BECTEK CONTRATISTAS SAC.

SUPERVISION

RESPONSABLE

RESPONSABLE

Valorizacion 01

URB. LOS PORTALES DEL GOLF MZ. A LOTE 02, VICTOR LARCO H. - TRUJILLO Contratista: Obra: Presupuesto: Subpresupuesto: Partida de Control:

SANTA MARIA CONTRATISTAS Y CONSULTORES SA. SOL DE POMALCA PRESUPUESTO META OBRA SOL DE POMALCA - MZ C (401 VIVIENDAS) CONTROL TOPOGRAFICO 923036145

Periodo: Moneda: Lugar:

Sabado, 15 de Septiembre 2018 Nuevos Soles Pomalca - Chiclayo - Lambayeque

PRESUPUESTO DE OBRA Item 01.00.00 01.01.00 01.01.01 01.01.01.01 01.01.01.02 01.01.01.03 01.01.03 01.01.03.01 01.01.03.02 01.01.03.03 01.02.00 01.02.01 01.02.02 01.03.00 01.03.01 01.03.02 01.03.03 01.04.00 01.04.01 01.04.02

VAL. ANTERIOR Descripción CONTROL TOPOGRAFICO

Und. Metrado

CONTROL TOPOGRAFICO CONTROL TOPOGRAFICO EN TRABAJOS DE SANEAMIENTO CONTROL TOPOGRAFICO EN TRABAJOS DE AGUA Y ALCANTARILLADO MZ C MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE DRENAJE PLUVIAL MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE ELECTRIFICACION HU MANO DE OBRA MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE MOVIMIENTO DE TIERRAS HU MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN CONSTRUCCION DE CASAS MANO DE OBRA MATERIALES PARA TOPOGRAFIA COSTO DIRECTO TOTAL GASTOS GENERALES SUB TOTAL IGV TOTAL S/DESCUENTOS

Precio S/.

GLB GLB GLB

1.00 1.00 1.00

S/. 38,775.11 S/. 8,224.67 S/. 2,000.00

GLB GLB GLB

1.00 1.00 1.00

S/. S/. S/.

GLB GLB

TOTAL

METRADO

VAL. ACTUAL

PARCIAL

METRADO

ACUMULADO

PARCIAL

METRADO

SALDO DE OBRA

PARCIAL

METRADO

PARCIAL

38,775.11 8,224.67 2,000.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00 1.00

38775.11 8224.67 2000.00

1,037.44 338.00 300.00

1,037.44 338.00 300.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00 1.00

1037.44 338.00 300.00

1.00 1.00

S/. 13,860.83 S/. 2,000.00

13,860.83 2,000.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 1.00

13860.83 2000.00

GLB GLB GLB

1.00 1.00 1.00

S/. 33,207.72 S/. 8,450.00 S/. 3,500.00

33,207.72 8,450.00 3,500.00

0.22 0.15 0.15

7305.70 1267.50 525.00

0.22 0.15 0.15

7305.70 1267.50 525.00

0.78 0.85 0.85

25902.02 7182.50 2975.00

GLB GLB

1 1

S/. 39,747.73 S/. 5,000.00

39,747.73 5,000.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 1.00

39747.73 5000.00

0.00%

18.00%

S/. 156,441.50 0.00% S/. 0.00

S/. S/.

-

S/. 156,441.50 S/. 28,159.47 S/. 184,600.97

S/. S/. S/.

-

5.82%

S/. S/. S/. S/. S/.

9,098.20 5.82% 9,098.20 1,637.68 10,735.87

S/. 9,098.20 94.18% S/. -

S/. S/.

147,343.30 -

S/. 9,098.20 S/. 1,637.68 S/. 10,735.87

S/. S/. S/.

147,343.30 26,521.79 173,865.10

BECTEK CONTRATISTAS SAC. RESPONSABLE

URB. LOS PORTALES DEL GOLF MZ. A LOTE 02, VICTOR LARCO H. - TRUJILLO Contratista: Obra: Presupuesto: Subpresupuesto: Partida de Control:

SANTA MARIA CONTRATISTAS Y CONSULTORES SA. SOL DE POMALCA PRESUPUESTO META OBRA SOL DE POMALCA - MZ C (401 VIVIENDAS) CONTROL TOPOGRAFICO 923036145

Periodo: Moneda: Lugar:

Nuevos Soles Pomalca - Chiclayo - Lambayeque

PRESUPUESTO DE OBRA Item 01.00.00 01.01.00 01.01.01 01.01.01.01 01.01.01.02 01.01.01.03 01.01.02 01.01.02.01 01.01.02.02 01.01.02.03 01.02.00 01.02.01 01.02.02 01.03.00 01.03.01 01.03.02 01.03.03 01.04.00 01.04.01 01.04.02

VAL. ANTERIOR Descripción CONTROL TOPOGRAFICO

Und. Metrado

CONTROL TOPOGRAFICO CONTROL TOPOGRAFICO EN TRABAJOS DE SANEAMIENTO CONTROL TOPOGRAFICO EN TRABAJOS DE AGUA Y ALCANTARILLADO MZ C MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE DRENAJE PLUVIAL MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE ELECTRIFICACION HU MANO DE OBRA MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE MOVIMIENTO DE TIERRAS HU MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN CONSTRUCCION DE CASAS MANO DE OBRA MATERIALES PARA TOPOGRAFIA COSTO DIRECTO TOTAL GASTOS GENERALES SUB TOTAL

Precio S/.

GLB GLB GLB

1.00 1.00 1.00

S/. 38,775.11 S/. 8,224.67 S/. 2,000.00

GLB GLB GLB

1.00 1.00 1.00

S/. S/. S/.

GLB GLB

TOTAL

METRADO

PARCIAL

38,775.11 8,224.67 2,000.00

0.00 0.00

0.00 0.00 0.00

1,037.44 338.00 300.00

1,037.44 338.00 300.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00

S/. 13,860.83 S/. 2,000.00

13,860.83 2,000.00

0.00 0.00

0.00 0.00

GLB GLB GLB

1.00 1.00 1.00

S/. 33,207.72 S/. 8,450.00 S/. 3,500.00

33,207.72 8,450.00 3,500.00

0.22 0.15 0.15

7305.70 1267.50 525.00

GLB GLB

1 1

S/. 39,747.73 S/. 5,000.00

39,747.73 5,000.00

0.00 0.00

0.00 0.00

0.00%

S/. 156,441.50 5.82% S/. 0.00

S/. 9,098.20 S/. -

S/. 156,441.50

S/. 9,098.20

IGV TOTAL S/DESCUENTOS

18.00%

S/. 28,159.47 S/. 184,600.97

S/. 1,637.68 S/. 10,735.87

SUPERVISION RESPONSABLE

Valorizacion 02 Sabado, 29 de Septiembre 2018

VAL. ACTUAL METRADO

0.22 0.18 0.18

6.05%

ACUMULADO

PARCIAL

METRADO

SALDO DE OBRA

PARCIAL

METRADO

PARCIAL

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00 1.00

38775.11 8224.67 2000.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00 1.00

1037.44 338.00 300.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 1.00

13860.83 2000.00

7305.70 1526.96 630.00

0.44 0.33 0.33

14611.40 2794.46 1155.00

0.56 0.67 0.67

18596.32 5655.54 2345.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 1.00

39747.73 5000.00

S/. S/.

9,462.66 11.86% -

S/. 18,560.85 88.14% S/. -

S/. S/.

137,880.65 -

S/.

9,462.66

S/. 18,560.85

S/.

137,880.65

S/. S/.

1,703.28 11,165.93

S/. 3,340.95 S/. 21,901.81

S/. S/.

24,818.52 162,699.16

BECTEK CONTRATISTAS SAC. RESPONSABLE

URB. LOS PORTALES DEL GOLF MZ. A LOTE 02, VICTOR LARCO H. - TRUJILLO Contratista: Obra: Presupuesto: Subpresupuesto: Partida de Control:

SANTA MARIA CONTRATISTAS Y CONSULTORES SA. SOL DE POMALCA PRESUPUESTO META OBRA SOL DE POMALCA - MZ C (401 VIVIENDAS) CONTROL TOPOGRAFICO 923036145

Periodo: Moneda: Lugar:

Nuevos Soles Pomalca - Chiclayo - Lambayeque

PRESUPUESTO DE OBRA Item 01.00.00 01.01.00 01.01.01 01.01.01.01 01.01.01.02 01.01.01.03 01.01.02 01.01.02.01 01.01.02.02 01.01.02.03 01.02.00 01.02.01 01.02.02 01.03.00 01.03.01 01.03.02 01.03.03 01.04.00 01.04.01 01.04.02

VAL. ANTERIOR Descripción CONTROL TOPOGRAFICO

Und. Metrado

CONTROL TOPOGRAFICO CONTROL TOPOGRAFICO EN TRABAJOS DE SANEAMIENTO CONTROL TOPOGRAFICO EN TRABAJOS DE AGUA Y ALCANTARILLADO MZ C MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE DRENAJE PLUVIAL MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE ELECTRIFICACION HU MANO DE OBRA MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN TRABAJOS DE MOVIMIENTO DE TIERRAS HU MANO DE OBRA ALQUILER DE EQUIPOS MATERIALES PARA TOPOGRAFIA CONTROL TOPOGRAFICO EN CONSTRUCCION DE CASAS MANO DE OBRA MATERIALES PARA TOPOGRAFIA COSTO DIRECTO TOTAL GASTOS GENERALES SUB TOTAL

Precio S/.

GLB GLB GLB

1.00 1.00 1.00

S/. 38,775.11 S/. 8,224.67 S/. 2,000.00

GLB GLB GLB

1.00 1.00 1.00

S/. S/. S/.

GLB GLB

TOTAL

METRADO

PARCIAL

38,775.11 8,224.67 2,000.00

0.00 0.00 0.00

0.00 0.00 0.00

1,037.44 338.00 300.00

1,037.44 338.00 300.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00

S/. 13,860.83 S/. 2,000.00

13,860.83 2,000.00

0.00 0.00

0.00 0.00

GLB GLB GLB

1.00 1.00 1.00

S/. 33,207.72 S/. 8,450.00 S/. 3,500.00

33,207.72 8,450.00 3,500.00

0.44 0.33 0.33

14611.40 2794.46 1155.00

GLB GLB

1 1

S/. 39,747.73 S/. 5,000.00

39,747.73 5,000.00

0.00 0.00

0.00 0.00

0.00%

S/. 156,441.50 11.86% S/. 0.00

S/. 18,560.85 S/. -

S/. 156,441.50

S/. 18,560.85

IGV TOTAL S/DESCUENTOS

18.00%

S/. 28,159.47 S/. 184,600.97

S/. 3,340.95 S/. 21,901.81

SUPERVISION RESPONSABLE

Valorizacion 03 Lunes, 15 de Octubre 2018

VAL. ACTUAL METRADO

11.55%

ACUMULADO

PARCIAL

METRADO

SALDO DE OBRA

PARCIAL

METRADO

PARCIAL

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00 1.00

38775.11 8224.67 2000.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1.00 1.00 1.00

1037.44 338.00 300.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 1.00

13860.83 2000.00

0.40 0.40 0.40

13283.09 3380.00 1400.00

0.84 0.73 0.73

27894.48 6174.46 2555.00

0.16 0.27 0.27

5313.24 2275.54 945.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.00 1.00

39747.73 5000.00

S/. S/.

18,063.09 23.41% -

S/. 36,623.94 76.59% S/. -

S/. S/.

119,817.56 -

S/.

18,063.09

S/. 36,623.94

S/.

119,817.56

S/. S/.

3,251.36 21,314.44

S/. 6,592.31 S/. 43,216.25

S/. S/.

21,567.16 141,384.72