUMPBOX PUMPBOX
C10 COPPER CONCENTRATE THICKENER
000-FS-T-001
003
TO BULK CONCENTRATE THICKENER
C9
245-FS-T-002
M
COPPER CLEANER SCAVENGER FEED PUMPBOX
004
TO FILTER PLANT M M
1st MOLY CLEANER CELLS (4)
COPPER CONCENTRATE THICKENER OVERFLOW PUMPBOX
C8
C7
M
M M
M M
000-FS-T-002
DRAWING No.
000-FS-T-001
C13 C12 COPPER REGRIND MILL CYCLONES FEED PUMPBOX
COPPER CLEANER SCAVENGER TAILS PUMPBOX 000-FS-T-001
2nd MOLY CLEANER CELLS (3)
005
TO TRANSFER BOX OF PLANT TAILINGS THICKENER
M
000-FS-T-001
006
M TO BULK CONCENTRATE THICKENER
M 1st MOLY CLEANER TAILS PUMPBOX
MOLY REGRIND MILL CYCLONE CLUSTER CYCLONE (5)
4th MOLY CLEANER COLUMNS CELLS
3rd MOLY CLEANER COLUMNS CELLS
MOLY REGRIND MILL
MOLY CONCENTRATE THICKENER OVERFLOW PUMPBOX
M
BY VENDOR 000-FS-T-001
007
TO BULK CONCENTRATE THICKENER MOLY CONCENTRATE THICKENER 3rd MOLY CLEANER FEED PUMPBOX
2nd MOLY CLEANER TAILS PUMPBOX
4th MOLY CLEANER FEED PUMPBOX 280-FS-T-002
008
TO STORAGE TANK MOLY CLEANER-SCAVENGER FEED PUMPBOX M M
MOLY CLEANER SCAVENGER FLOTATION CELLS (4) M
000-FS-T-001 M
009
TO PLANT TAILINGS THICKENER
KNIFE GATE VALVE
LEGEND: PRIMARY FLOW LIQUID
SECONDARY FLOW LIQUID
CONSUMABLES INTERMITTENT OR ALTERNATE FLOW DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL QUALITY CONTROL
DISCIPLINE MANAGER NAME
MOLY CLEANER-SCAVENGER TAILS PUMPBOX
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L E
MOLY REGRIND MILL CYCLONES FEED PUMPBOX
SIGN & STAMP
NAME
R E V I S I O N S
R E F E R E N C E S DWG. NO.
SIGN
DOCUMENT CONTROL
NO.
D E S C R I P T I O N
BY
SCALE:
R E V I S I O N S CHECK
APPROVED
DATE
NO.
D E S C R I P T I O N
BY
CHECK
APPROVED
DATE
PROJECT
SHEET SIZE
TOROMOCHO PROJECT
A1
NOTICE
AREA THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY.
DRAWN BY:
A.P.
DATE:
18/02/09 TITLE
THIS DRAWING IS THE PROPERTY OF AND EMBODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON
CHECKED BY:
H.A.
DATE:
18/02/09
APPROVED BY:
P.Z.
DATE:
19/02/09
AUTHORIZED BY:
A.F.
DATE:
18/02/09
REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN
0
APPROVED FOR CONSTRUCTION
A.P.
H.A.
P.Z.
A.F.
19/02/09
PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION.
000-FS-T-002
OVERALL FLOW DIAGRAM SHEET 2 OF 2 (BASIC ENG.)
H
ISSUED FOR CLIENT APPROVAL
A.P.
H.A.
P.Z.
A.F.
03/02/09
G
RE-ISSUED FOR INTERNAL COORDINATION
A.P.
J.C.
P.Z.
A.F.
14/11/08
F
ISSUED FOR DESIGN (BASIC ENG.)
P.V.
P.M.
G.R.
19/09/08
MINERA CHINALCO PERU S.A. MCP APPROVED:
DATE:
User:
csc3427
19-02-2009
15:29:15
000 - GENERAL
OVERALL PROCESS FLOW DIAGRAM SHEET 2 OF 2
P:\SCL_04_Eng_Dwg\03_Pro\04_Final\000-FS-T-002_0.dgn
C-560
REVISION
CAD NO.
000-FS-T-002_0.dgn DWG. NO.
000-FS-T-002
0