PRESUPUESTO INTERNO ITEM DESCRIPCIÓN UND METRADO P.U (S/.) PPTO. VENTA SUB TOTAL (S/.) PPTO. INTERNO P.U SUB TOTAL
Views 45 Downloads 4 File size 65KB
PRESUPUESTO INTERNO ITEM
DESCRIPCIÓN
UND
METRADO
P.U (S/.)
PPTO. VENTA SUB TOTAL (S/.)
PPTO. INTERNO P.U SUB TOTAL (S/.) (S/.)
ALCANTARILLAS - CABEZALES Y MUROS - CONRROGUI 1 2 3 4 5 6
ENCOFRADO Y DESENCOFRADO ENCOFRADO Y DESENCOFRADO BAJO AGUA HABILITACIÓN Y COLOCACIÓN DE ACERO COLOCACIÓN DE CONCRETO F'C=100 KG/CM2 COLOCACIÓN DE CONCRETO F'C=140 KG/CM2 COLOCACIÓN DE CONCRETO F'c=210 KG/CM2
COSTO DIRECTO GASTO GENERAL UTILIDAD COSTO TOTAL SIN IGV
m2 m2 Kg m3 m3 m3
24,043.36 24,043.36 982,528.32 2,128.00 2,000.00 10,649.10
45.79 45.79 1.34 55.93 55.93 55.93
8.00% 8.00%
1,101,010.37 1,101,010.37 1,316,587.95 119,012.02 111,853.40 595,569.02
4,345,043.13 347,603.45 347,603.45 5,040,250.03
37.53 45.18 0.96 22.73 22.73 22.73
9.58% 31.21%
902,347.30 1,086,279.00 943,227.19 48,369.44 45,460.00 242,054.04
3,267,736.98 416,455.83 1,356,057.22 5,040,250.03
ANALISIS DE GASTOS GENER Item 1.0
2.0
3.0
4.0
5.0
6.0
7.0
Descripcion DIRECCION TECNICA Residente de Obra Administrador / Almacenero Tec. Seguridad y Medio Ambiente
Und
Cantidad
mh mh mh
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
mm mm mm
2.00 2.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
gln/mes gln/mes gln/mes
360.00 360.00 180.00
1.00 1.00 1.00
1.00 1.00 1.00
EQUIPOS Cortadora de Metal Cortadora de Madera Generador Motobomba Impresora
und und und und und
3.00 3.00 1.00 2.00 1.00
-
-
IMPLEMENTOS DE SEGURIDAD Pantalon y Camisas Impermeable Chompas Cascos Lentes Chalecos Zapatos c/punta de acero Botas de Jebe c/punta de acero Guantes Tapon para Oido
und und und und und und und und und und
84.00 23.00 23.00 23.00 105.00 2.00 23.00 23.00 100.00 105.00
-
-
ALIMENTACION Alimentación Direccion Tecnica Alimentación Operarios Alimentacion Peones
mes mes mes
90.00 300.00 300.00
1.00 1.00 1.00
1.00 1.00 1.00
SERVICIOS Alquiler Oficina / Almacen Alquiler Hospedaje
mes mes
1.00 1.00
1.00 1.00
1.00 1.00
VEHICULOS Combi 15 psj. Diesel (Zona) Camion Baranda 4 Ton Diesel (Zona) Camioneta 4x2 (Zona)
COMBUSTIBLES Combi 15 psj. Diesel (Zona) Combi 15 psj. Diesel (Zona) Combi 15 psj. Diesel (Zona)
Sep'15
Oct'15
8.0
9.0
10.0
11.0
Item 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0
EQUIPAMIENTO OFICINA / HOSPEDAJE Escritorio + Silla Camas + Colchones
und und
2.00 14.00
MATERIALES INDIRECTOS Agua Potable - Bidon (20 litros) Botiquin Extintor Papel Oficina
bidon/mes und und glb
60.00 1.00 1.00 1.00
TRANSPORTE DE PERSONAL Mov. Aérea Lima-Obra-Lima Mov.Terrestre Lima-Obra-Lima
viaje/mes viaje/mes
12.00 30.00
mes mes mes
23.00 9.00% 23.00
SEGUROS Seguro Contra todo Riesgo (SCTR) ESSALUD Examenes Medicos
Descripcion DIRECCION TECNICA VEHICULOS COMBUSTIBLES EQUIPOS IMPLEMENTOS DE SEGURIDAD ALIMENTACION SERVICIOS EQUIPAMIENTO OFICINA / HOSPEDAJE MATERIALES INDIRECTOS TRANSPORTE DE PERSONAL SEGUROS Total
Costo Parcial 68,917.33 170,000.00 45,000.00 10,700.00 7,598.50 54,000.00 17,500.00 3,400.00 7,000.00 18,000.00 14,340.00 416,455.83
-
1.00 -
-
1.00 1.00 -
-
1.00 -
-
1.00 1.00 -
DE GASTOS GENERALES Nov'15
Dic'15 1.00 1.00 1.00
Ene'15 1.00 1.00 1.00
Total / Mes 1.00 1.00 1.00
5.00 5.00 5.00
Sueldo Basico 6,000.00 2,200.00 2,200.00
Liquidacion
Costo Parcial
9,760.00 3,578.67 3,578.67
39,760.00 14,578.67 14,578.67 68,917.33
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
5.00 5.00 5.00
7,000.00 7,000.00 6,000.00
-
70,000.00 70,000.00 30,000.00 170,000.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
5.00 5.00 5.00
10.00 10.00 10.00
-
18,000.00 18,000.00 9,000.00 45,000.00
-
-
-
1.00 1.00 1.00 1.00 1.00
600.00 500.00 3,500.00 1,800.00 300.00
-
1,800.00 1,500.00 3,500.00 3,600.00 300.00 10,700.00
-
-
-
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
42.00 20.00 20.00 8.00 2.50 35.00 44.00 44.00 4.00 2.00
-
3,528.00 460.00 460.00 184.00 262.50 70.00 1,012.00 1,012.00 400.00 210.00 7,598.50
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
5.00 5.00 5.00
20.00 20.00 10.00
-
9,000.00 30,000.00 15,000.00 54,000.00
1.00 1.00
1.00 1.00
1.00 1.00
5.00 5.00
1,500.00 2,000.00
-
7,500.00 10,000.00
17,500.00 -
-
-
1.00 1.00
300.00 200.00
-
600.00 2,800.00 3,400.00
1.00 -
1.00 -
1.00 -
5.00 1.00 1.00 1.00
12.00 200.00 1,200.00 2,000.00
-
3,600.00 200.00 1,200.00 2,000.00 7,000.00
-
-
-
1.00 1.00
750.00 300.00
-
9,000.00 9,000.00 18,000.00
1.00 1.00 -
1.00 1.00 -
1.00 1.00 -
5.00 5.00 1.00
60.00 10,400.00 120.00
-
6,900.00 4,680.00 2,760.00 14,340.00
Partida: ENCOFRADO Y DESENCOFRADO Rendimiento: 18.00 M2/DIA Costo unitario directo por: M2 Recursos
8 37.53 Unidad
Cuadrilla
Cantidad
Precio
Mano de Obra Operario Peon
hh hh
Materiales Alambre negro # 8 Clavos de 2" a 3" Desmoldante para madera Madera tornillo Tripley 18 mm
kg kg gln p2 pl
Herramientas Herramientas manuales
%
0.44444 0.44444
16.78 12.84
13.17 7.46 5.71
-
0.25000 0.25000 0.06000 1.50000 0.07000
4.50 4.50 90.00 5.50 115.00
23.96 1.13 1.13 5.40 8.25 8.05
-
0.03000
13.17
0.40 0.40
1.00 1.00
Partida: ENCOFRADO Y DESENCOFRADO BAJO AGUA Rendimiento: 18.00 M2/DIA Costo unitario directo por: M2 Recursos
Unidad
8 45.18 Cuadrilla
Cantidad
Precio
Mano de Obra Operario Peon
hh hh
Materiales Alambre negro # 8 Clavos de 2" a 3" Desmoldante para madera Madera tornillo Tripley 18 mm
kg kg gln p2 pl
Equipos Motobomba Herramientas manuales
hm %
1.00 2.00
-
0.20 -
16.78 12.84
18.87 7.46 11.41
0.25000 0.25000 0.06000 1.50000 0.07000
4.50 4.50 90.00 5.50 115.00
23.96 1.13 1.13 5.40 8.25 8.05
0.08889 0.03000
20.00 18.87
2.35 1.78 0.57 8 0.96
Unidad
Cuadrilla
Cantidad
Precio
Mano de Obra Operario Oficial
Parcial
0.44444 0.88889
Partida: HABILITACION DE ACERO Rendimiento: 300.00 KG/DIA Costo unitario directo por: KG Recursos
Parcial
hh hh
1.00 1.00
Parcial
0.02667 0.02667
16.78 14.24
0.83 0.45 0.38
Alambre negro # 16
Materiales kg
-
0.03000
3.50
0.11 0.11
Equipos Herramientas manuales
%
-
0.03000
0.83
0.02 0.02
Partida: COLOCACION DE CONCRETO Rendimiento: 25.00 M3/DIA Costo unitario directo por: M3 Recursos
8 22.73 Unidad
Cuadrilla
Cantidad
Precio
Mano de Obra
Parcial
Operario Peon
hh hh
2.00 2.00
0.64000 0.64000
16.78 12.84
18.96 10.74 8.22
Equipos Vibrador de concreto Herramientas manuales
hm %
1.00 -
0.32000 0.03000
10.00 18.96
3.77 3.20 0.57
Regimen General Descripcion Capataz Operario Oficial Peon
Sueldo Bruto
Horas Diarias
2,800.00 1,800.00 1,500.00 1,000.00
8.00 8.00 8.00 8.00
Essalud 9.00%
Liquidacion
252.00 162.00 135.00 90.00
821.33 528.00 440.00 293.33
P.U. Mensual 3,873.33 2,490.00 2,075.00 1,383.33
P.U. Diario 129.11 83.00 69.17 46.11
SCTR Salud: 1.4% del Sueldo Bruto. SCTR Vida: 1.4% del Sueldo Bruto. Regimen Construccion Civil Descripcion Salario Basico Bonificacion Unificada de Construccion BUC Movilidad Acumulada Overol (2*S/. 91.09) Leyes Sociales: Salario Basico (105.73%) Bonificacion Unica de Construccion (11.77%) Seguros (S/. 5.00 x mes) Total Diario Precio Unitario (hh) Capataz = 130% Operario Operario Oficial Peon Bonificacion de trabajos bajo el agua es el 20% de sus horas trabajadas.
Operario 52.10 16.67 7.68 0.60 55.09 1.96 0.15 134.25 16.78
Vigente al 01-07-14 Oficial Peon 44.10 39.40 13.23 11.82 7.68 7.68 0.60 0.60 46.63 1.56 0.15 113.94 14.24
41.66 1.39 0.15 102.70 12.84 21.82 16.78 14.24 12.84
P.U. Hora 16.14 10.38 8.65 5.76