CRONOGRAMA DE DESEMBOLSO PROYECTO: “CREACION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE SAN CRISTOBAL DE CHAUPIMARCA, DISTRI
Views 43 Downloads 0 File size 75KB
CRONOGRAMA DE DESEMBOLSO PROYECTO: “CREACION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE SAN CRISTOBAL DE CHAUPIMARCA, DISTRITO DE TAPUC - DANIEL ALCIDES CARRION - PASCO” CLIENTE: MUNICIPALIDAD DISTRITAL DE TAPUC ITEM
DESCRIPCION
UND
CANTIDAD
PRECIO
COSTO
1ER. MES MONTO ( S/.)
PARCIAL
2DO. MES AVANCE %
MONTO ( S/.)
3ER. MES AVANCE %
MONTO ( S/.)
4TO. MES AVANCE %
MONTO ( S/.)
AVANCE %
MANO DE OBRA 0101010003
OPERARIO
hh
6,774.4005
18.75
127,020.01
25404.00
20.00%
25404.00
20.00%
25404.00
20.00%
25404.00
20.00%
0101010004
OFICIAL
hh
4,734.7113
14.55
68,890.05
13778.01
20.00%
13778.01
20.00%
13778.01
20.00%
13778.01
20.00%
0101010005
PEON
hh
13,741.2082
12.99
178,498.29
35699.66
20.00%
35699.66
20.00%
35699.66
20.00%
35699.66
20.00%
0101030000
TOPOGRAFO
hh
110.6718
18.75
2,075.10
1037.55
50.00%
415.02
20.00%
207.51
10.00%
207.51
10.00%
MATERIALES 0201020012
GRASA AMARILLA
kg
1.0295
10.00
10.30
1.03
10.00%
2.06
20.00%
2.06
20.00%
2.06
20.00%
0201020013
PLANTAS ORNAMENTALES
und
13.0000
19.00
247.00
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0201030002
MEMBRANIL A
gal
107.8588
45.00
4,853.65
970.73
20.00%
970.73
20.00%
970.73
20.00%
970.73
20.00%
0201040003
KEROSENE
gal
26.2190
25.00
655.48
0.00
196.64
30.00%
65.55
10.00%
196.64
30.00%
02010500010001
ASFALTO RC-250
gal
521.5619
20.00
10,431.24
1043.12
10.00%
2086.25
20.00%
2086.25
20.00%
2086.25
20.00%
02040100010001
ALAMBRE NEGRO RECOCIDO N° 8
kg
314.6038
4.50
1,415.72
283.14
20.00%
283.14
20.00%
283.14
20.00%
283.14
20.00%
02040100010002
ALAMBRE NEGRO RECOCIDO N° 16
kg
1,021.7009
4.50
4,597.65
919.53
20.00%
919.53
20.00%
919.53
20.00%
919.53
20.00%
02040200070003
ANGULO DE 1 1/2" X 1 1/2" X 1/8"
m
3,037.5360
7.53
22,872.65
4574.53
20.00%
4574.53
20.00%
4574.53
20.00%
4574.53
20.00%
0204030001
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
kg
17,119.9128
4.50
77,039.61
15407.92
20.00%
15407.92
20.00%
15407.92
20.00%
15407.92
20.00%
02040600010018
FIERRO LISO 5/8"
kg
706.9302
4.60
3,251.88
650.38
20.00%
650.38
20.00%
650.38
20.00%
650.38
20.00%
02041200010005
CLAVOS PARA MADERA CON CABEZA DE 3"
kg
206.7901
4.50
930.56
186.11
20.00%
186.11
20.00%
186.11
20.00%
186.11
20.00%
0204120004
CLAVOS CON CABEZA PROMEDIO
kg
246.6445
4.50
1,109.90
221.98
20.00%
221.98
20.00%
221.98
20.00%
221.98
20.00%
02041600010003
PLATINA DE 1 1/2" X 1/8 "
m
808.9920
5.83
4,716.42
943.28
20.00%
943.28
20.00%
943.28
20.00%
943.28
20.00%
02050700020024
TUBERIA PVC SAP C-5, D=3/4" (PARA CONEXION LOSAS)
m
137.2680
3.74
513.38
0.00
0.00%
102.68
20.00%
205.35
40.00%
102.68
20.00%
02060100010020
TUBERIA PVC-SAL 3"
m
86.9400
6.20
539.03
0.00
0.00%
107.81
20.00%
215.61
40.00%
107.81
20.00%
02070100010002
PIEDRA ZARANDEADA 1/2" - 3/4"
m3
1,087.7071
89.00
96,805.93
0.00
0.00%
19361.19
20.00%
38722.37
40.00%
19361.19
20.00%
0207010009
GRAVILLA
m3
11.3850
75.00
853.88
0.00
0.00%
170.78
20.00%
341.55
40.00%
170.78
20.00%
02070200010001
ARENA FINA
m3
161.6830
98.00
15,844.93
0.00
0.00%
3168.99
20.00%
6337.97
40.00%
3168.99
20.00%
02070200010002
ARENA GRUESA
m3
1,093.9236
98.00
107,204.51
0.00
0.00%
21440.90
20.00%
42881.80
40.00%
21440.90
20.00%
0207030001
HORMIGON
m3
13.0851
80.50
1,053.35
0.00
0.00%
210.67
20.00%
421.34
40.00%
210.67
20.00%
0207040002
MATERIAL DE PRESTAMO
m3
47.0880
55.00
2,589.84
0.00
0.00%
517.97
20.00%
1035.94
40.00%
517.97
20.00%
0207040003
MATERIAL CLASIFICADO PARA BASE
m3
1,390.7568
77.00
107,088.27
0.00
0.00%
21417.65
20.00%
42835.31
40.00%
21417.65
20.00%
02070500010002
TIERRA DE CHACRA
m3
7.5662
95.00
718.79
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0210030005
MALLA DE SEGURIDAD DE PVC
rll
2.0000
26.00
52.00
5.20
10.00%
10.40
20.00%
15.60
30.00%
10.40
20.00%
02100400010009
TECNOPORT DE 1"X4X8'
m2
507.0600
15.00
7,605.90
760.59
10.00%
1521.18
20.00%
2281.77
30.00%
1521.18
20.00%
0213010001
CEMENTO PORTLAND TIPO I (42.5 kg)
bol
15,379.7871
19.92
306,365.36
30636.54
10.00%
61273.07
20.00%
91909.61
30.00%
61273.07
20.00%
0213030001
YESO
kg
208.0298
5.60
1,164.97
116.50
10.00%
232.99
20.00%
349.49
30.00%
232.99
20.00%
0216020010
GRASS BLOCK
m2
86.0565
35.00
3,011.98
301.20
10.00%
602.40
20.00%
903.59
30.00%
602.40
20.00%
0222180001
ADITIVO CURADOR
gal
259.3464
63.56
16,484.06
1648.41
10.00%
3296.81
20.00%
4945.22
30.00%
3296.81
20.00%
0231000002
LEÑA
kg
104.8760
0.30
31.46
3.15
10.00%
6.29
20.00%
9.44
30.00%
6.29
20.00%
02310500010007
TRIPLAY LUPUNA 19 mm
pln
65.8368
105.00
6,912.86
691.29
10.00%
1382.57
20.00%
2073.86
30.00%
1382.57
20.00%
0231120002
MADERA ROBLE CORRIENTE
p2
14,164.1113
4.50
63,738.50
6373.85
10.00%
12747.70
20.00%
19121.55
30.00%
12747.70
20.00%
0240070004
PINTURA DE TRAFICO
gal
9.2098
55.08
507.28
50.73
10.00%
101.46
20.00%
152.18
30.00%
101.46
20.00%
0240080017
DISOLVENTE XILOL
gal
11.0518
40.68
449.59
44.96
10.00%
89.92
20.00%
134.88
30.00%
89.92
20.00%
0255080015
SOLDADURA CELLOCORD
kg
22.7404
15.00
341.11
34.11
10.00%
68.22
20.00%
102.33
30.00%
68.22
20.00%
02671100060005
LUCES INTERMITENTES
und
5.0000
98.00
490.00
49.00
10.00%
98.00
20.00%
147.00
30.00%
98.00
20.00%
0267110014
TRANQUERAS
und
8.0000
70.00
560.00
56.00
10.00%
112.00
20.00%
168.00
30.00%
112.00
20.00%
0267110022
CONOS DE SEGURIDAD
und
10.0000
35.00
350.00
35.00
10.00%
70.00
20.00%
105.00
30.00%
70.00
20.00%
0267110023
CARTEL DE SEGURIDAD
und
1.0000
50.00
50.00
5.00
10.00%
10.00
20.00%
15.00
30.00%
10.00
20.00%
0267110026
CARTEL DE OBRA 3.60 x 8.50
und
1.0000
1,500.00
1,500.00
150.00
10.00%
300.00
20.00%
450.00
30.00%
300.00
20.00%
0272010087
TUBO Fo.Go. ISO-2"
m
71.3055
35.60
2,538.48
253.85
10.00%
507.70
20.00%
761.54
30.00%
507.70
20.00%
0272010088
TUBO Fo.Go. ISO-1"
m
152.7975
17.50
2,673.96
267.40
10.00%
534.79
20.00%
802.19
30.00%
534.79
20.00%
0272010089
TUBO Fo.Go. ISO-1 1/2"
m
152.7975
21.30
3,254.59
325.46
10.00%
650.92
20.00%
976.38
30.00%
650.92
20.00%
0290130022
AGUA
m3
1,328.2240
5.00
6,641.12
664.11
10.00%
1328.22
20.00%
1992.34
30.00%
1328.22
20.00%
CRONOGRAMA DE DESEMBOLSO PROYECTO: “CREACION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE SAN CRISTOBAL DE CHAUPIMARCA, DISTRITO DE TAPUC - DANIEL ALCIDES CARRION - PASCO” CLIENTE: MUNICIPALIDAD DISTRITAL DE TAPUC ITEM
DESCRIPCION
UND
CANTIDAD
PRECIO
COSTO
1ER. MES MONTO ( S/.)
PARCIAL
2DO. MES AVANCE %
MONTO ( S/.)
3ER. MES AVANCE %
MONTO ( S/.)
4TO. MES AVANCE %
MONTO ( S/.)
AVANCE %
EQUIPOS 0301000011
TEODOLITO
hm
110.6718
10.00
1,106.72
1106.72
0.00
0.00
03010300060007
PLANCHA COMPACTADORA 4 HP
hm
349.5852
15.00
5,243.78
0.00
100.00%
0.00
5243.78
100.00%
0.00
0301030012
SOLDADORA ELECT. MONOF. ALTERNA 225 AMP
hm
162.8058
8.00
1,302.45
0.00
0.00
1302.45
100.00%
0.00
03010600020009
REGLA DE MADERA
p2
1,428.0860
4.20
5,997.96
0.00
0.00
5997.96
100.00%
0.00
0301100001
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP
hm
184.1815
15.00
2,762.72
0.00
0.00
2762.72
100.00%
0.00
03011000060003
RODILLO LISO VIBRATORIO AUTOPROPULSADO 101-135 HP 10-12 ton
hm
36.6312
150.00
5,494.68
0.00
0.00
5494.68
100.00%
0.00
03011400020004
MARTILLO NEUMATICO DE 24 kg
hm
68.3211
12.00
819.85
0.00
819.85
03011400060002
COMPRESORA NEUMATICA 125-175 PCM, 76 HP
hm
34.1669
70.00
2,391.68
2391.68
100.00%
03011600010004
CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3
hm
31.2995
180.00
5,633.91
5633.91
100.00%
03011600030004
MOVILIZACION Y DESMOVILIZACION
glb
1.0000
26,106.09
26,106.09
26106.09
100.00%
03011700020009
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1 yd 3
hm
10.0510
140.00
1,407.14
0.00
1407.14
100.00%
03011800020001
TRACTOR DE ORUGAS DE 190-240 HP
hm
27.8975
240.00
6,695.40
0.00
6695.40
0301200002
MOTONIVELADORA DE 125 HP
hm
37.9457
180.00
6,830.23
0.00
03012100010003
GRUA HIDRAULICA MOVIL (ALQUILER TERCEROS)
hm
21.0000
150.00
3,150.00
0.00
0301220009
VOLQUETE CAP=15.00M³
hm
96.4953
120.00
11,579.44
0.00
0301220010
CAMION CISTERNA 4x2 (AGUA) 1,500 gl
hm
19.6301
100.00
1,963.01
1963.01
0301230002
ALQUILER DE LOCAL
mes
5.0000
600.00
3,000.00
0.00
0301270005
MOTOSOLDADORA DE 250 A
hm
33.9550
50.00
1,697.75
1697.75
03012900010006
VIBRADOR DE CONCRETO 4 HP 2.40"
hm
278.7605
8.00
03012900030004
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3
hm
936.9842
18.00
03013300020003
CIZALLA PARA CORTE DE FIERRO
hm
521.7498
03013400010002
ANDAMIO METALICO (1.50 m - 2.00 m)
hm
03014700010012
BARRENOS
hm
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
6830.23
100.00%
0.00
0.00
3150.00
100.00%
0.00
0.00
11579.44
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
3000.00
100.00%
0.00
0.00
2,230.08
223.01
10.00%
446.02
16,865.72
1686.57
10.00%
3373.14
10.00
5,217.50
0.00
383.1885
15.00
5,747.83
68.3211
12.30
840.35 96,014.80
96014.80
0.00
100.00%
0.00
20.00%
669.02
30.00%
669.02
30.00%
20.00%
5059.72
30.00%
5059.72
30.00%
0.00
5217.50
100.00%
0.00
0.00
0.00
5747.83
100.00%
0.00
0.00
0.00
840.35
100.00%
0.00
0.00
0.00
0.00
SUB COTRATO 0400020007
SC FLETE TERRESTRE
glb
1.0000
96,014.80
0410010016
SC REUBICACION DE POSTES DE MEDIA TENSION
und
7.0000
1,000.00
COSTO DIRECTO TOTAL PRESUPUESTADO % AVANCE
100.00%
0.00
7,000.00
0.00
0.00
0.00
0.00
S/. 1,493,649.73
###
S/. 287,483.74
S/. 403,150.87
S/. 258,703.75
S/. 1,493,649.73
S/. 280,416.84
S/. 287,483.74
S/. 403,150.87
S/. 258,703.75
18.77%
19.25%
26.99%
0.00%
17.32%
5TO. MES MONTO ( S/.)
AVANCE %
25404.00
20.00%
13778.01
20.00%
35699.66
20.00%
207.51
10.00%
3.09
30.00%
247.00
100.00%
970.73
20.00%
196.64
30.00%
3129.37
30.00%
283.14
20.00%
919.53
20.00%
4574.53
20.00%
15407.92
20.00%
650.38
20.00%
186.11
20.00%
221.98
20.00%
943.28
20.00%
102.68
20.00%
107.81
20.00%
19361.19
20.00%
170.78
20.00%
3168.99
20.00%
21440.90
20.00%
210.67
20.00%
517.97
20.00%
21417.65
20.00%
718.79
100.00%
10.40
20.00%
1521.18
20.00%
61273.07
20.00%
232.99
20.00%
602.40
20.00%
3296.81
20.00%
6.29
20.00%
1382.57
20.00%
12747.70
20.00%
101.46
20.00%
89.92
20.00%
68.22
20.00%
98.00
20.00%
112.00
20.00%
70.00
20.00%
10.00
20.00%
300.00
20.00%
507.70
20.00%
534.79
20.00%
650.92
20.00%
1328.22
20.00%
5TO. MES MONTO ( S/.)
AVANCE %
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 223.01
10.00%
1686.57
10.00%
0.00 0.00 0.00
0.00 7000.00
100.00%
S/. 263,894.53 S/. 263,894.53 17.67%