Capacity Planning.pdf

Project: MISSION SURE ! "# $%& ' &&" (%&& End User Training Manual for SAP PP – Production Planning & Control Proces

Views 97 Downloads 0 File size 524KB

Report DMCA / Copyright

DOWNLOAD FILE

Recommend stories

Citation preview

Project: MISSION SURE

! "# $%& ' &&"

(%&&

End User Training Manual for SAP PP – Production Planning & Control

Process Name: Production Execution – Capacity Planning (T-code CM01)

Process No: TRF/O2C/6.0

Control Copy No: TRF/O2C/6.0/

#) Doc Version

00

* #

Description

Prepared by

Date

Original

Palani Dorai

24.12.2009 AK Anal,

Reviewed by

Sachin Kumar Rajak, Minu Singh

Approved by

Project: MISSION SURE

Introduction The Production Planning and Control functional area in TRF has the following business processes. % %

+ ! "

'

"

!

"

#

$

% &#

(

"

!

#

)

!

#

$$ &#

$

$

$ #

For each of the above processes, there are separate End User Training Manuals are available

This End user Training manual covers from sl. no. 5 of the above list, that is, the Capacity planning of the Production Execution process

a) Capacity planning - Transaction code CM01

TRF/O2C/6.0 ' &&" Page 2 of 13

(%&&

Project: MISSION SURE

1. Capacity Planning - Transaction code – CM01 Procedural Steps

Menu Path To access CM01, use the following menu path SAP Easy Access > SAP menu > Logistics > Production > Capacity planning > Evaluation > Work center View > CM01 - Load

Transaction Code CM01

Procedure Enter the Transaction code CM01 in the command field (as shown in the below screen)

Or go as per the navigation shown below and click CM01 – Load

TRF/O2C/6.0 ' &&" Page 3 of 13

(%&&

Project: MISSION SURE

Press key or click on the check mark

icon in the top left side corner of the

Screen, the following screen Project Builder screen appears.

TRF/O2C/6.0 ' &&" Page 4 of 13

(%&&

Project: MISSION SURE

1) Key-in the work center value in the Work Center field. We have keyed in 102005 as the work center value in the work center field. 2) Key-in the Plant number in the Plant field. We have keyed-in 1000 for this field. The screen will look as shown below

TRF/O2C/6.0 ' &&" Page 5 of 13

(%&&

Project: MISSION SURE

Click on the check mark

button, the following screen will appear

TRF/O2C/6.0 ' &&" Page 6 of 13

(%&&

Project: MISSION SURE

Select the first week, as shown below

TRF/O2C/6.0 ' &&" Page 7 of 13

(%&&

Project: MISSION SURE

push button, the following

And click on the Cap. Details / period screen appears

TRF/O2C/6.0 ' &&" Page 8 of 13

(%&&

Project: MISSION SURE

Planned Orders

Production Orders

Click on the Choose Fields following pop up window appears.

push button to display any other fields, the

TRF/O2C/6.0 ' &&" Page 9 of 13

(%&&

Project: MISSION SURE

Scroll this bar up and down Scroll the slide bar of the Field column up and down to locate the field. We have located the field name “Material Description”. Select (click once) this field and

Click on the left side arrow button to move this selected field to the Selected Field column.(Refer screen below, the Material Description field is moved to the Left Hand Side)

TRF/O2C/6.0 ' &&" Page 10 of 13

(%&&

Project: MISSION SURE

button of the pop up window, the following screen appears Click on the check mark showing the description also.

Return back to the earlier screen by clicking the left side arrow appears

TRF/O2C/6.0 ' &&" Page 11 of 13

(%&&

, the following screen

Project: MISSION SURE

Click on the Standard View

button, to the see the details in the graphical form.

The following pop up window appears.

Return back to the Home Screen or SAP Easy Access Screen.

End of document on T-code CM01 – Load

End of document on – Production order Confirmation - (TRF/O2C/6.0) – 002

TRF/O2C/6.0 ' &&" Page 12 of 13

(%&&

Project: MISSION SURE

TRF/O2C/6.0 ' &&" Page 13 of 13

(%&&